In the fast start-up for combined cycle power plants (CCPP), the thermal stresses of the steam turbine rotor are generally controlled by the steam temperatures or flow rates by using gas turbines (GTs), steam turbines, and desuperheaters to avoid exceeding the thermal stress limits. However, this thermal stress sensitivity to steam temperatures and flow rates depends on the start-up sequence due to the relatively large time constants of the heat transfer response in the plant components. In this paper, a coordinated control method of gas turbines and steam turbine is proposed for thermal stress control, which takes into account the large time constants of the heat transfer response. The start-up processes are simulated in order to assess the effect of the coordinated control method. The simulation results of the plant start-ups after several different cool-down times show that the thermal stresses are stably controlled without exceeding the limits. In addition, the steam turbine start-up times are reduced by 22–28% compared with those of the cases where only steam turbine control is applied.

References

1.
Balling
,
L.
,
2010
, “
Flexible Future for Combined Cycle
,”
Modern Power Systems
,
30
(12), pp.
61
64
.http://connection.ebscohost.com/c/articles/57309838/flexible-future-combined-cycle
2.
Henkel
,
N.
,
Schmid
,
E.
, and
Gobrecht
,
E.
,
2008
, “
Operational Flexibility Enhancements of Combined Cycle Power Plants
,”
Power-Gen Asia
, Kuala Lumpur, Malaysia, Oct. 21–23.http://www.energy.siemens.com/hq/pool/hq/energy-topics/pdfs/en/combined-cycle-power-plants/OperationalFlexibilityEnhancementsofCombinedCyclePowerPlants.pdf
3.
Balling
,
L.
,
2011
, “
Fast Cycling and Rapid Start-Up: New Generation of Plants Achieves Impressive Results
,”
Modern Power Systems
,
31
(1), pp.
35
41
.http://connection.ebscohost.com/c/articles/58771000/fast-cycling-rapid-start-up-new-generation-plants-achieves-impressive-results
4.
Alyah
,
M.
,
Ashman
,
J.
,
Arisoy
,
A.
,
Astley
,
E.
,
Herbst
,
E.
,
Jennings
,
P.
,
Gusev
,
A.
,
Emelyanov
,
R.
, and
Radevsky
,
R.
,
2015
, “
Combined Cycle Power Plants
,”
International Association of Engineering Insurers Annual Conference
, Merida, Mexico, Sept. 26–30, Paper No. 91 (15).http://www.imia.com/wp-content/uploads/2015/10/IMIA-WGP-09115-CCPP-Combined-Cycle-Power-PlantsFinal-1.pdf
5.
Bohtz
,
C.
,
Stevens
,
M.
,
Sackmann
,
H.
, and
Ruedt
,
A.
,
2013
, “
District Heating With the Flexibility of the KA26 Combined Cycle Power Plant
,”
Russia Power
, Moscow, Russia, Mar. 5–6.http://www.life-needs-power.de/wp-content/uploads/2013/04/20130409_11_30_Bohtz.pdf
6.
McManus
,
M.
, and
Baumgartner
,
R.
,
2003
, “
An Integrated Combined-Cycle Plant Design That Provides Fast Start Capability at Base-Load
,” Power-Gen, Las Vegas, NV, Dec. 4–6.
7.
Brückner
,
J.
, and
Schlund
,
G.
,
2011
, “
Pego Experience Confirms BENSON as Proven HRSG Technology
,”
Modern Power Systems
,
31
(6), pp.
21
24
.http://connection.ebscohost.com/c/articles/64304481/pego-experience-confirms-benson-as-proven-hrsg-technology
8.
Greis
,
J.
,
Gobrecht
,
E.
, and
Wendt
,
S.
,
2012
, “
Flexible and Economical Operation of Power Plants—25 Years of Expertise
,”
ASME
Paper No. GT2012-68716.
9.
Ruchti
,
C.
,
Olia
,
H.
,
Franitza
,
K.
, and
Ehrsam
,
A.
,
2011
, “
Combined Cycle Power Plants as Ideal Solution to Balance Grid Fluctuations
,”
Kraftwerkstechnisches Kolloquium
, TU Dresden, Germany, Sept. 18–19.http://gastopowerjournal.com/documents/110918_kraftwerkstechnisches_kolloquium_ccpp_as_ideal_so2.pdf
10.
Vogt
,
J.
,
Schaaf
,
T.
,
Mohr
,
W.
, and
Helbig
,
K.
,
2013
, “
Flexibility Improvement of the Steam Turbine of Conventional or CCPP
,”
Power-Gen Europe
, Cologne, Germany, June 4–6, Paper No. T6S4O2.http://pennwell.sds06.websds.net//2013/vienna/pge/papers/T6S4O2-paper.pdf
11.
Gülen
,
S. C.
, and
Jones
,
C. M.
,
2011
, “
GE's Next Generation CCGT Plants: Operational Flexibility is the Key
,”
Modern Power Systems
,
35
(6), pp.
16
18
.http://connection.ebscohost.com/c/articles/108515437/ge-awarded-ltsa-new-ccgt-plant-tatarstan
12.
Matsumoto
,
S.
,
Yakushi
,
K.
, and
Kitaguchi
,
N.
,
2010
, “
Optimal Turbine Startup Methodology Based on Thermal Stress Prediction
,”
Therm. Nucl. Power
,
61
(
9
), pp.
798
803
.
13.
Casella
,
F.
, and
Pretolani
,
F.
,
2006
, “
Fast Start-Up of a Combined-Cycle Power Plant: A Simulation Study With Modelica
,”
5th International Modelica Conference
, Vienna, Austria, Sept. 4–5.https://www.modelica.org/events/modelica2006/Proceedings/sessions/Session1a1.pdf
14.
Checcacci
,
D.
,
Cosi
,
L.
, and
Sah
,
S.
,
2011
, “
Rotor Life Prediction and Improvement for Steam Turbines Under Cyclic Operation
,”
ASME
Paper No. GT2011-45792.
15.
Gülen
,
S. C.
, and
Kim
,
K.
,
2014
, “
Gas Turbine Combined Cycle Dynamic Simulation: A Physics Based Simple Approach
,”
ASME J. Eng. Gas Turbines Power
,
136
(
1
), p.
01661
.
16.
Inui
,
T.
,
Nishijima
,
T.
,
Kusaka
,
I.
,
Kashiwahara
,
K.
, and
Fukushima
,
K.
,
1981
, “
Combined Cycle Power Plant
,”
Hitachi Rev.
,
63
(
7
), pp.
443
448
.
You do not currently have access to this content.