Supercritical CO2 power cycles incorporate a unique combination of high fluid pressure, temperature, and density as well as limited component availability (e.g., high-temperature trip valves) that can result in operational challenges, particularly during off-design and transient operation. These conditions and various failure scenarios must be considered and addressed during the facility, component, and control system design phase in order to ensure machinery health and safety during operation. This paper discusses significant findings and resulting design/control requirements from a detailed failure modes and effects analysis (FMEA) that was performed for the 1 MWe-scale supercritical CO2 test loop at Southwest Research Institute, providing insight into design and control requirements for future test facilities and applications. The test loop incorporates a centrifugal pump, axial turboexpander, gas-fired primary heat exchanger, and microchannel recuperator for testing in a simple recuperated cycle configuration at pressures and temperatures up to 255 bar and 715 °C, respectively. The analysis considered off-design operation as well as high-impact failures of turbomachinery and loop components that may require fast shutdowns and blowdowns. The balance between fast shutdowns/blowdowns and the need to manage thermal stresses in the turbomachinery resulted in staged shutdown sequences and impacted the design/control strategies for major loop components and ancillary systems including the fill, vent, and seal supply systems.

References

References
1.
Brun
,
K.
,
Friedman
,
P.
, and
Dennis
,
R.
,
2017
,
Fundamentals and Applications of Supercritical Carbon Dioxide (sCO2) Based Power Cycles
,
Woodhead Publishing
, Cambridge, MA.
2.
Clementoni
,
E. M.
, and
Cox
,
T. L.
,
2014
, “
Practical Aspects of Supercritical Carbon Dioxide Brayton System Testing
,”
Fourth International Symposium—Supercritical CO2 Power Cycles
, Pittsburgh, PA, Sept. 9–10.
3.
Fleming
,
D. D.
,
Pasch
,
J. J.
,
Conboy
,
T. M.
,
Carlson
,
M. D.
, and
Kruizenga
,
A. M.
,
2014
, “
Corrosion and Erosion Behavior in Supercritical CO2 Power Cycles
,” Sandia National Laboratories, Albuquerque, NM, Report No. SAND2014-0602C.
4.
Clementoni
,
E. M.
,
Cox
,
T. L.
, and
King
,
M. A.
,
2015
, “
Off-Nominal Component Performance in a Supercritical Carbon Dioxide Brayton Cycle
,”
ASME
Paper No. GT2015-42501.
5.
Pasch
,
J.
,
Conboy
,
T.
,
Fleming
,
D.
, and
Rochau
,
G.
,
2012
, “
Supercritical CO2 Recompression Brayton Cycle: Completed Assembly Description
,” Sandia National Laboratories, Albuquerque, NM, Report No.
SAND2012-9546
.https://prod.sandia.gov/techlib-noauth/access-control.cgi/2012/129546.pdf
6.
Moore
,
J.
,
Brun
,
K.
,
Evans
,
N.
, and
Kalra
,
C.
,
2015
, “
Development of 1 MWe Supercritical CO2 Test Loop
,”
ASME
Paper No. GT2015-43771.
7.
SWRI
,
2017
, “
SwRI Teaming With GTI to Demonstrate Supercritical CO2 Power Plant
,” Southwest Research Institute, San Antonio, TX, Press Release, accessed Nov. 13, 2018, http://www.swri.org/press-release/swri-teaming-gti-demonstrate-supercritical-co2-power-plant
8.
Kalra
,
C.
,
Hofer
,
D.
,
Sevincer
,
E.
,
Moore
,
J.
, and
Brun
,
K.
,
2014
, “
Development of High-Efficiency Hot Gas Turbo-Expander for Optimized CSP Supercritical CO2 Power Block Operation
,”
Fourth International Symposium—Supercritical CO2 Power Cycles
, Pittsburgh, PA, Sept. 9–10.
9.
Wilkes
,
J.
,
Allison
,
T.
,
Schmitt
,
J.
,
Bennett
,
J.
,
Wygant
,
K.
,
Pelton
,
R.
, and
Bosen
,
W.
,
2016
, “
Application of an Integrally Geared Compander to an sCO2 Recompression Brayton Cycle
,”
Fifth International Symposium—Supercritical CO2 Power Cycles
, San Antonio, TX, Mar. 28–31.
10.
Allam
,
R.
,
Martin
,
S.
,
Forrest
,
B.
,
Fetvedt
,
J.
,
Lu
,
X.
,
Freed
,
D.
,
Brown
,
W.
,
Sasaki
,
T.
,
Itoh
,
M.
, and
Manning
,
J.
,
2017
, “
Demonstration of the Allam Cycle: An Update on the Development Status of a High-Efficiency Supercritical Carbon Dioxide Power Process Employing Full Carbon Capture
,”
Energy Procedia
,
114
, pp.
5948
5966
.
11.
Held
,
T. J.
,
2015
, “
Supercritical CO2 Power Cycles for Gas Turbine Combined Cycle Power Plants
,” Power-Gen International, Las Vegas, NV, Dec. 8–10.
12.
API
,
2017
, “
Risk-Based Machinery Management
,” American Petroleum Institute, Washington, DC, Standard No. API RP 691.
13.
Hoopes
,
K.
,
Moore
,
J. J.
,
Cich
,
S.
, and
Kalra
,
C.
,
2015
, “
Design of an Air Dynamometer for Direct Connection to the SunShot sCO2 Turbine Expander Shaft
,”
ASME
Paper No. GT2015-44056.
14.
U.S. DOE
,
2015
, “
PROJECT PROFILE: General Electric—GE Global Research
,” U.S. Department of Energy, Washington, DC, Press Release, accessed Nov. 13, 2018, https://energy.gov/eere/sunshot/project-profile-general-electric-ge-global-research