The design process is difficult to accelerate due to its iterative nature, which increases project cost and delays completion time of a design project. Many previous studies tried to find the optimal structure and sequence of a design process minimizing iteration. In a multiproject environment, however, waiting time caused by resource shortage is a more critical reason for a lengthy project than iteration time. In this paper, we propose a novel sequencing method that reduces waiting time in a multiproject environment by dynamically changing the sequence of design tasks, according to availability of resources. It is called a dynamic sequencing method, as opposed to the traditional static sequencing method by which every design project follows a predefined optimal sequence. In order to evaluate the effect of this method, we developed a design-process model for simulating iteration and waiting in a multiproject environment. The simulation results show that dynamic sequencing is significantly better than traditional static sequencing with respect to average duration of projects. It is noted that more significant improvements can be obtained for the bottlenecked and unbalanced processes, both of which conditions would otherwise have negative effects on process performance.

1.
Smith
,
R. P.
, and
Eppinger
,
S. D.
, 1997, “
A Predictive Model of Sequential Iteration in Engineering Design
,”
Manage. Sci.
,
43
(
8
), pp.
1104
1120
. 0025-1909
2.
Ulrich
,
K. T.
, and
Eppinger
,
S. D.
, 2003,
Product Design and Development
,
McGraw-Hill
,
New York, NY
.
3.
Smith
,
R. P.
, and
Eppinger
,
S. D.
, 1993, “
Characteristics and Models of Iteration in Engineering Design
,”
Proceedings of International Conference on Engineering Design
, The Hague, Netherlands, pp.
564
571
.
4.
Ahmadi
,
R.
,
Roemer
,
T. A.
, and
Wang
,
R. H.
, 2001, “
Structuring Product Development Processes
,”
Eur. J. Oper. Res.
,
130
(
3
), pp.
539
558
. 0377-2217
5.
Eppinger
,
S. D.
,
Whitney
,
D. E.
,
Smith
,
R. P.
, and
Gebala
,
D. A.
, 1994, “
A Model-Based Method for Organizing Tasks in Product Development
,”
Res. Eng. Des.
0934-9839,
6
(
1
), pp.
1
13
.
6.
Wheelwright
,
S. C.
, and
Clark
,
K. B.
, 1992, “
Creating Project Plans to Focus Product Development
,”
Harvard Bus. Rev.
,
70
(
2
), pp.
70
82
. 0017-8012
7.
Krishnan
,
V.
,
Eppinger
,
S. D.
, and
Whitney
,
D. E.
, 1997, “
A Model-Based Framework to Overlap Product Development Activities
,”
Manage. Sci.
,
43
(
4
), pp.
437
451
. 0025-1909
8.
Roemer
,
T. A.
, and
Reza
,
A.
, 2004, “
Concurrent Crashing and Overlapping in Product Development
,”
Oper. Res.
,
52
(
4
), pp.
606
622
. 0030-364X
9.
Roemer
,
T. A.
,
Reza
,
A.
, and
Wang
,
R. H.
, 2000, “
Time-Cost Trade-Offs in Overlapped Product Development
,”
Oper. Res.
,
48
(
6
), pp.
858
865
. 0030-364X
10.
Smith
,
R. P.
, and
Eppinger
,
S. D.
, 1997, “
Identifying Controlling Features of Engineering Design Iteration
,”
Manage. Sci.
,
43
(
3
), pp.
276
293
. 0025-1909
11.
Ahmadi
,
R.
, and
Wang
,
R. H.
, 1999, “
Managing Development Risk in Product Design Processes
,”
Oper. Res.
,
47
(
2
), pp.
235
246
. 0030-364X
12.
Andersson
,
J.
,
Phol
,
J.
, and
Eppinger
,
S. D.
, 1998, “
A Design Process Modeling Approach Incorporating Nonlinear Elements
,”
Proceedings of ASME International Design Engineering and Technical Conferences
, Atlanta, GA, Paper No. DETC98–5663.
13.
Browning
,
T. R.
, and
Eppinger
,
S. D.
, 2002, “
Modeling Impacts of Process Architecture on Cost and Schedule Risk in Product Development
,”
IEEE Trans. Eng. Manage.
0018-9391,
49
(
4
), pp.
428
442
.
14.
Cho
,
S. -H.
, and
Eppinger
,
S. D.
, 2005, “
A Simulation-Based Process Model for Managing Complex Design Projects
,”
IEEE Trans. Eng. Manage.
0018-9391,
52
(
3
), pp.
316
328
.
15.
Elonen
,
S.
, and
Artto
,
K. A.
, 2003, “
Problems in Managing Internal Development Projects in Multi-Project Environments
,”
Int. J. Proj. Manage.
,
21
(
6
), pp.
395
402
. 0263-7863
16.
Adler
,
P. S.
,
Mandelbaum
,
A.
,
Nguyen
,
V.
, and
Schwerer
,
E.
, 1995, “
From Project to Process Management: An Empirically-Based Framework for Analyzing Product Development Time
,”
Manage. Sci.
0025-1909,
41
(
3
), pp.
458
484
.
17.
Cohen
,
I.
,
Mandelbaum
,
A.
, and
Shtub
,
A.
, 2004, “
Multi-Project Scheduling and Control: A Process-Based Comparative Study of Critical Chain Methodology and Some Alternatives
,”
Proj. Manage. J.
8756-9728,
35
(
2
), pp.
39
50
.
18.
Anavi-Isakow
,
S.
, and
Golany
,
B.
, 2003, “
Managing Multi-Project Environments Through Constant Work-In-Process
,”
Int. J. Proj. Manage.
,
21
(
1
), pp.
9
18
. 0263-7863
19.
Cohen
,
I.
,
Golany
,
B.
, and
Shtub
,
A.
, 2005, “
Managing Stochastic, Finite Capacity, Multi-Project Systems Through the Cross-Entropy Methodology
,”
Ann. Operat. Res.
,
134
(
1
), pp.
183
199
. 0254-5330
20.
Narahari
,
Y.
,
Viswanadham
,
N.
, and
Kumar
,
V. K.
, 1999, “
Lead Time Modeling and Acceleration of Product Design and Development
,”
IEEE Trans. Rob. Autom.
1042-296X,
15
(
5
), pp.
882
896
.
21.
Yassine
,
A.
, and
Browning
,
T. R.
, 2001, “
Analyzing Multiple Product Development Projects Based on Information and Resource Constraints
,” Working paper, MIT, Cambridge, MA.
22.
Steward
,
D. V.
, 1981, “
The Design Structure System: A Method for Managing Design of Complex Systems
,”
IEEE Trans. Eng. Manage.
,
28
(
3
), pp.
71
74
. 0018-9391
23.
Abdelsalam
,
H. M. E.
, and
Bao
,
H. P.
, 2007, “
Re-Sequencing of Design Processes With Activity Stochastic Time and Cost: An Optimization-Simulation Approach
,”
ASME J. Mech. Des.
0161-8458,
129
(
2
), pp.
150
157
.
24.
Meier
,
C.
,
Yassine
,
A.
, and
Browning
,
T. R.
, 2007, “
Design Process Sequencing With Competent Genetic Algorithms
,”
ASME J. Mech. Des.
0161-8458,
129
(
6
), pp.
566
585
.
25.
Rogers
,
J. L.
,
McCully
,
C. M.
, and
Bloebaum
,
C. L.
, 1996, “
Integrating a Genetic Algorithm Into a Knowledge-Based System for Ordering Complex Design Processes
,” NASA, Technical Memorandum 110247.
26.
Altus
,
S. S.
,
Kroo
,
I. M.
, and
Gage
,
P. J.
, 1996, “
A Genetic Algorithm for Scheduling and Decomposition of Multidisciplinary Design Problems
,”
ASME J. Mech. Des.
0161-8458,
118
(
4
), pp.
486
489
.
27.
Murty
,
K. G.
, 1995,
Operations Research: Deterministic Optimization Models
,
Prentice-Hall
,
Englewood Cliffs, NJ
.
28.
Hölttä-Otto
,
K.
, and
de Weck
,
O.
, 2007, “
Degree of Modularity in Engineering Systems and Products With Technical and Business Constraints
,”
Concurr. Eng. Res. Appl.
1063-293X,
15
(
2
), pp.
113
124
.
You do not currently have access to this content.