Abstract

The Iowa formula was published by Professor M. G. Spangler of Iowa State Univ. in 1941 to predict the deflection of buried flexible pipe. In the equation, he used the term “deflection lag” to describe the increase in flexible pipe defection after the maximum load was reached over the pipe. Unfortunately, the term is currently improperly used in ASTM, AWWA, and ASCE manuals and standards to reflect the increase in deflection starting the day the backfill is completed over the pipe, rather than when the maximum load occurs. The maximum load on a pipe is generally not attained until after 3–12 months after construction. The history of the deflection lag term and the use of the term “load lag” by Professor Spangler are explored. For the increase in pipe deflection following construction completion, the use of the term “time lag” should be used. A table of time lag values for use in estimating deflection is presented. The table is based on empirical data from field measurements.

References

1.
Spangler
,
M. G.
, “
The Structural Design of Flexible Pipe Culverts
,” Bulletin No. 153, lowa State Engineering Experiment Station, Ames, Iowa State,
1941
2.
Spangler
,
M. G.
, “
Discussion of the Paper by Scheer, A. C., and Willett, G. A., ‘Rebuilt Wolf Creek Culvert Behavior’
,” Highway Research Record No 262, Washington, D.C.,
1969
.
3.
Howard
,
A.
, “
The USBR Equation for Predicting Flexible Pipe Deflection
,”
Proceedings of the International Conference on Underground Plastic Pipe
, New Orleans, LA,
ASCE
,
Reston, VA
,
1981
.
4.
Howard
,
A.
, “
The Reclamation E′ Table, 25 Years Later
,”
Proceedings, Plastics Pipe XIII International Conference
,
Plastics Pipe Institute
,
Inc, Washington, D.C.
,
2006
.
5.
Howard
,
A.
,
Time Lag Factors for Buried Flexible Pipe
,
Relativity Publishing
,
Lakewood, CO
,
2011
.
6.
Howard
,
A.
,
Pipeline Installation
,
Relativity Publishing
,
Lakewood, CO
,
1996
.
7.
Howard
,
A.
, “
Modulus of Soil Reaction Values for Buried Flexible Pipe
,”
J. Geotech. Eng.
, Vol.
103
, No.
GT1
,
1977
, pp.
33
43
.
8.
Howard
,
A.
, “
Load Deflection Field Test of 27-inch PVC Pipe
,” Buried Plastic Pipe Technology, ASTM STP 1093, American Society for Testing and Materials, West Conshohocken, PA,
1990
, pp.
33
43
.
9.
Howard
,
A.
,
Spridzans
,
Y.
, and
Schrock
,
B. J.
, “
Latvia Field Test of 915 mm Fiberglass Pipe
,”
ASTM STP 1222
,
American Society for Testing and Materials
,
West Conshohocken, PA
,
1994
.
10.
Howard
,
A.
, “
Time-Deflection Field Test of 120-cm Steel, Fiberglass, and Pretensioned Concrete Pipe
,”
Proceedings of ASCE Conference Advances in Underground Pipeline Engineering: 2nd International Conference
, Seattle, WA,
ASCE
,
Reston, VA
,
1995
.
11.
Howard
,
A.
, and
Howard
,
B. C.
, “
A Discussion of E′ versus Depth
,”
ASCE Conference Proceeding, Pipelines 2008
, Atlanta, GA,
ASCE
,
Reston, VA
,
2008
.
12.
Watkins
,
R. K.
, and
Spangler
,
M. G.
, “
Some Characteristics of the Modulus of Passive Resistance of Soil: A Study in Similitude
,”
Proceedings Highway Research Board
,
National Research Council
,
Washington DC
,
1958
.
This content is only available via PDF.
You do not currently have access to this content.