Additive manufacturing (AM) is increasingly of interest for commercial and military applications due to its potential to create novel geometries with increased performance. For additive manufacturing to find commercial application, it must be cost competitive against traditional processes such as forging. Forecasting the production costs of future products prior to large-scale investment is challenging due to the limits of traditional cost accounting's ability to handle both the systemic process implications of new technologies and the cognitive biases in humans' additive and systemic estimates. Leveraging a method uniquely suited to these challenges, we quantify the production and use economics of an additively manufactured versus a traditionally forged GE engine bracket of equivalent performance for commercial aviation. Our results show that, despite the simplicity of the engine bracket, when taking into account the part redesign for AM and the associated lifetime fuel savings of the additively designed bracket, the additively manufactured part and design is cheaper than the forged one for a wide range of scenarios, including at higher volumes of 2000–12,000 brackets per year. Opportunities to further reduce costs include accessing lower material prices without compromising quality, producing vertical builds with equivalent performance to horizontal builds, and increasing process control so as to enable reduced testing. Given the conservative nature of our assumptions as well as our choice of part, these results suggest that there may be broader economic viability for additively manufactured parts, especially when systemic factors and use costs are incorporated.

Introduction

Additive manufacturing (AM) shows great promise in many industries as a low-cost, highly customizable production process for complex parts. AM, a three-dimensional production process, utilizes computer-aided design (CAD) to build objects layer-by-layer primarily via an energy source, typically a laser or an electron beam. AM has the potential to “reduce lead time, cost, material waste, [and] energy usage” [1]. Industries that may benefit from these advancements include aerospace, automotive, energy, and biomedical [2,3].

Additive manufacturing holds potential to supplant current production methods for high-cost, high-value parts such as aircraft turbine blades, which require expensive materials, complex geometries, and consistent microstructures, or where lightweighting or part consolidation may have high financial value. Due to its low material waste and reduced material usage through part design, AM can reduce material requirements for parts made with expensive materials. AM production can also, through redesign, produce lighter weight parts than traditional processes. These lightweight designs can have complex geometries that without AM would be impossible or very difficult to produce. For industries with high fuel use, such as the aerospace and automotive industries, these lightweight designs may provide significant cost savings as a result of reduced fuel consumption. That said, there remain concerns that AM-built parts could not consistently withstand the repetitive centrifugal pressure and loads endured by many of these parts, which can often be found in safety-critical applications [4].

For AM to be introduced into such applications, it must be cost competitive. Forecasting the production costs of future products prior to large-scale investment is challenging due to the limits of traditional cost accounting's ability to handle both the systemic process implications of new technologies and cognitive biases in humans' additive and systemic estimates. Here, we leverage a method uniquely suited to these challenges: process-based cost modeling (PBCM). We focus on the case of a GE engine bracket for civil aviation applications. This simple part allows us to create a conservative estimate of metal AM (MAM) cost-competitiveness without the likely additional benefits of parts consolidation. We quantify the production and use economics of an additively manufactured versus a traditionally forged bracket of equivalent performance for commercial aviation.

Our results show that, despite the simplicity of the engine bracket, when taking into account the part redesign for AM and the associated lifetime fuel savings of the additively designed bracket, the additively manufactured part and design is cheaper than the forged one for a wide range of scenarios, including at higher volumes of 2000–12,000 brackets per year. Opportunities to further reduce costs include reducing material prices without compromising quality, producing vertical builds with equivalent performance to horizontal builds, and increasing process control so as to enable reduced testing.

The rest of the paper is organized as follows: a discussion of our methods, background on the case study that we selected for analysis, additional details on our data collection and model development, a discussion of our results, and possible areas for future work.

Methods

Assessing the cost of new technologies prior to investment has been a long-standing challenge [58]. Most traditional costing methods, such as total cost of ownership or activity-based costing, rely on historical data and statistical or parametric methods to calculate cost [9,10] and are unable to capture the systemic implications of design (geometry), material, and process decisions prior to large-scale investment [9,11]. Recent advances in computational power and, in parallel, in simulation modeling techniques, however, have begun to enable significant experimentation, and hence time savings and cost-reduction, prior to investment [12]. Within this genre, a range of methods collectively referred to as technical cost modeling (TCM) have begun to explore the economic implications of new technologies [1315], and estimate production costs during early stages of product development [1618].2

A pioneer of generative costing methods, and the method built upon in this research, is process-based cost modeling (PBCM). PBCM was developed for analyzing the economics of emerging manufacturing processes prior to investment [19] and extended to show the implications of alternative design specifications and process operating conditions on production costs [11]. Today, process-based cost models have been used to assess material, design architecture, and process decisions ranging from composite automobile body production and assembly [20,21] to photonic and electronic semiconductor chip design [2225], to printed circuit board and optoelectronic transceiver assembly [24,26,27] and packaging [28,29].

The forecast of a PBCM is based on a detailed simulation of each step of the production process and the interaction across these steps in the full production system. For a given design, the model calculates the most efficient production facilities—i.e., the inputs (material, labor, energy, capital, and building space)—required to achieve a desired annual output of “good” parts given the technology or organizational capabilities of a producer (e.g., per process step cycle times, yields, downtimes, scrap rates, and plant-wide operating parameters). To achieve this goal, a PBCM maps the physical parameters of a new product or process design (for example, material and geometry requirements for the engine bracket) to its consequences for the production process (for example, cycle times, yields, and maintenance times), and in turn for the full manufacturing facility (here, machine and material requirements to achieve a desired output of good brackets). To transform this model of production for a new design to a model of cost, we simply multiply each of the inputs by its price (e.g., material prices, wages, electricity prices, machine prices, building prices, or land prices).

A PBCM consists of three main parts: decision rules, inputs, and model architecture. With the complete set of decision rules and inputs, the outcomes of any model can be reproduced. The architecture of the model has no consequence for outcomes; it is simply how the decision rules and input data are organized so as to maximize the model's user-friendliness, user-transparency, and developer flexibility.

The decision rules, which can be described in their entirety by a set of mathematical equations, can be found in Appendix A, which is available under the “Supplemental Materials” tab for this paper on the ASME Digital Collection. These mathematical equations describe both the relationship between design decisions and their consequences for process and also the operating rules of the production facility. We base these rules on production methods we observe on the shop floor for existing designs as well as any methods specific to the emerging design or production process being modeled.

The inputs for the model are based on empirical design and production data we collect with engineers in laboratories (in some cases for the emerging technology) and on-site at firms. To collect this data, we conduct interviews with experts to identify typical values for such inputs and how such inputs may change with production ramp-up and with broader contextual or environmental changes over time. We collected input data for 13 facility-wide variables as well as 13–21 variables for each process step. These variables for which we collected input data can be found in Tables 5A–5C, which are available under the “Supplemental Materials” tab for this paper on the ASME Digital Collection.

We then run sensitivity analyses and what-if scenarios across the full range of decision rules and production inputs expected by developers and observed across the firms, as well as potential future values expressed by engineers and firm respondents. This sensitivity analysis examines input ranges of several variables, including build orientation, material price, machine price, cycle times, and destructive testing to determine the effect of variation of each input on total unit cost.

Lightweighting Benefit Analysis.

To evaluate the lightweighting benefits of the additively manufactured parts, we calculate the net present value (NPV) of potential fuel savings achieved by using the lighter weight AM bracket. Using jet fuel price data from the last 15 yr (Fig. 1), we assess the jet fuel cost savings per kilogram per year for the highest, lowest, and average prices found across that 15 yr period [30].

Fig. 1
Jet fuel prices: 2000–2015 [30]
Fig. 1
Jet fuel prices: 2000–2015 [30]
Close modal

To calculate the fuel savings of the additively manufactured bracket over the traditional bracket, we estimate the lifetime fuel consumption of an aircraft per unit weight. Fuel use depends not only on the equipment using the fuel, but also on many other factors such as maintenance practices, airport traffic, and pilot skills. We assume that a 1% reduction in an aircraft's operating empty weight would approximately translate into a 1% reduction in the fuel needed (Table 1). We obtain the operating empty weight of several aircraft of the Boeing family (727–777) from Boeing's airplane characteristics for airport planning [31] and round them to two significant digits, as shown in Table 2.

Table 1

Annual saved fuel estimations per aircraft

ModelOEW (kg)1% OEW (kg)Saved fuel (gal/yr) (worst) (1 gal = 3.781 l)Saved fuel (gal/yr) (best) (1 gal = 3.781 l)
777-200140,000140070,00090,000
767-20080,00080030,00040,000
757-20060,00060025,00035,000
747-100160,0001600100,000135,000
737-10030,00030015,00025,000
727-10040,00040030,00040,000
ModelOEW (kg)1% OEW (kg)Saved fuel (gal/yr) (worst) (1 gal = 3.781 l)Saved fuel (gal/yr) (best) (1 gal = 3.781 l)
777-200140,000140070,00090,000
767-20080,00080030,00040,000
757-20060,00060025,00035,000
747-100160,0001600100,000135,000
737-10030,00030015,00025,000
727-10040,00040030,00040,000
Table 2

Annual saved fuel estimations per additively manufactured engine bracket

ModelSaved fuel per unit mass (gal/yr kg) (worst) (1 gal = 3.781 l)Saved fuel per unit mass (gal/yr kg) (best) (1 gal = 3.781 l)Saved fuel per bracket (gal/yr bracket) (worst) (1 gal = 3.781 l)Saved fuel per bracket (gal/yr bracket) (best) (1 gal = 3.781 l)
777-20050645064
767-20038503850
757-20042584258
747-10063846384
737-10050835083
727-1007510075100
Average5373
ModelSaved fuel per unit mass (gal/yr kg) (worst) (1 gal = 3.781 l)Saved fuel per unit mass (gal/yr kg) (best) (1 gal = 3.781 l)Saved fuel per bracket (gal/yr bracket) (worst) (1 gal = 3.781 l)Saved fuel per bracket (gal/yr bracket) (best) (1 gal = 3.781 l)
777-20050645064
767-20038503850
757-20042584258
747-10063846384
737-10050835083
727-1007510075100
Average5373

We then do a first-order estimation of fuel savings based on a method used by Boeing that provides the average fuel savings per year associated with a 1% reduction in fuel [32]. We compute the equivalent annual fuel savings per unit mass (Table 3), and multiply them by the weight savings of the modeled additive manufacturing bracket (1.66 kg). We use the average value of the savings across the different models as our reference. Assuming a constant fuel price, we compute the net present value (NPV) of those annual savings over 10 yr using a 7% discount rate via the following equation:

Table 3

Jet fuel prices used to compute fuel savings

CaseFuel price ($/gal) (1 gal = 3.781 l)
Lowest0.52
Recent1.72
Highest3.89
CaseFuel price ($/gal) (1 gal = 3.781 l)
Lowest0.52
Recent1.72
Highest3.89
(1)

where N is the number of years, r is the discount rate, S is the average annual fuel savings, and pfuel is the jet fuel prices. Plugging our best and worst fuel values found in Table 1 into Eq. (1), we obtain the ranges for the net present value of the fuel savings (see Table 4). The two last columns in Table 2 contain the estimated interval for the annual fuel savings from the reference document.

Table 4

Net present value estimation of fuel savings per additively manufactured bracket

P_fuel = 0.52 $/gal (1 gal = 3.781 l)P_fuel = 1.72 $/gal (1 gal = 3.781 l)P_fuel = 3.89 $/gal (1 gal = 3.781 l)
NPV (best) ($)NPV (worst) ($)NPV (best) ($)NPV (worst) ($)NPV (best) ($)NPV (worst) ($)
5003001500110033002400
P_fuel = 0.52 $/gal (1 gal = 3.781 l)P_fuel = 1.72 $/gal (1 gal = 3.781 l)P_fuel = 3.89 $/gal (1 gal = 3.781 l)
NPV (best) ($)NPV (worst) ($)NPV (best) ($)NPV (worst) ($)NPV (best) ($)NPV (worst) ($)
5003001500110033002400
Table 5

Generic inputs and variable names for each process step (including AM testing)

Production, postprocessing stepsEquation variable
InputUnitsAdditive manufacturingForging, postprocessing
Load/unload/setup timehTiuTiu
Preheat time (AM)hTip
Build time (AM), cycle timehTibTiy
Cooling time (AM)hTiCo
FloorspaceM2DimensionsPerLineiDimensionsPerLinei
Main machine price$PiMPiM
Auxiliary equipment price$PiAPiA
Tools per lineToolsToolsPerLineiToolsPerLinei
Fixture/tooling price$PiFPiF
Maintenance$, %Pimaint, αimaintPimaint, αimaint
Overhead%αiOαiO
Electricity usagekWhUE,onUE,on
Batch sizeBracketsBatchiBatchi
Reject rate%riri
Scrap rate%sisi
Unplanned downtimeh/dayUDi
Testing
InputUnitsEquation variable
Destructive testingRatioD
Production, postprocessing stepsEquation variable
InputUnitsAdditive manufacturingForging, postprocessing
Load/unload/setup timehTiuTiu
Preheat time (AM)hTip
Build time (AM), cycle timehTibTiy
Cooling time (AM)hTiCo
FloorspaceM2DimensionsPerLineiDimensionsPerLinei
Main machine price$PiMPiM
Auxiliary equipment price$PiAPiA
Tools per lineToolsToolsPerLineiToolsPerLinei
Fixture/tooling price$PiFPiF
Maintenance$, %Pimaint, αimaintPimaint, αimaint
Overhead%αiOαiO
Electricity usagekWhUE,onUE,on
Batch sizeBracketsBatchiBatchi
Reject rate%riri
Scrap rate%sisi
Unplanned downtimeh/dayUDi
Testing
InputUnitsEquation variable
Destructive testingRatioD
Table 6

Generic facility-wide inputs and variable names

Facility-wide inputs
InputUnitsEquation variable
Facility-wide operational parameters
Working days/yeardays/yrDPY
No shiftsh/dayNS
Unpaid breaksh/dayUB
Paid breaksh/dayPB
Unplanned downtimeh/dayUD
Facility-wide prices
Direct wage (with benefits)$/yrCalculates hourly wage
Hourly direct wage (with benefits)$/hPl
Price of electricity$/kWhPE
Price of building space$/m2PB
Factory lifetimes
Capital recovery periodyrNC
Building recovery periodyrNB
Tooling recovery periodyrNP
Discount rate%r
Facility-wide inputs
InputUnitsEquation variable
Facility-wide operational parameters
Working days/yeardays/yrDPY
No shiftsh/dayNS
Unpaid breaksh/dayUB
Paid breaksh/dayPB
Unplanned downtimeh/dayUD
Facility-wide prices
Direct wage (with benefits)$/yrCalculates hourly wage
Hourly direct wage (with benefits)$/hPl
Price of electricity$/kWhPE
Price of building space$/m2PB
Factory lifetimes
Capital recovery periodyrNC
Building recovery periodyrNB
Tooling recovery periodyrNP
Discount rate%r
Table 7

Generic material inputs and variable names

Materials
InputUnitsEquation variable
Price$/kg (Ti64), $/L (gas)Pm
Material usage rateL/h (gas)G
Bracket masskg/bracketXm
Materials
InputUnitsEquation variable
Price$/kg (Ti64), $/L (gas)Pm
Material usage rateL/h (gas)G
Bracket masskg/bracketXm

Case Selection

To assess the cost of a MAM design versus a traditional one, we chose a simple one-to-one part redesign for which performance equivalency with the traditional part had been tested. This simple part allows us to create a conservative estimate of MAM cost-competitiveness without the likely additional benefits of parts consolidation. We sought a publicly available part design for which full data could be shared in a publication, and where both the traditional and MAM redesigned parts serve the same functional purpose. The case we chose, the “TJ2” aerospace engine bracket, which won second place in the GE Engine Bracket Challenge, provides an ideal case study. The engine bracket has public designs for both additive and conventional manufacturing, and while the two designs serve the same function, the additive design boasts a >80% weight reduction over the conventional design (while retaining all required mechanical properties for industrial use) [33]. As can be seen in Fig. 2(b), the additive design would be extremely difficult or impossible to produce via traditional manufacturing. The material for both the conventional and the additively manufactured bracket is the titanium alloy Ti–6Al–4V (Ti64), an industry standard for high-temperature applications, known for being light weight, high strength, and corrosion resistant. In 2015, GE sold over 3300 engines [34]. If this engine bracket were installed at four brackets per engine in all of those sales, then this would total an annual production volume of approximately 13,500.

Fig. 2
(a) Conventional engine bracket design [33] and (b) additive manufacturing engine bracket design [33], which boasts an approximately 80% weight reduction from the conventional design shown in Fig. 2(a)
Fig. 2
(a) Conventional engine bracket design [33] and (b) additive manufacturing engine bracket design [33], which boasts an approximately 80% weight reduction from the conventional design shown in Fig. 2(a)
Close modal

Process Data Collection and Model Development

To collect information on the process steps and commercial production operations requirements, we worked with 14 companies, including metal additive manufacturing product producers, material, and equipment suppliers, as well as one of the three university laboratories in the country with commercial-grade direct metal laser sintering (DMLS) and electron beam melting (EBM) machines. The specific commercial-grade machines at the university laboratory are from Arcam (S12 model) and EOS (M290 model).

Process Flow and Process Step Inputs.

The process flow for each of the four systems is shown in Fig. 3. A comprehensive list of inputs can be found in Appendix B, Tables 6A–6C, which are available under the “Supplemental Materials” tab for this paper on the ASME Digital Collection. The facility-wide inputs, which are the same for all four systems, are shown in Table 11. The sources of the data collected can be found in Appendix B, Tables 7A–7C, which are available under the “Supplemental Materials” tab for this paper on the ASME Digital Collection.

Fig. 3
AM model functionality for metal engine bracket. Both DMLS processes 1 and 2 follow the DMLS process flow.
Fig. 3
AM model functionality for metal engine bracket. Both DMLS processes 1 and 2 follow the DMLS process flow.
Close modal
Table 10

Data collected: base case inputs for the forging steps

Forging inputs, base caseInduction heatingForgingHeat treatmentGrinderMulti axis millWire EDM
Main machine price$100,000250,00050,00080,000399,950184,950
Auxiliary equipment price$15,00012,5005000800039,99518,495
Fixture/tooling price$15,00010,0002500400019,9989248
Maintenance cost$15,00012,5002875460022,9972390
Overhead costs$975020,43817,25027,600137,98363,808
Electricity usagekWh4550364188
Batch sizekg/batch5220126
Footprint (floorspace)m28505141316
Load + unload timeh001012
Cycle timeh006126
Scrap rate%13005105
Reject rate%121522
Unplanned downtime% of day222222
Forging inputs, base caseInduction heatingForgingHeat treatmentGrinderMulti axis millWire EDM
Main machine price$100,000250,00050,00080,000399,950184,950
Auxiliary equipment price$15,00012,5005000800039,99518,495
Fixture/tooling price$15,00010,0002500400019,9989248
Maintenance cost$15,00012,5002875460022,9972390
Overhead costs$975020,43817,25027,600137,98363,808
Electricity usagekWh4550364188
Batch sizekg/batch5220126
Footprint (floorspace)m28505141316
Load + unload timeh001012
Cycle timeh006126
Scrap rate%13005105
Reject rate%121522
Unplanned downtime% of day222222
Table 11

Facility-wide inputs

Base case inputs: facility-wide
InputUnitsValue
Working days/yeardays/yr332
No shiftsh/day0
Unpaid breaksh/day1.5
Paid breaksh/day1.5
Unplanned downtimeh/day0.5
Facility-wide prices
Direct wage (w/benefits)$/yr60,826
Price of electricity$/kWh0.08
Price of building space$/m21500
Hourly direct wage (w/benefits)$/h32
Factory lifetimes
Capital recovery periodyr7
Building recovery periodyr10
Tooling recovery periodyr7
Discount rate%10
Base case inputs: facility-wide
InputUnitsValue
Working days/yeardays/yr332
No shiftsh/day0
Unpaid breaksh/day1.5
Paid breaksh/day1.5
Unplanned downtimeh/day0.5
Facility-wide prices
Direct wage (w/benefits)$/yr60,826
Price of electricity$/kWh0.08
Price of building space$/m21500
Hourly direct wage (w/benefits)$/h32
Factory lifetimes
Capital recovery periodyr7
Building recovery periodyr10
Tooling recovery periodyr7
Discount rate%10
Table 12

Additive manufacturing input sources

DMLS 1DMLS 2EBM (includes powder recovery)
Load/unload/setup timeBaseAM equipment supplierAM equipment supplierAcademia
Preheat timeBaseAM equipment supplierAM equipment supplierAuthor estimate, AM equipment supplier
Build time (AM)BestAcademiaAM equipment supplierAcademia
BaseAcademia: build simulationAM equipment supplier: build simulationAcademia: build simulation
WorstAcademiaAM equipment supplierAcademia
Cooling timeBaseAM equipment supplierAM equipment supplierAM equipment supplier
FloorspaceBaseAM equipment supplierAM equipment supplierAM equipment supplier
Main machine priceBestAuthor estimate, AM equipment supplierAM equipment supplierAuthor estimate: −10% of main machine base price
BaseAM equipment supplierAM equipment supplierAM equipment supplier
WorstAuthor estimate, AM equipment supplierAM equipment supplierAuthor estimate: +10% of main machine base price
Auxiliary equipment priceBaseAM equipment supplierAM equipment supplierAM equipment supplier
Maintenance costBaseEquipment supplierAM equipment supplierAM equipment supplier
Overhead costBaseAuthor estimate: assumed 5% of main machine priceAuthor estimate: assumed 5% of main machine priceAuthor estimate—assumed 5% of main machine price
Electricity usageBestAuthor estimate: assumed −10% of base electricityAM equipment supplierAM equipment supplier
BaseAM equipment supplierAM equipment supplierAM equipment supplier
WorstAuthor estimate: assumed +10%AM equipment supplierAM equipment supplier
Batch sizeBestAcademiaAM equipment supplierAcademia
BaseAcademiaAM equipment supplierAcademia
WorstAcademiaAM equipment supplierAcademia
Reject rateBestAM equipment supplier, academia, author estimate, AM manufacturerAM equipment supplier, academia, author estimate, AM manufacturerAM equipment supplier, academia, author estimate, AM manufacturer
BaseAM equipment supplier, academia, author estimate, AM manufacturerAM equipment supplier, academia, author estimate, AM manufacturer'AM equipment supplier, academia, author estimate, AM manufacturer'
WorstAM equipment supplier, academia, author estimate, AM manufacturerAM equipment supplier, academia, author estimate, AM manufacturerAM equipment supplier, academia, author estimate, AM manufacturer
Scrap rateBestAM equipment supplier, academia, author estimate, AM manufacturerAM equipment supplier, academia, author estimate, AM manufacturerAM equipment supplier, academia, author estimate, AM manufacturer
BaseAM equipment supplier, academia, author estimate, AM manufacturerAM equipment supplier, academia, author estimate, AM manufacturerAM equipment supplier, academia, author estimate, AM manufacturer
WorstAM equipment supplier, academia, author estimate, AM manufacturerAM equipment supplier, academia, author estimate, AM manufacturerAM equipment supplier, academia, author estimate, AM manufacturer
Unplanned downtimeBaseAM equipment supplierAM equipment supplierAuthor estimate, AM equipment supplier
Fixture/tooling: priceBaseAuthor estimate—5% of main machine priceAuthor estimate—5% of main machine priceAM equipment supplier
Ti 64: priceBestAM manufacturerAM manufacturerAuthor estimate, AM manufacturer
BaseAM equipment supplierAM equipment supplierAM equipment supplier
WorstAuthor estimate, academia, AM equipment supplierAuthor estimate, academia, AM equipment supplierAuthor estimate, academia
Gas: priceBasePublic sourcePublic sourcePublic source
Gas flow rateBaseAM equipment supplierAM equipment supplierPublic source
DMLS 1DMLS 2EBM (includes powder recovery)
Load/unload/setup timeBaseAM equipment supplierAM equipment supplierAcademia
Preheat timeBaseAM equipment supplierAM equipment supplierAuthor estimate, AM equipment supplier
Build time (AM)BestAcademiaAM equipment supplierAcademia
BaseAcademia: build simulationAM equipment supplier: build simulationAcademia: build simulation
WorstAcademiaAM equipment supplierAcademia
Cooling timeBaseAM equipment supplierAM equipment supplierAM equipment supplier
FloorspaceBaseAM equipment supplierAM equipment supplierAM equipment supplier
Main machine priceBestAuthor estimate, AM equipment supplierAM equipment supplierAuthor estimate: −10% of main machine base price
BaseAM equipment supplierAM equipment supplierAM equipment supplier
WorstAuthor estimate, AM equipment supplierAM equipment supplierAuthor estimate: +10% of main machine base price
Auxiliary equipment priceBaseAM equipment supplierAM equipment supplierAM equipment supplier
Maintenance costBaseEquipment supplierAM equipment supplierAM equipment supplier
Overhead costBaseAuthor estimate: assumed 5% of main machine priceAuthor estimate: assumed 5% of main machine priceAuthor estimate—assumed 5% of main machine price
Electricity usageBestAuthor estimate: assumed −10% of base electricityAM equipment supplierAM equipment supplier
BaseAM equipment supplierAM equipment supplierAM equipment supplier
WorstAuthor estimate: assumed +10%AM equipment supplierAM equipment supplier
Batch sizeBestAcademiaAM equipment supplierAcademia
BaseAcademiaAM equipment supplierAcademia
WorstAcademiaAM equipment supplierAcademia
Reject rateBestAM equipment supplier, academia, author estimate, AM manufacturerAM equipment supplier, academia, author estimate, AM manufacturerAM equipment supplier, academia, author estimate, AM manufacturer
BaseAM equipment supplier, academia, author estimate, AM manufacturerAM equipment supplier, academia, author estimate, AM manufacturer'AM equipment supplier, academia, author estimate, AM manufacturer'
WorstAM equipment supplier, academia, author estimate, AM manufacturerAM equipment supplier, academia, author estimate, AM manufacturerAM equipment supplier, academia, author estimate, AM manufacturer
Scrap rateBestAM equipment supplier, academia, author estimate, AM manufacturerAM equipment supplier, academia, author estimate, AM manufacturerAM equipment supplier, academia, author estimate, AM manufacturer
BaseAM equipment supplier, academia, author estimate, AM manufacturerAM equipment supplier, academia, author estimate, AM manufacturerAM equipment supplier, academia, author estimate, AM manufacturer
WorstAM equipment supplier, academia, author estimate, AM manufacturerAM equipment supplier, academia, author estimate, AM manufacturerAM equipment supplier, academia, author estimate, AM manufacturer
Unplanned downtimeBaseAM equipment supplierAM equipment supplierAuthor estimate, AM equipment supplier
Fixture/tooling: priceBaseAuthor estimate—5% of main machine priceAuthor estimate—5% of main machine priceAM equipment supplier
Ti 64: priceBestAM manufacturerAM manufacturerAuthor estimate, AM manufacturer
BaseAM equipment supplierAM equipment supplierAM equipment supplier
WorstAuthor estimate, academia, AM equipment supplierAuthor estimate, academia, AM equipment supplierAuthor estimate, academia
Gas: priceBasePublic sourcePublic sourcePublic source
Gas flow rateBaseAM equipment supplierAM equipment supplierPublic source
Table 13

Postprocessing input sources

Heat treatWire EDMHIPShot peening
Main machine priceBestAuthor estimate: −10% main machine priceAuthor estimate: −10% of main machine base priceAuthor estimate: −10% of main machine priceAuthor estimate: −10% of main machine price
BaseEquipment supplierEquipment supplierEquipment supplierAM equipment supplier
WorstAuthor estimate: +20% main machine priceEquipment supplierAuthor estimate: +10% of main machine priceAuthor estimate: +10% of main machine price
Auxiliary equipment priceBaseAuthor estimate: 10% of main machine priceAuthor estimate: 10% of main machine priceEquipment supplierAuthor estimate: 10% of main machine price
Fixture/tooling priceBaseAuthor estimate: 5% of main machine priceAuthor estimate: 5% of main machine priceEquipment supplierAuthor estimate: 5% of main machine price
Maintenance costBaseAuthor estimate: 5% of main machine price, auxiliary equipment price, and fixture/tooling priceEquipment supplierEquipment supplierAuthor estimate: 5% of main machine price, auxiliary equipment price, and fixture/tooling price
Overhead costsBaseAuthor estimate: 30% of main machine price, auxiliary equipment price, and fixture/tooling priceAuthor estimate: 30% of main machine price, auxiliary equipment price, and fixture/tooling priceAuthor estimate: 30% of main machine price, auxiliary equipment price, and fixture/tooling priceAuthor estimate: 30% of main machine price, auxiliary equipment price, and fixture/tooling price
Electricity usageBaseEquipment supplierEquipment supplier, author calculationEquipment supplierAM equipment supplier
Batch sizeBaseAuthor estimate: 1 plate/batchAuthor estimate, public sourceEquipment supplierAuthor estimate: batch size of 1
Footprint (floorspace)BaseEquipment supplierEquipment supplierEquipment supplierAM equipment supplier
Load + unload timeBaseAcademiaAuthor estimateEquipment supplierAuthor estimate
Cycle timeBestAuthor calculation based on Ref. [35]Author estimate: base cycle time −2 hEquipment supplierAuthor estimate: base −10 min
BaseAuthor calculation based on Ref. [35]Author estimate, AM manufacturerEquipment supplierAuthor estimate based on Ref. [36]
WorstAuthor calculation based on Ref. [35]Author estimate: base cycle time +2 hEquipment supplierAuthor estimate: base +30 min
Scrap rateBaseAuthor estimate, academia, AM equipment supplierAuthor estimateAuthor estimateAuthor estimate
Reject rateBaseAuthor estimate, academia, AM equipment supplierAuthor estimateAuthor estimateAuthor estimate
Material useBaseN/AN/AEquipment supplier, author estimateN/A
Heat treatWire EDMHIPShot peening
Main machine priceBestAuthor estimate: −10% main machine priceAuthor estimate: −10% of main machine base priceAuthor estimate: −10% of main machine priceAuthor estimate: −10% of main machine price
BaseEquipment supplierEquipment supplierEquipment supplierAM equipment supplier
WorstAuthor estimate: +20% main machine priceEquipment supplierAuthor estimate: +10% of main machine priceAuthor estimate: +10% of main machine price
Auxiliary equipment priceBaseAuthor estimate: 10% of main machine priceAuthor estimate: 10% of main machine priceEquipment supplierAuthor estimate: 10% of main machine price
Fixture/tooling priceBaseAuthor estimate: 5% of main machine priceAuthor estimate: 5% of main machine priceEquipment supplierAuthor estimate: 5% of main machine price
Maintenance costBaseAuthor estimate: 5% of main machine price, auxiliary equipment price, and fixture/tooling priceEquipment supplierEquipment supplierAuthor estimate: 5% of main machine price, auxiliary equipment price, and fixture/tooling price
Overhead costsBaseAuthor estimate: 30% of main machine price, auxiliary equipment price, and fixture/tooling priceAuthor estimate: 30% of main machine price, auxiliary equipment price, and fixture/tooling priceAuthor estimate: 30% of main machine price, auxiliary equipment price, and fixture/tooling priceAuthor estimate: 30% of main machine price, auxiliary equipment price, and fixture/tooling price
Electricity usageBaseEquipment supplierEquipment supplier, author calculationEquipment supplierAM equipment supplier
Batch sizeBaseAuthor estimate: 1 plate/batchAuthor estimate, public sourceEquipment supplierAuthor estimate: batch size of 1
Footprint (floorspace)BaseEquipment supplierEquipment supplierEquipment supplierAM equipment supplier
Load + unload timeBaseAcademiaAuthor estimateEquipment supplierAuthor estimate
Cycle timeBestAuthor calculation based on Ref. [35]Author estimate: base cycle time −2 hEquipment supplierAuthor estimate: base −10 min
BaseAuthor calculation based on Ref. [35]Author estimate, AM manufacturerEquipment supplierAuthor estimate based on Ref. [36]
WorstAuthor calculation based on Ref. [35]Author estimate: base cycle time +2 hEquipment supplierAuthor estimate: base +30 min
Scrap rateBaseAuthor estimate, academia, AM equipment supplierAuthor estimateAuthor estimateAuthor estimate
Reject rateBaseAuthor estimate, academia, AM equipment supplierAuthor estimateAuthor estimateAuthor estimate
Material useBaseN/AN/AEquipment supplier, author estimateN/A
Table 14

Forging input sources

Forging sourcesInduction heatingForgingHeat treatmentGrinderMulti axis millWire EDM
Main machine priceEquipment supplierForging association discussionEquipment supplierEquipment supplierEquipment supplierEquipment supplier
Auxiliary equipment priceAuthor estimate: 10% of main machine priceAuthor estimate: 5% of main machine priceAuthor estimate: 10% of main machine priceAuthor estimate: 10% of main machine priceAuthor estimate: 10% of main machine priceAuthor estimate: 10% of main machine price
Fixture/tooling priceAuthor estimate: 10% of main machine priceForging association discussionAuthor estimate: 5% of main machine priceAuthor estimate: 5% of main machine priceAuthor estimate: 5% of main machine priceAuthor estimate: 5% of main machine price
Maintenance costAuthor estimate: 10% of main machine priceAuthor estimate: 5% of main machine priceAuthor estimate: 5% of main machine price, auxiliary equipment price, and fixture/tooling priceAuthor estimate: 5% of main machine priceAuthor estimate: 5% of main machine priceEquipment supplier
Overhead costsAuthor estimate: 7.5% of main machine price, auxiliary equipment price, and fixture/tooling priceAuthor estimate: 7.5% of main machine price, auxiliary equipment price, and fixture/tooling priceAuthor estimate: 30% of main machine price, auxiliary equipment price, and fixture/tooling priceAuthor estimate: 30% of main machine price, auxiliary equipment price, and fixture/tooling priceAuthor estimate: 30% of main machine price, auxiliary equipment price, and fixture/tooling priceEquipment supplier
Electricity usageAuthor calculation, equipment supplierEquipment supplierEquipment supplierEquipment supplierEquipment supplierAuthor estimate: 30% of main machine price, auxiliary equipment price, and fixture/ tooling price
Batch sizeAuthor calculation, equipment supplierForging association discussionAuthor estimateEquipment supplier, author estimateEquipment supplier, author estimateEquipment supplier, author calculation
Footprint (floorspace)Equipment supplierAuthor estimateEquipment supplierEquipment supplierEquipment supplierAuthor estimate
Load + unload timeAuthor estimateForging association discussionAcademiaAuthor estimateAuthor estimateEquipment supplier
Cycle timeAuthor calculation, equipment supplierForging association discussionAuthor calculation based on Ref. [35]Author estimateAuthor estimateAuthor estimate
Scrap rateAuthor estimateForging association discussionAuthor estimate, academia, AM equipment supplierAuthor estimateAuthor estimateAuthor estimate, AM manufacturer
Reject rateAuthor estimateForging association discussionAuthor estimate, academia, AM equipment supplierAuthor estimateAuthor estimateAuthor estimate
Unplanned downtimeAuthor estimateAuthor estimateAuthor estimateAuthor estimateAuthor estimateAuthor estimate
Forging sourcesInduction heatingForgingHeat treatmentGrinderMulti axis millWire EDM
Main machine priceEquipment supplierForging association discussionEquipment supplierEquipment supplierEquipment supplierEquipment supplier
Auxiliary equipment priceAuthor estimate: 10% of main machine priceAuthor estimate: 5% of main machine priceAuthor estimate: 10% of main machine priceAuthor estimate: 10% of main machine priceAuthor estimate: 10% of main machine priceAuthor estimate: 10% of main machine price
Fixture/tooling priceAuthor estimate: 10% of main machine priceForging association discussionAuthor estimate: 5% of main machine priceAuthor estimate: 5% of main machine priceAuthor estimate: 5% of main machine priceAuthor estimate: 5% of main machine price
Maintenance costAuthor estimate: 10% of main machine priceAuthor estimate: 5% of main machine priceAuthor estimate: 5% of main machine price, auxiliary equipment price, and fixture/tooling priceAuthor estimate: 5% of main machine priceAuthor estimate: 5% of main machine priceEquipment supplier
Overhead costsAuthor estimate: 7.5% of main machine price, auxiliary equipment price, and fixture/tooling priceAuthor estimate: 7.5% of main machine price, auxiliary equipment price, and fixture/tooling priceAuthor estimate: 30% of main machine price, auxiliary equipment price, and fixture/tooling priceAuthor estimate: 30% of main machine price, auxiliary equipment price, and fixture/tooling priceAuthor estimate: 30% of main machine price, auxiliary equipment price, and fixture/tooling priceEquipment supplier
Electricity usageAuthor calculation, equipment supplierEquipment supplierEquipment supplierEquipment supplierEquipment supplierAuthor estimate: 30% of main machine price, auxiliary equipment price, and fixture/ tooling price
Batch sizeAuthor calculation, equipment supplierForging association discussionAuthor estimateEquipment supplier, author estimateEquipment supplier, author estimateEquipment supplier, author calculation
Footprint (floorspace)Equipment supplierAuthor estimateEquipment supplierEquipment supplierEquipment supplierAuthor estimate
Load + unload timeAuthor estimateForging association discussionAcademiaAuthor estimateAuthor estimateEquipment supplier
Cycle timeAuthor calculation, equipment supplierForging association discussionAuthor calculation based on Ref. [35]Author estimateAuthor estimateAuthor estimate
Scrap rateAuthor estimateForging association discussionAuthor estimate, academia, AM equipment supplierAuthor estimateAuthor estimateAuthor estimate, AM manufacturer
Reject rateAuthor estimateForging association discussionAuthor estimate, academia, AM equipment supplierAuthor estimateAuthor estimateAuthor estimate
Unplanned downtimeAuthor estimateAuthor estimateAuthor estimateAuthor estimateAuthor estimateAuthor estimate
Table 8

Data collected: base case inputs for the additive manufacturing step

Additive manufacturing inputs
InputUnitsDMLS 1DMLS 2EBM
Load/unload/setup timeh112.1
Preheat timeh0.200.5
Build time (AM)h19.537.315.7
Cooling timeh025.5
Floorspacem213.21216.8
Price$600,000650,0001,100,000
Auxiliary equipment price$30,00065,000(Included in main machine price)
Maintenance cost$60,00034,54050,000
Overhead cost$30,00032,50055,000
Electricity usagekWh8.61.40.8
Batch sizeBrackets242
Reject rate%744
Scrap rate%51010
Unplanned downtimeh/day0.80.750.75
Information only: assumptions that inform inputs
InformationUnitsDMLS 1DMLS 2EBM
Layer thicknessμm606070
Build chamber sizemm250 × 250 × 325245 × 245 × 300200 × 200 × 180
Particle sizeμm352770
Additive manufacturing inputs
InputUnitsDMLS 1DMLS 2EBM
Load/unload/setup timeh112.1
Preheat timeh0.200.5
Build time (AM)h19.537.315.7
Cooling timeh025.5
Floorspacem213.21216.8
Price$600,000650,0001,100,000
Auxiliary equipment price$30,00065,000(Included in main machine price)
Maintenance cost$60,00034,54050,000
Overhead cost$30,00032,50055,000
Electricity usagekWh8.61.40.8
Batch sizeBrackets242
Reject rate%744
Scrap rate%51010
Unplanned downtimeh/day0.80.750.75
Information only: assumptions that inform inputs
InformationUnitsDMLS 1DMLS 2EBM
Layer thicknessμm606070
Build chamber sizemm250 × 250 × 325245 × 245 × 300200 × 200 × 180
Particle sizeμm352770
Table 9

Data collected: base case inputs for the postprocessing steps

Postprocessing inputs
InputUnitsHeat treatWire EDMHIPShot peen
Main machine price$50,000184,9502,500,0009990
Auxiliary equipment price$500018,495100,000999
Fixture/tooling price$25009247.510,0004995
Maintenance cost$28752390100799
Overhead costs$17,25063,808783,0004795
Electricity usagekWh367.812000.2
Batch sizeBrackets/batch262801
Footprint (floorspace)m25.416.01003.1
Load + unload timeh0.51.560.25
Cycle timeh5.86160.5
Material usecu ft per cycle6000
Scrap rate%0522
Reject rate%1221
Postprocessing inputs
InputUnitsHeat treatWire EDMHIPShot peen
Main machine price$50,000184,9502,500,0009990
Auxiliary equipment price$500018,495100,000999
Fixture/tooling price$25009247.510,0004995
Maintenance cost$28752390100799
Overhead costs$17,25063,808783,0004795
Electricity usagekWh367.812000.2
Batch sizeBrackets/batch262801
Footprint (floorspace)m25.416.01003.1
Load + unload timeh0.51.560.25
Cycle timeh5.86160.5
Material usecu ft per cycle6000
Scrap rate%0522
Reject rate%1221

For the MAM process flow, we assume that a user has already optimized the part design, converted it to a stereolithography (STL) file, and oriented the part for the AM build, and that the machine has already been set up for this specific build.3 Our model then begins at the build step. We collected data on three MAM machine suppliers. Two of these are equipment suppliers of DMLS technology and one of these is EBM technology. For the build step, we worked with each supplier and the academic lab to obtain build times for the particular build orientations, batch sizes, and production parameters required for the engine bracket. The base case build time for each system is estimated by each equipment's build simulation tool.

We also collected data on seven pre and postprocessing steps for both forging and AM. Given the bracket design and the DMLS and EBM suppliers in the final analysis, only four of the postprocessing steps on which we collected data were in the end necessary for the AM analysis. The postprocessing required between EBM and DMLS systems are slightly different: EBM does not require a heat treatment step for stress relief, but DMLS does. In our process flow for the bracket design, the remaining postprocessing steps (wire electrical discharge machining (EDM), hot isostatic press (HIP), and shot peening) are the same for the three equipment platforms. Finally, given AM's nascent role in aerospace production, destructive testing must be performed to ensure quality and repeatability.

To ensure uniform comparison between forging and AM, we constructed a PBCM of a hammer forging process, which would be the most likely production method for the traditionally designed GE engine bracket (Fig. 2(a)). Our data was primarily obtained from the Forging Industry Association. The forging process includes induction heating, forging, heat treatment, grinding, multi-axis milling, and wire EDM. In contrast to MAM, testing for forging is nondestructive, as is standard for forged aerospace parts, as forging is a well-documented process with high consistency and repeatability.

Machine Dedication.

In all scenarios (best, base or worst), we classified the forging machine as nondedicated. Since production of the target annual production volume of brackets would take such a small amount of time (approximately 25 days), it is likely to be fully utilized in a production environment for other products the remainder of the year. The Forging Industry Association respondent confirmed that given how low the engine bracket volumes were and how fast the entire year's throughput would be completed, the forging machine would not sit for 11 months of the year without any other work put on it. Thus, we assume that the forged machine is producing other parts when not making the engine bracket.

In the MAM case, if the machine is not fully utilized, it cannot be used for other parts because of current Federal Aviation Administration (FAA) safety regulations. Specifically, a FAA Production Certificate certifies that the applicant has established a robust quality system and supplier control to ensure the replicability of the properties, which appear in the type certificate (TC) [37]. Once production approval is granted, the manufacturing process is “frozen” under configuration control, meaning that any change made to the process must be approved by FAA [37]. For MAM, this implies that a manufacturer with a machine certified to produce a certain part would not be allowed to produce a different part, whether FAA certified or not, without recertifying that machine for both the previous part and the new part [38]. This lack of flexibility affects the economic viability of MAM for the production of parts at low volumes, precisely where MAM might be more competitive against traditional manufacturing techniques.

Process Input Uncertainty and Ranges for Sensitivity Analysis.

For all four approaches (DMLS 1, DMLS 2, EBM, and forging), where possible, we requested ranges of best and worst possible scenarios to help capture uncertainty in the process inputs. These best, base, and worst case inputs for key cost drivers, based on our data collection, are shown in Tables 8A and 8B, which are available under the “Supplemental Materials” tab for this paper on the ASME Digital Collection. Given limited time with any singular informant, we focused on getting the most detailed information for inputs we expected to be the most impactful on cost or time [39]. In addition, we were able to engage in a variety of informal conversations with MAM producers, industry experts, and equipment suppliers not represented in the final analysis. We use these informal conversations, combined with knowledge of past production in other areas, to bind our best and worst case scenarios for each process input. For MAM, inputs for which we collected best and worst case inputs were the main AM machine price, batch size (and thus build time), Ti64 powder price, reject and scrap rates, postprocessing machine price, postprocessing cycle time, and destructive testing (Table 8A, which is available under the “Supplemental Materials” tab for this paper on the ASME Digital Collection). For forging, inputs for which we were able to collect best and worst case inputs were Ti64 price, forging scrap rate, and forging reject rate (Table 8B, which is available under the “Supplemental Materials” tab for this paper on the ASME Digital Collection).

Table 15

Sensitivity ranges for additive manufacturing processes

DMLS 1DMLS 2
ParameterWorstBaseBestWorstBaseBest
Main machine price ($K)$660$600$540$800$650$585
Batch size226444
OrientationFlatFlatVerticalFlat tiltedFlat tiltedFlat tilted
Build time19.519.538.337.337.337.3
Layer thickness60 μm60 μm
Reject12%7%3%5%4%3%
Scrap15%5%1%15%10%5%
Ti64 price$614$614$200$899$899$200
Powder diameter range5–72 μm15–45 μm
DMLS 1DMLS 2
ParameterWorstBaseBestWorstBaseBest
Main machine price ($K)$660$600$540$800$650$585
Batch size226444
OrientationFlatFlatVerticalFlat tiltedFlat tiltedFlat tilted
Build time19.519.538.337.337.337.3
Layer thickness60 μm60 μm
Reject12%7%3%5%4%3%
Scrap15%5%1%15%10%5%
Ti64 price$614$614$200$899$899$200
Powder diameter range5–72 μm15–45 μm
EBM
ParameterWorstBaseBest
Main machine price ($K)$1210$1100$990
Batch size226
OrientationFlatFlatVertical
Build time15.715.740.8
Layer thickness70 μm
Reject5%4%3%
Scrap15%10%5%
Ti64 price$400$250$100
Powder diameter range35–105 μm
EBM
ParameterWorstBaseBest
Main machine price ($K)$1210$1100$990
Batch size226
OrientationFlatFlatVertical
Build time15.715.740.8
Layer thickness70 μm
Reject5%4%3%
Scrap15%10%5%
Ti64 price$400$250$100
Powder diameter range35–105 μm
Table 16

Sensitivity ranges for forging processes

Forging sensitivity
BestBaseWorst
Ti64$50/kg$55/kg$70/kg
Forging scrap rate25%30%35%
Forging reject rate1%2%3%
Forging sensitivity
BestBaseWorst
Ti64$50/kg$55/kg$70/kg
Forging scrap rate25%30%35%
Forging reject rate1%2%3%

Decision Rules.

The decision rules, or equations, that turn the facility-wide inputs and inputs for each process step into the final output can be found in Appendix A, which is available under the “Supplemental Materials” tab for this paper on the ASME Digital Collection, along with explanations thereof. Two decision rules specific to our modeling of MAM are important to note in the main text. First, our model accounts for the increased production volume required to account for destructive testing as a separate input on top of per-process-step reject rate. The yield hit from destructive testing is accounted for in the final step. We assume that 1:8 destructive testing to ensure performance is being maintained. AM manufacturers are currently producing parts for aerospace applications with sufficient reliability to have 1:8 destructive testing, and some are currently moving to destructively testing 1 in 100 parts. We therefore believe this to be a reasonable, if not conservative, starting assumption. In contrast, we assume nondestructive testing for forging. Thus, AM must make more parts per process step to have the same number of “good parts” as forging, and this is reflected in the production costs. Additionally, it is important to note that for the AM build step, cycle time includes warm up and cool down time in addition to the actual time the machine spends building the part.

Results and Discussion

Figures 4 and 5 show the production costs of a good engine bracket for the two DMLS platforms and the EBM platform (for the MAM engine bracket design) and for the forging platform (for the traditional bracket design) at varying production volumes. The intermittent spikes in production cost represent the model needing to add an additional piece of equipment (whether build or postprocessing) to achieve a certain number of good parts per year.

Fig. 4
EBM and DMLS appear to have significant overlap in cost given uncertainty, with forging cheaper across all APV. EBM exhibits a slightly narrower range of cost given best and worst case scenarios.
Fig. 4
EBM and DMLS appear to have significant overlap in cost given uncertainty, with forging cheaper across all APV. EBM exhibits a slightly narrower range of cost given best and worst case scenarios.
Close modal
Fig. 5
DMLS systems show significant cost overlap given uncertainty of best and worst case scenarios noted in Table 8A, which is available under the “Supplemental Materials” tab for this paper on the ASME Digital Collection. Forging remains cheaper by small margin.
Fig. 5
DMLS systems show significant cost overlap given uncertainty of best and worst case scenarios noted in Table 8A, which is available under the “Supplemental Materials” tab for this paper on the ASME Digital Collection. Forging remains cheaper by small margin.
Close modal

Our results suggest that for additive-design engine bracket production, there is a significant cost overlap across the two dominant production platforms, DMLS and EBM, given uncertainties (Fig. 4). Of course, each platform has different part advantages—EBM has a faster build rate but less precision and poorer surface finish compared to DMLS. As expected, the traditional hammer forging process is the cheapest option for producing the engine bracket (Fig. 4). Importantly, the additively manufactured design offers an approximately 80% weight savings over the traditional forged design. There are also slight cost differences between different suppliers within the same MAM technology, as seen in Fig. 5.

As can be seen in Fig. 4, the forging cost curve is flatter than the AM cost curve, the latter of which rises steeply below 2000 good engine brackets per year. That the AM process has less of a cost advantage over forging at these extremely low volumes might at first seem counterintuitive. This difference is due to the forging process being nondedicated, while the AM process is dedicated: FAA regulations allow multiple different parts to be run on the forging equipment, keeping it fully utilized, while FAA regulations allow only one part to be run per machine on the additively manufactured process. This dedication is what causes the additive design to rise in cost at low volumes, with an increasing portion of the equipment charged to each part that is made, while the forged equipment does not rise in costs at lower volume, since other parts can be (and are) made on the machine without hurting part integrity when the forging machine is not making the bracket.4 This effect may be seen in Fig. 6(b), where at a volume of 1000 brackets, not only is the unit cost of the additively manufactured part significantly higher than the forged part (approximately $3200 versus $400), but also the proportion of cost made up of equipment is significantly higher than what was observed at high volumes, as seen in Fig. 6(a).

Fig. 6
(a) Cross section of base case cost at APV of 10,000 brackets indicates that material and machine price both have strong impact on EBM; material the primary driver of DMLS cost. (b) Unit cost breakdowns at low volumes (1000 APV) show an increase in the proportion of cost driven by equipment price for the AM manufactured bracket, a result of the nondedication in the AM manufacturing process.
Fig. 6
(a) Cross section of base case cost at APV of 10,000 brackets indicates that material and machine price both have strong impact on EBM; material the primary driver of DMLS cost. (b) Unit cost breakdowns at low volumes (1000 APV) show an increase in the proportion of cost driven by equipment price for the AM manufactured bracket, a result of the nondedication in the AM manufacturing process.
Close modal

An integral part of moving AM toward cost parity with traditional manufacturing is discovering and understanding major cost drivers. Given their respective build rates, reject rates, scrap rates, material prices, and machine prices, DMLS and EBM have a different set of cost drivers per good part. Main machine cost and material cost are the major cost drivers for the DMLS system, whereas main machine cost is the overwhelming driver of the EBM system (Fig. 6(a)).

As can be seen in Table 6A, which is available under the “Supplemental Materials” tab for this paper on the ASME Digital Collection. the DMLS systems require finer powder particles than the EBM system, and have powder prices two to three times that of EBM. One of the two DMLS systems does have lower material scrap rates, but this does not outweigh the higher material price in the base case comparison (e.g., DMLS still has higher material costs than EBM). Currently, the equipment system suppliers sell the powder and their equipment warranty is only valid if their powder is used [40]. Interestingly, if—as represented by the best case scenario—the necessary quality powders can be sourced more cheaply, as is being claimed by material vendors outside the AM equipment system suppliers, then the contribution of material to overall cost of the DMLS parts would drop considerably. In contrast, despite having faster base case build rates and slightly better base case yields than DMLS, the EBM's machine price is nearly twice that of DMLS (Table 6A, which is available under the “Supplemental Materials” tab for this paper on the ASME Digital Collection). Overall, the faster build and slightly better yields do not outweigh this higher price in the comparison (e.g., EBM still has higher main machine costs than DMLS), assuming that equivalent parts can be produced by both the DMLS and EBM systems. Overall, the EBM base case is, at 10,000 brackets per year, cheaper than the DMLS systems; however, given the range of input uncertainties, no conclusive distinction should be made.

Top Cost Drivers.

To further assess the sensitivity of unit production costs to process inputs, we examined which individual inputs (given their expected best and worst case scenarios) had the largest impact on cost (Fig. 7). Here, we found that the Ti64 powder price, given uncertainties, has the most significant impact on production costs, along with batch size. Further work will be necessary to better understand the trade-offs between powder size and source (powders offered by machine suppliers versus those offered directly by the powder producers), in addition to the effect of powder size on production yields and final part properties and thus performance. Likewise, batch size for this part is tied to build orientation; to increase the batch size, one must stand the parts up vertically. However, the effect of varied build orientation on material properties is still an ongoing research topic.

Fig. 7
Sensitivity analysis of individual cost drivers on base case scenario at 10,000 APV indicates that batch size, build time and orientation (all inextricably linked) significantly impact cost for both technologies
Fig. 7
Sensitivity analysis of individual cost drivers on base case scenario at 10,000 APV indicates that batch size, build time and orientation (all inextricably linked) significantly impact cost for both technologies
Close modal

Cost Impact of Destructive Testing.

Another possible area of cost reduction is that of testing. Currently, due to challenges presented by part geometries, cost, and porosity for other testing mechanisms, destructive testing is necessary to characterize the mechanical properties of AM parts. For example, in the case of GE's fuel nozzle, initially one in every eight parts was lost to destructive testing. To better understand the cost-consequences of this type of destructive testing, and the opportunities to reduce cost by reducing destructive testing (through, for example, improved understanding of the relationship between process decisions and material characteristics), we incorporated into our model these additional losses of good parts due to destructive testing. Our analysis shows that reducing the number of destructive tests from 1:8 to 1:100 could reduce costs of our DMLS best case by approximately $150 per bracket at the annual production volume of 10,000 brackets per year, after which there were diminishing returns (Fig. 8). If this reduction in destructive tests can be combined with increasing the batch size (and thus changing the build orientation), costs per usable part can be driven down even further by approximately $260. This leads to a total cost reduction of approximately $410 by reducing destructive testing and building vertically.

Fig. 8
Given uncertainties, destructive testing shows some possibility of additional cost reduction (approximately $150 at APV for DMLS 1). Building parts vertically provides an additional ∼$260 of savings, through vertical build may not offer optimal mechanical properties.
Fig. 8
Given uncertainties, destructive testing shows some possibility of additional cost reduction (approximately $150 at APV for DMLS 1). Building parts vertically provides an additional ∼$260 of savings, through vertical build may not offer optimal mechanical properties.
Close modal

Cost Impact of Part Orientation.

Being able to produce a part of equivalent functional performance with a vertical build (thus enabling larger batch sizes) provides arguably the greatest opportunity for cost savings (Fig. 9). EBM shows significant cost savings with a vertical build, even given uncertainty. DMLS shows the possibility for cost savings, though there is some overlap in the cost of vertically built versus horizontally built brackets given the uncertainty. Given these potential cost savings, it is worthwhile to work toward understanding and mitigating microstructural anomalies associated with a vertical build. Many studies have discussed the effects of part orientation and location on the build plate on the mechanical properties of the AM parts. For instance, previous studies by Simonelli et al. [41] and Hrabe et al. [42] have shown that the effect of build orientation on tensile properties is significant in both selective laser and electron beam melting of Ti64. Simonelli et al. [41] have reported that vertical builds have 30% lower elongation when compared to horizontal builds. Similarly Hrabe et al. [42] detail the effect of build orientation on ductility for Ti64 parts built using DMLS processes and identify edge build as the direction for highest elongation at fracture. Both future research and technological advancements in MAM (such as increased speed, reliability, quality, and expanded range of materials) will deepen understanding of the limits of build orientation and thus batch size.

Fig. 9
Over 10 yr, AM bracket may yield anywhere between $400 and $3000 in cost savings due to weight reduction achieved by the additive design based on best and worst fuel prices over last 15 yr
Fig. 9
Over 10 yr, AM bracket may yield anywhere between $400 and $3000 in cost savings due to weight reduction achieved by the additive design based on best and worst fuel prices over last 15 yr
Close modal

Lifetime Cost Savings Due to Weight Reduction.

Finally, as noted earlier, the additive design in our research boasts an approximately 80% weight reduction over the conventional design. This lighter design provides significant savings to the part end user. Our analysis estimates that the cost of additional fuel required by the forged bracket (over the additively manufactured one) would be approximately $1300 over 10 yr in the base case, with additional fuel costs as high as $3000 possible given the probable future fuel price increases (Fig. 10). While the AM manufacturers may not realize these savings, airlines may be willing to pay a premium for lightweight AM parts up front to reduce aircraft weight [43]. An investigation of these kinds of benefits, combined with other areas for cost reduction, such as further equipment and process standardization, will be important areas for ongoing research in understanding how the design benefits of AM can be brought to market to be cost competitive with traditional manufacturing methods.

Fig. 10
Building parts vertically offers significant cost savings, but vertical build orientation may negatively impact mechanical properties
Fig. 10
Building parts vertically offers significant cost savings, but vertical build orientation may negatively impact mechanical properties
Close modal

Future Work

Going forward, given the cost competitiveness of MAM versus forging for such a simple part and the opportunities to further reduce the cost of MAM through reduced material pricing or shifted build orientation, particularly interesting future work would include building out the relationships between design geometry, process step requirements (including build rate and postprocessing requirements), and material properties (including mechanical properties), so as to be able to better understand these cost-benefit trade-offs with this simple example and also with a wider range of parts and geometries. For example, the latest EBM machine model, Q20, has room in the chamber to build 48 engine brackets if brackets are stacked on top of each other; however, it is unclear if the material microstructure of these engine brackets would be such that they would all be of sufficient quality.

Today, identical components built via MAM can vary in mechanical properties both within a single build and across multiple builds [44]. Also, particular energy scan patterns, build orientations, and powder qualities may result in sup-optimal final part properties [44]. It would be interesting to conduct techno-economic modeling analyses of strategies for addressing these challenges, including making real-time changes in the additive process itself (adjusting build rate, layer thickness, and beam overlap midprocess), and adding additional postprocessing steps on a part-by-part basis after real-time evaluation.

Finally, our model currently only accounts for the part loss associated with destructive testing methods, and not the time or capital equipment associated with the testing process itself. As such, it offers a conservative estimate of the benefits of reducing destructive testing, but a nonconservative estimate of the cost of having to do more destructive testing in MAM. Future work should model the costs versus potential added value of a range of testing interventions from destructive to nondestructive testing (with different impacts on end-part reliability).

Conclusions

Given the conservative nature of our assumptions as well as our choice of part, these results suggest that there may be broader economic viability in additively manufactured parts for commercial aviation, especially when systemic factors and use costs are incorporated. Indeed, we find that even in a simple engine bracket design without part consolidation, the cost per good bracket can be cheaper than forging once lifetime weight savings are taken into account, when using relatively conservative assumptions with respect to processing capability. Interestingly, the additively manufactured parts are particularly competitive against forging at higher volumes of 2000–12,000 brackets per year. The MAM systems we compared had similar unit costs given uncertainties despite significant difference between the processing methods of DMLS and EBM. High-impact opportunities to further reduce the cost of MAM versus forging include reducing material price without foregoing reliability and part quality, and increasing the number of parts that can fit per chamber (through vertical builds) without compromising quality or reliability.

Acknowledgment

Our utmost thanks to the 14 anonymous companies that provided the input data used in this analysis. Thanks also to Parth Vaishnav for his input on the fuel savings analysis, as well as Kathryn J. Jackson, Anthony D. Rollett, and C. Freg Higgs III for insights throughout the process. Funding for this project was provided by the Defense Advanced Research Projects Agency, America Makes, National Science Foundation's Science of Science and Innovation Policy program, and the Portuguese Science and Technology Fund.

Nomenclature

N =

number of periods (yr)

NPV =

net present value

pfuel =

jet fuel prices ($/gal)

r =

discount rate

S =

average annual fuel savings per bracket

2

There are two main approaches to TCM. Variant modeling methods estimate cost based on similarities between current and past products or processes [16]. Generative methods base cost projections on the details of production requirements and operational conditions [17,18]. For analyzing the economics of new technologies that vary significantly from existing products or processes, we find generative methods to be the most appropriate approach.

3

Because currently the FAA regulation requires “one machine one part,” we model dedicated production of one design. While not necessary for this model, in a scenario where firms are changing the design or material frequently, our data collection suggests that machine setup times can range between half an hour and 5 h (if the machine requires a material change).

4

We did not include a scenario in which forging is dedicated in this analysis, since these processes are outsourced, and in our conversations the forging industry did not express concern about full utilization of their equipment. That said, we recognize that, for example, in a military context in the field, AM and forging would not be on equal footing, since the military may wish to produce a repair part on-site, and would not have time or ability to send out for a new one from a forging house.

References

1.
Harris
,
I. D.
,
2011
, “
Development and Implementation of Metals Additive Manufacturing
,” EWI, Columbus, OH, accessed June 30, 2016, https://ewi.org/eto/wp-content/uploads/2013/06/Additive-Manufacturing-DOT-Paper-2011.pdf
2.
National Science and Technology Council Interagency Working Group on Advanced Manufacturing
,
2012
, “
A National Strategic Plan for Advanced Manufacturing
,” Office of Science and Technology Policy, Washington, DC.
3.
Wohlers
,
T.
,
2011
,
Wohlers Report 2011: Additive Manufacturing and 3D Printing State of the Industry Annual Worldwide Progress Report
,
Wohlers Associates
,
Fort Collins, CO
.
4.
Raghavan
,
K. S.
,
2014
, “
A New Process for Design of Hollow Turbine Blades Suited for Additive Manufacturing Technology
,” Cyient, East Hartford, CT, accessed Aug. 2, 2015, http://www.cyient.com/downloads/execute/file/white-paper-a-new-process-for-design-of-hollow-turbine-blades-suited-for-additive-manufacturing-tec
5.
Collier
,
C. A.
, and
Ledbetter
,
W. B.
,
1982
,
Engineering Cost Analysis
,
Harper & Row Limited
,
New York
.
6.
Ostwald
,
P. F.
,
1991
,
Engineering Cost Estimating
, 3rd ed.,
Prentice Hall
,
Upper Saddle River, NJ
.
7.
Ostwald
,
P.
, and
McLaren
,
T.
,
2004
,
Cost Analysis and Estimating for Engineering and Management
,
Prentice Hall—Pearson
,
Upper Saddle River, NJ
.
8.
Boothroyd
,
G.
,
Dewhurst
,
P.
, and
Knight
,
W.
,
2010
,
Product Design for Manufacture and Assembly
, 3rd ed.,
Marcel Dekker
,
New York
.
9.
Layer
,
A.
,
Ten Brinke
,
E.
,
Van Houten
,
F.
,
Kals
,
H.
, and
Haasis
,
S.
,
2002
, “
Recent and Future Trends in Cost Estimation
,”
Int. J. Comput. Integr. Manuf.
,
15
(
6
), pp.
499
510
.
10.
Asiedu
,
Y.
,
Besant
,
R. W.
, and
Gu
,
P.
,
2000
, “
Simulation-Based Cost Estimation Under Economic Uncertainty Using Kernel Estimators
,”
Int. J. Prod. Res.
,
38
(
9
), pp.
2021
2035
.
11.
Kirchain
,
R.
, and
Field
,
F.
,
2000
, “
Process-Based Cost Modeling: Understanding the Economics of Technical Decisions
,”
Encycl. Mater. Sci. Eng.
,
2
, pp.
1718
1727
.
12.
Thomke
,
S.
,
2003
,
Experimentation Matters: Unlocking the Potential of New Technologies for Innovation
,
Harvard Business School Press
,
Boston, MA
.
13.
Dasbach
,
J. M.
, and
Apgar
,
H.
,
1988
, “
Design Analysis Through Techniques of Parametric Cost Estimation
,”
Eng. Costs Prod. Econ.
,
14
(
2
), pp.
87
93
.
14.
Asiedu
,
Y.
, and
Gu
,
P.
,
1998
, “
Product Life Cycle Cost Analysis: State of the Art Review
,”
Int. J. Prod. Res.
,
36
(
4
), pp.
883
908
.
15.
Weustink
,
I. F.
,
ten Brinke
,
E.
,
Streppel
,
A. H.
, and
Kal
,
H. J. J.
,
2000
, “
A Generic Framework for Cost Estimation and Cost Control in Product Design
,”
J. Mater. Process. Technol.
,
103
(
1
), pp.
141
148
.
16.
Field
,
F.
,
Kirchain
,
R.
, and
Roth
,
R.
,
2007
, “
Process Cost Modeling: Strategic Engineering and Economic Evaluation of Materials Technologies
,”
JOM
,
59
(
10
), pp.
21
32
.
17.
Ong
,
N. S.
,
1995
, “
Manufacturing Cost Estimation for PCB Assembly: An Activity-Based Approach
,”
Int. J. Prod. Econ.
,
38
(
2–3
), pp.
159
172
.
18.
LaTrobe-Bateman
,
J.
, and
Wild
,
D.
,
2003
, “
Design for Manufacturing: Use of Spreadsheet Model of Manufacturability to Optimize Product Design and Development
,”
Res. Eng. Des.
,
14
(
2
), pp.
107
117
.
19.
Busch
,
J. V.
, and
Field
,
F. R.
,
1988
, “
Technical Cost Modeling
,”
The Blow Molding Handbook
,
D.
Rosato
and
D.
Rosato
, eds.,
Hanser Publishers
,
Cincinnati, OH
.
20.
Fuchs
,
E.
,
Field
,
F.
,
Roth
,
R.
, and
Kirchain
,
R.
,
2011
, “
Plastic Cars in China? The Significance of Production Location Over Markets for Technology Competitiveness in the United States Versus the People's Republic of China
,”
Int. J. Prod. Econ.
,
132
(
1
), pp.
79
92
.
21.
Fuchs
,
E.
,
Field
,
F.
,
Roth
,
R.
, and
Kirchain
,
R.
,
2008
, “
Strategic Materials Selection in the Automotive Body: Economic Opportunities for Polymer Composite Design
,”
Compos. Sci. Technol.
,
68
(
9
), pp.
1989
2002
.
22.
Fuchs
,
E.
, and
Kirchain
,
R. E.
,
2010
, “
Design for Location: The Impact of Manufacturing Offshore on Technology Competitiveness
,”
Manage. Sci.
,
56
(
12
), pp.
2323
2349
.
23.
Marallo
,
S. L.
, and
Dieffenbach
,
J. R.
,
1994
, “
Manufacturing Cost Analysis for Electronic Packaging
,”
International Workshop on the Economics of Design, Test, and Manufacturing for Electronic Circuits and Systems
, Austin, TX, May 16–17, pp.
90
94
.
24.
Fuchs
,
E.
,
Bruce
,
E.
,
Ram
,
R.
, and
Kirchain
,
R.
,
2006
, “
Process-Based Cost Modeling of Photonics Manufacture: The Cost Competitiveness of Monolithic Integration of a 1550-nm DFB Laser and an Electroabsorptive Modulator on an InP Platform
,”
J. Lightwave Technol.
,
24
(
8
), pp.
3175
3186
.
25.
Fuchs
,
E.
,
Kirchain
,
R.
, and
Liu
,
S.
,
2011
, “
The Future of Silicon Photonics—Not So Fast?: The Case of 100G Ethernet LAN Transceivers
,”
J. Lightwave Technol.
,
29
(
15
), pp.
2319
2326
.
26.
Field
,
F.
, and
Ng
,
L.
,
1989
, “
Materials for Printed Circuit Boards: Past Usage and Future Prospects
,”
Mater. Soc.
,
13
(
3
), p.
17
.
27.
Field
,
F.
, and
Ng
,
L.
,
1989
, “
Technical Cost Modeling for Printed Circuit Board Fabrication
,”
Print. Circuit Fabr.
,
12
(
2
).
28.
Sikorski
,
S.
,
Krueger
,
R.
, and
Field
,
F.
,
1989
, “
A Systems Approach to the Evaluation of Packaging Design Alternatives
,”
Int. J. Hybrid Microelectron.
,
12
(
2
), pp.
102
110
.
29.
Sandborn
,
P. A.
,
1998
, “
Analyzing Packaging Trade-Offs During System Design
,”
IEEE Des. Test Comput.
,
15
(
3
), pp.
10
19
.
30.
Index Mundi
,
2016
, “
Jet Fuel Daily Price
,” U.S. Energy Information Administration, Washington, DC, accessed July 31, 2015, http://www.indexmundi.com/commodities/?commodity=jet-fuel&months=180
31.
Boeing
,
2016
, “
Airplane Characteristics for Airport Planning
,” Airport Compatibility, Boeing, Inc., Seal Beach, CA, accessed June 30, 2016, http://www.boeing.com/commercial/airports/plan_manuals.page
32.
Anderson
,
D.
,
2006
, “
Fuel Conservation: Operational Procedures for Environmental Performance
,” Boeing Commercial Airplanes, Seattle, WA, accessed June 30, 2016, http://www.icao.int/meetings/environmentalworkshops/documents/icao-transportcanada-2006/anderson_ops.pdf
33.
General Electric, GrabCAD
,
2013
, “
GE Engine Bracket Challenge
,” GrabCAD, General Electric, Cambridge, MA, accessed June 30, 2016, https://grabcad.com/challenges/ge-jet-engine-bracket-challenge
34.
United States Securities and Exchange Commission
,
2015
, “
General Electric Form 10-K
,” U.S. Securities and Exchange Commission, Washington, DC, accessed June 30, 2016, https://www.sec.gov/Archives/edgar/data/40545/000004054516000145/ge10k2015.htm
35.
Vrancken
,
B.
,
Thijs
,
L.
,
Kruth
,
J. P.
, and
Van Humbeeck
,
J.
,
2012
, “
Heat Treatment of Ti6Al4V Produced by Selective Laser Melting: Microstructure and Mechanical Properties
,”
J. Alloys Compd.
,
541
, pp.
177
185
.
36.
Cammett
,
J. T.
,
Prevey
,
P. S.
, and
Jayaraman
,
N.
,
2005
, “
The Effect of Shot Peening Coverage on Residual Stress, Cold Work, and Fatigue in a Nickel-Base Superalloy
,”
ICSP-9, Paris
,
France
.
37.
U.S. Code (Federal Aviation Administration), “
Certification Procedures for Products and Parts: Changes in Quality System
,” 14 C.F.R. Sec. 21.150.
38.
Roca
,
J. B.
,
Fuchs
,
E.
,
Vaishnav
,
P.
,
Morgan
,
M. G.
, and
Mendonça
,
J.
,
2016
,
When Risks Cannot Be Seen: Regulating Uncertainty in Emerging Technologies
,
Carnegie Mellon University
,
Pittsburgh, PA
.
39.
Fuchs
,
E.
,
2016
, “
Process-Based Cost Modeling: Interviewing for Inputs (Course 19-670/24-680 Quantitative Entrepreneurship: Paths to New Technology Commercialization)
,” Carnegie Mellon University, Pittsburgh, PA, Class Handout.
40.
Moylan
,
S.
,
Slotwinski
,
J.
,
Cooke
,
A.
,
Jurrens
,
K.
, and
Donmez
,
M. A.
,
2013
, “
NIST Technical Note 1801: Lessons Learned in Establishing the NIST Metal Additive Manufacturing Laboratory
,” NIST,
U.S. Department of Commerce
, Gaithersburg, MD.
41.
Simonelli
,
M.
,
Tse
,
Y. Y.
, and
Tuck
,
C.
,
2014
, “
Effect of the Build Orientation on the Mechanical Properties and Fracture Modes of SLM Ti–6Al–4V
,”
Mater. Sci. Eng.: A
,
616
, pp.
1
11
.
42.
Hrabe
,
N.
,
Kircher
,
R.
, and
Quinn
,
T.
,
2012
, “
Effects of Processing on Microstructure and Mechanical Properties of Ti-6Al-4V Fabricated Using Electron Beam Melting (EBM): Orientation and Location
,”
23rd Solid Freeform Fabrication Symposium
, Austin, TX, pp.
1045
1058
.
43.
United States Government Accountability Office
,
2015
, “
3D Printing: Opportunities, Challenges, and Policy Implications of Additive Manufacturing
,”
Report No. GAO-15-505SP
.
44.
Gibson
,
I.
,
Rosen
,
D.
, and
Stucker
,
B.
,
2014
,
Additive Manufacturing Technologies: 3D Printing, Rapid Prototyping, and Direct Digital Manufacturing
, 2nd ed.,
Springer
,
New York
.

Supplementary data