User demands for higher performance from today’s clamshell unloaders have led to a critical examination of the operator himself. In order to reduce dependency on this unpredictable individual, it becomes desirable to automate the unloading cycle as much as possible to achieve maximum efficiency. This paper discusses some of the computer simulation which has been done to determine an automated cycle, and the electrical controls involved in implementing the automation.

This content is only available via PDF.
You do not currently have access to this content.