Abstract

This paper introduces a preliminary risk assessment method carried out on a newly developed floating power plant. The small-scale floating power plant has been developed to provide electric power for areas on demand, and this is a kind of a new concept system which is not clearly classified in the maritime industry. To grant the feasibility for this novel system design, a set of risk assessment activities is essentially required, and in this context, a hazard identification (HAZID) study is conducted at the very early stage of the plant design. The aims of this HAZID study are to verify the inherent safety of the initial plant design and to provide any recommendations on the next design stages. For this purpose, the potential hazards are identified in view of personnel, structural, and asset effects in association with the operation of the power plant and all the identified hazards and relevant risks are assessed with the defined criteria using a simple risk matrix. As a result, the risk or safety level of the conceptual plant design is estimated, and some design changes are suggested to give a better balance between the safety and the cost of the plant system. Overall, this paper shows how the primitive risk assessment techniques are utilized as a practical engineering tool in the development of the marine system.

References

1.
Forester Media
,
2015
, “
DSME Displayed Floating Power Plant at Power-Gen International in Orlando Last December
,”
Forester Media
. http://foresternetwork.com/weekly/distributed-energy-weekly/energy/dsme-displayed-floating-power-plants-at-power-gen-international-in-orlando-last-december, Accessed January 10.
2.
Newsdesk
,
R.
,
2018
, “
LNG News: LNG Industry Poised to Adopt Floating Power Plants
,”
Riviera—LNG World Shipping
. http://www.lngworldshipping.com/news/view,lng-industry-poised-to-adopt-floating-power-plants_50389.htm, Accessed January 9.
3.
Wison Company News
,
2018
, “
Wison Offshore & Marine’s 300 MW FSRP Receives Approval in Principle From Lloyd’s Register
,”
Wison
. http://www.wison.com/en/read_page/951, Accessed September 19.
4.
IMO
,
2015
,
MSC-MEPC.2/Circ.12/Rev.1: Revised Guidelines for Formal Safety Assessment (FSA) for Use in the IMO Rule-Making Process
,
International Maritime Organization
,
London
.
5.
ABS
,
2017
,
Guidance Notes on Review and Approval of Novel Concepts
,
American Bureau of Shipping
,
Spring, TX
.
6.
DNV·GL
,
2017
,
Recommended Practice-A203: Technology Qualification
,
Det Norske Veritas and Germanischer Lloyd
,
Oslo
.
7.
LR
,
2017
,
Guidance Notes for Technology Qualification
,
Lloyd’s Register
,
London
.
8.
DNV·GL
,
2017
,
Offshore Standards-A101: Safety Principles and Arrangements
,
Det Norske Veritas and Germanischer Lloyd
,
Oslo
.
9.
CMPT
,
1999
,
A Guide to Quantitative Risk Assessment for Offshore Installations
,
The Centre for Marine and Petroleum Technology
,
Bristol
.
10.
SAFEDOR
. (
2005
). “
HAZID for LNG Tankers
,” Document ID: SAFEDOR-D-4.3.1-2005-11-29-LMG-HAZID LNG Tankers-rev-03, SAFEDOR Consortium, European Commission.
11.
HSE
,
1992
,
The Tolerability of Risk From Nuclear Power Stations
,
Health and Safety Executive
,
London
.
12.
Rodgers
,
L.
, and
Fletcher
,
G.
,
2014
, “
Indian Ocean Tsunami: Then and Now
,”
BBC
, https://www.bbc.com/news/world-asia-30034501, Accessed December 25, 2014.
13.
Clarke
,
H.
, and
Almasy
,
S.
,
2018
, “
Tsunami in Indonesia Kills at Least 222 Without Warning
”.
CNN
, https://edition.cnn.com/2018/12/22/asia/deadly-tsunami-indonesia/index.html, Accessed December 23, 2018.
You do not currently have access to this content.