Abstract

A laboratory apparatus has been developed for assessing the hydraulic conditions necessary for the initiation of piping erosion. The apparatus is designed to provide a constant hydraulic gradient throughout a sample while retaining the sample in a sample holder. Increasing differential head is applied across the sampler while observations of soil behavior and measurements of pore pressure throughout the sampler are made. Observations of soil behavior during the tests have identified four stages of the initiation of piping: 1) first visible movement, 2) heave progression, 3) boil formation, and 4) total heave. Tests were performed on sandy soils representing a variety of grain size, grain shape, gradation, and specific gravity. The effects these soil properties have on the critical hydraulic conditions needed to initiate piping erosion were evaluated based on observations and test results.

References

1.
ASTM C778-03
: “Standard Specification for Standard Sand,”
Annual Book of ASTM Standards
,
ASTM International
,
West Conshohocken, PA
,
2003
.
2.
Davis
,
J.
,
2010
, “
Herbert Hoover Dike
,”
United States Society on Dams Levee Workshop
, Memphis, TN, Nov 2–4,
United States Society on Dams (USSD)
,
Denver, CO
.
3.
de Wit
,
G. N.
,
Sellmeijer
,
J. B.
, and
Penning
,
A.
,
1981
, “
Laboratory Tests on Piping
,”
Proceedings of the 10th International Conference on Soil Mechanics and Foundation Engineering
,
Balkema, Rotterdam, The Netherlands
, pp.
517
520
.
4.
Foster
,
M.
,
Fell
,
R.
, and
Spannagel
,
M.
,
2000
, “
Statistics of Embankment Dam Failures and Accidents
,”
Can. Geotech. J.
, Vol.
37
(
5
), pp.
1000
1024
. https://doi.org/10.1139/t00-030
5.
Khilar
,
K. C.
,
Folger
,
H. S.
, and
Gray
,
D. H.
,
1985
, “
Model for Piping Plugging in Earthen Structures
,”
J. Geotech. Eng.
, Vol.
111
(
7
), pp.
833
846
. https://doi.org/10.1061/(ASCE)0733-9410(1985)111:7(833)
6.
Koenders
,
M. A.
and
Sellmeijer
,
J. B.
,
1992
, “
Mathematical Model for Piping
,”
J. Geotech. Eng.
, Vol.
118
(
6
), pp.
943
946
. https://doi.org/10.1061/(ASCE)0733-9410(1992)118:6(943)
7.
Lane
,
E. W.
,
1934
, “
Security from Underseepage Masonry Dams on Earth Foundations
,”
Trans. ASCE
, Vol.
60
(
4
), pp.
929
966
.
8.
Ojha
,
C. S. P.
,
Singh
,
V. P.
, and
Adrian
,
D. D.
,
2001
, “
Influence of Porosity on Piping Models of Levee Failure
,”
J. Geotech. Geoenviron. Eng.
, Vol.
127
(
12
), pp.
1071
1074
. https://doi.org/10.1061/(ASCE)1090-0241(2001)127:12(1071)
9.
Ojha
,
C. S. P.
,
Singh
,
V. P.
, and
Adrian
,
D. D.
,
2004
, “
Determination of Critical Head in Soil Piping
,”
J. Geotech. Geoenviron. Eng.
, Vol.
127
(
12
), pp.
1071
1074
. https://doi.org/10.1061/(ASCE)1090-0241(2001)127:12(1071)
10.
Olorunsola
,
O.
,
2010
, “
Laboratory Approach to Modeling the Initiation Mechanism in the Piping Failure of Sandy Soils
,” M.S. research report,
Utah State University
, Logan, UT.
11.
Richards
,
K. S.
and
Reddy
,
K. R.
,
2007
, “
Critical Appraisal of Piping Phenomena in Earth Dams
,”
Bull. Eng. Geol. Environ.
, Vol.
66
(
4
), pp.
381
402
. https://doi.org/10.1007/s10064-007-0095-0
12.
Richards
,
K. S.
and
Reddy
,
K. R.
,
2010
, “
True Triaxial Piping Test Apparatus for Evaluation of Piping Potential in Earth Structures
,”
Geotech. Test. J.
, Vol.
33
(
1
), pp.
83
95
.
13.
Richards
,
K. S.
and
Reddy
,
K. R.
,
2012
, “
Experimental Investigation of Initiation of Backward Erosion Piping in Soils
,”
Geotechnique
, Vol.
62
(
10
), pp.
933
942
. https://doi.org/10.1680/geot.11.P.058
14.
Schmertmann
,
J. H.
,
2000
, “
The Non-Filter Factor of Safety against Piping through Sand
,”
Geotechnical Special Publication No. 111: Judgment and Innovation
,
Silva
F.
and
Kavazanjian
E.
, Eds.,
ASCE
,
Reston, VA
, pp.
65
132
.
15.
Sellmeijer
,
J. B.
and
Koenders
,
M. A.
,
1991
, “
A Mathematical Model for Piping
,”
Appl. Math. Model.
, Vol.
115
, pp.
646
661
. https://doi.org/10.1016/S0307-904X(09)81011-1
16.
Skempton
,
A. W.
and
Brogan
,
J. M.
,
1994
, “
Experiments on Piping in Sandy Gravels
,”
Geotechnique
, Vol.
44
(
3
), pp.
449
460
. https://doi.org/10.1680/geot.1994.44.3.449
17.
Technical Advisory Committee
,
1999
,
Technical Report on Sand Boils (Piping)
,
Technical Advisory Committee on Flood Defences, The Netherlands Road and Hydraulic Engineering Institute
,
Delft, The Netherlands
.
18.
Terzaghi
,
K.
,
1922
, “
Der Grundbruch an Stauwerken und Seine Verhutung [The Failure of Dams and Its Prevention]
,”
Die Wasserkraft
, Vol.
17
, pp.
445
449
.
19.
Terzaghi
,
K.
,
1943
,
Theoretical Soil Mechanics
,
Wiley
,
New York
.
20.
Terzaghi
,
K.
and
Peck
,
R. B.
,
1948
,
Theoretical Soil Mechanics in Engineering Practice
,
Wiley
,
New York
.
21.
Tomlinson
,
S. S.
and
Vaid
,
Y. P.
,
2000
, “
Seepage Forces and Confining Pressure Effects on Piping Erosion
,”
Can. Geotech. J.
, Vol.
37
, pp.
1
13
. https://doi.org/10.1139/t99-116
22.
USACE
,
2000
,
Engineering Manual No. 1110-2-1913—Design and Construction of Levees
,
U.S. Army Corps of Engineers
,
Washington, D. C
.
23.
USACE
,
2005
,
Technical Letter No. 1110-2-569—Design Guidance for Levee Underseepage
,
U.S. Army Corps of Engineers
,
Washington, D. C
.
24.
Vroman
,
N.
,
2010
, “
The History of Levee Seepage Design Criteria
,”
United States Society on Dams Levee Workshop
, Memphis, TN, Nov 2–4,
United States Society on Dams (USSD)
,
Denver, CO
.
25.
Weijers
,
J. B. A.
and
Sellmeijer
,
J. B.
,
1993
, “
A New Model to Deal With the Piping Mechanism on Filters, in Geotechnical and Hydraulic Engineering
,”
Filters in Geotechnical and Hydrauilc Engineering
,
Brauns
J.
,
Herbaum
M.
, and
Schuler
U.
, Eds.,
Balkema
,
Rotterdam, The Netherlands
, pp.
349
355
.
26.
Zheng
,
H.
,
Dai
,
H. C.
, and
Liu
,
D. F.
,
2007
, “
A Variational Inequality Formulation for Unconfined Seepage Problems in Porous Media
,”
Appl. Math. Model.
, Vol.
33
, pp.
437
450
. https://doi.org/10.1016/j.apm.2007.11.012
27.
Zhou
,
J.
,
Yao
,
Z.
, and
Zhang
,
G.
,
2007
, “
Meso-laboratory Study on Initiation and Evolution of Piping
,”
Chinese Journal of Underground Space and Engineering
, Vol.
3
(
10
), pp.
842
848
.
28.
Zhou
,
J.
and
Zhou
,
K.
,
2010
, “
3D Modeling of Piping Mechanism Using Distinct Element Method
,”
Proceedings of GeoShanghai 2010: Soil Behavior and Geo-Micromechanics (ASCE GSP 178)
, Shanghai, China, June 3–5,
ASCE
,
Reston, VA
, pp.
227
233
.
This content is only available via PDF.
You do not currently have access to this content.