Liberalized electricity market conditions and concentrating solar power technologies call for increased power plant operational flexibility. Concerning the steam turbine (ST) component, one key aspect of its flexibility is the capability for fast starts. In current practice, turbine start-up limitations are set by consideration of thermal stress and low cycle fatigue. However, the pursuit of faster starts raises the question whether other thermal phenomena can become a limiting factor to the start-up process. Differential expansion (DE) is one of such thermal properties, especially since the design of axial clearances is not included as part of start-up schedule design and because its measurement during operation is often limited or not a possibility at all. The aim of this work is to understand DE behavior with respect to transient operation and to quantify the effect that such operation would have in the design and operation of axial clearances. This was accomplished through the use of a validated thermomechanical model that was used to compare DE behavior for different operating conditions of the machine. These comparisons showed that faster starts do not necessarily imply that wider axial clearances are needed, which means that the thermal flexibility of the studied turbine is not limited by DE. However, for particular locations, it was also obtained that axial rubbing can indeed become a limiting factor in direct relation to start-up operation. The resulting approach presented in this work serves to avoid over-conservative limitations in both design and operation concerning axial clearances.

References

1.
Leyzerovich
,
A.
,
1997
,
Large Power Steam Turbines: Design and Operation
, Vol. 2, 2nd ed.,
Penn Well Books
,
Tulsa, OK
.
2.
VGB PowerTech
,
1990
,
Thermal Behavior of Steam Turbines, VGB-R 105 Me
, 2nd ed.,
VGB PowerTech e.V.
,
Essen, Germany
.
3.
Gülen
,
S. C.
,
2013
, “
Gas Turbine Combined Cycle Fast Start: The Physics Behind the Concept
,”
Power Eng.
,
117
(
6
), pp.
40
49
.http://www.power-eng.com/articles/print/volume-117/issue-6/features/gas-turbine-combined-cycle-fast-start-the-physics-behind-the-con.html
4.
Beer
,
W.
,
Propp
,
L.
, and
Voelker
,
L.
,
2015
, “
A Simplified Analytical Approach for Calculating the Start-Up Time of Industrial Steam Turbines for Optimal and Fast Start-Up Procedures
,”
ASME
Paper No. GT2015-43284.
5.
Greis
,
J.
,
Gobrecht
,
E.
, and
Wendt
,
S.
,
2012
, “
Flexible and Economical Operation of Power Plants-25 Years of Expertise
,”
ASME
Paper No. GT2012-68716.
6.
Marinescu
,
G.
,
Ehrsam
,
A.
,
Sell
,
M.
, and
Brunner
,
P.
,
2013
, “
Experimental Investigation in Thermal Behavior of Steam Turbine Components—Part 3: Startup and the Impact of LCF Life
,”
ASME
Paper No. GT2013-94356.
7.
Ekbote
,
A.
, and
Brilliant
,
H.
,
2008
, “
The Analytical Approach to the Temperature Prediction of Steam Turbine Shells Based on the Thermocouple Temperature Measurements at a Few Points
,”
ASME
Paper No. GT2009-50609.
8.
Watanabe
,
E.
,
Nakano
,
T.
,
Tanaka
,
K.
,
Tsutsumi
,
M.
,
Tanaka
,
Y.
,
Ohyama
,
H.
,
Miyawaki
,
T.
, and
Shinohara
,
T.
,
2003
, “
Development of New High Efficiency Steam Turbine
,”
Tech. Rev. Mitsubishi Heavy Ind.
,
40
(
4
), pp.
1
6
.https://mhi.co.jp/technology/review/pdf/e404/e404212.pdf
9.
Hauser
,
A.
,
Hetico
,
R.
, and
Wakeman
,
T.
,
1985
, “
Thermally Responsive Labyrinth Seal
,” General Electric Company, Boston, MA, U.S. Patent No.
US4513975 A
.http://www.google.co.in/patents/US4513975
10.
Couture
,
B.
,
Keeling
,
L.
, and
Kowalczyk
,
M.
,
2006
, “
Clearance and Seals Design for New Heat Steam Turbine
,”
ASME
Paper No. POWER2006-88201.
11.
Spelling
,
J.
,
Jöcker
,
M.
, and
Martin
,
A.
,
2012
, “
Thermal Modeling of a Solar Steam Turbine With a Focus on Start-Up Time Reduction
,”
ASME J. Eng. Gas Turbines Power
,
134
(
1
), p. 013001.
12.
Topel
,
M.
,
2014
, “
Steam Turbine Thermal Modeling for Improved Transient Operation
,” Licentiate thesis, KTH Royal Institute of Technology, Stockholm, Sweden.
13.
Topel
,
M.
,
Genrup
,
M.
,
Jöcker
,
M.
,
Spelling
,
J.
, and
Laumert
,
B.
,
2015
, “
Operational Improvements for Start-Up Time Reduction in Solar Steam Turbines
,”
ASME J. Eng. Gas Turbines Power
,
137
(
4
), p. 042604.
14.
Topel
,
M.
,
Jöcker
,
M.
,
Paul
,
S.
, and
Laumert
,
B.
,
2015
, “
Differential Expansion Sensitivity Studies During Steam Turbine Startup
,”
ASME J. Eng. Gas Turbines Power
,
138
(
8
), p. 062102.
15.
Topel
,
M.
,
Spelling
,
J.
,
Jöcker
,
M.
, and
Laumert
,
B.
,
2013
, “
Geometric Modularity in the Thermal Modeling of Solar Steam Turbines
,”
Energy Procedia
,
49
, pp.
1737
1746
.https://doi.org/10.1016/j.egypro.2014.03.184
16.
Brilliant
,
H.
, and
Tolpadi
,
H.
,
2004
, “
Analytical Approach to Steam Turbine Heat Transfer in a Combined Cycle Power Plant
,”
ASME
Paper No. GT2004-53387.
You do not currently have access to this content.