The reliability of operation of a nuclear power plant substantially depends on the reliability of its individual components. Electric cables, particularly medium-voltage cables, represent an important constituent of the nuclear island as well as of the balance of the plant. It cannot be considered as satisfactory that the redundancy of a particular subsystem is ensured. For this purpose, it is important to check the cable insulation condition, which is supposed to be carried out during the overhaul activities. The lifetime of medium-voltage cables is estimated to attain somewhere around 40 years. However, due to electrical, thermal, and mechanical stresses, it may be significantly reduced. In order to avoid its likely failures and following outages, the insulation must be tested regularly. Based on obtained testing results, the condition of a cable or cable termination can be assessed and repaired or a replacement made, if necessary. The paper presents some of the most important nondestructive diagnostic measurements on cable connections recommended to be done during the overhaul of a nuclear power plant following a good practice of asset maintenance management.

References

1.
Jansa
,
M.
,
2001
,
Preskušanje izolacije srednjenapetostnih kablov in njihove opreme s pomočjo merjenja delnih razelektrenj
, EIMV, Elaborate 1527,
Milan Vidmar Electric Power Research Institute
,
Ljubljana, Slovenia
.
2.
Jansa
,
M.
,
2011
,
Smernice in navodila za izbiro, polaganje in prevzem elektroenergetskih kablov nazivne napetosti 1 kV do 35 kV
, EIMV, Elaborate 2090,
Milan Vidmar Electric Power Research Institute
,
Ljubljana, Slovenia
.
3.
Jansa
,
M.
,
2009
,
Verifikacija obratovalnih lastnosti in ugotavljanje ustreznosti energetskih SN kablov za uporabo v slovenskih SN distribucijskih omrežjih
, EIMV, Elaborate 1949,
Milan Vidmar Electric Power Research Institute
,
Ljubljana, Slovenia
.
4.
Minadeo
,
B.
,
2010
, “
MV Cables Condition Monitoring and Qualification Considerations
,” Power Point Presentation.
5.
TR-101245-V2
,
1995
,
Effect of DC Testing on Extruded Crosslinked Polyethylene Insulated Cables—Phase II
, EPRI,
Milan Vidmar Electric Power Research Institute
,
Ljubljana, Slovenia
.
6.
CIGRE
,
2003
,
Knowledge Rules for Partial Discharge Diagnosis in Service
Vol.
226
,
Task Force 15.11/33.03.02
,
CIGRE
.
7.
EPRI
,
1996
, “
Aging Management Guideline for Commercial Nuclear Power Plants—Cable and Terminations-Electrical Cable and Terminations
,”
EPRI Life Cycle Management Program
, .
8.
CIGRE
,
Guide for Partial Discharge Measurements in Compliance to IEC 60270
, Vol.
366
,
Working Group D1.33, CIGRE
.
9.
Schufft
,
W.
,
Hauschild
,
W.
,
Coors
,
P.
,
Weissenberg
,
W.
, and
Einenkel
,
W.
,
1995
, “
Dresden: Leistu. Resona. fuer die Vor-Ort-Pruef. von 110 kV-VPE-Kab
,”
Elektri
, Heft 25.
10.
Janša
,
M.
, and
Kobal
,
I.
,
2013
, “
Ugotavljanje stanja kabelske izolacije z uporabo kabelske diagnostike in preskušanjem
,”
Conference Sloko CIGRE
,
Milan Vidmar Electric Power Research Institute
,
Ljubljana, Slovenia
.
You do not currently have access to this content.