The paper reports on the full-scale application and testing of the detonation-wave technique in two boilers, fired with pulverized coal, of total thermal power of 600 MW. Continuous monitoring over a period of several years confirmed earlier laboratory findings, reported in the companion Part I of the paper. The testing proved that the technique is efficient and reliable, with a number of advantages in comparison with various conventional cleaning methods. In spite of the fact that the lining of one of the boilers is made of classic refractory material, careful records and inspection over several years of daily application of the detonation wave technique showed no signs of any undesirable effects. The method was officially adopted as a routine deposit removal technique in the Power Plant “Kakanj” in Bosnia.
Skip Nav Destination
Article navigation
January 1994
Research Papers
Detonation-Wave Technique for On-Load Deposit Removal From Surfaces Exposed to Fouling: Part II—Full-Scale Application
K. Hanjalic´,
K. Hanjalic´
Lehrstuhl fu¨r Stro¨mungsmechanik, University of Erlangen-Nu¨rnberg, Erlangen, Federal Republic of Germany
Search for other works by this author on:
I. Smajevic´
I. Smajevic´
University of Sarajevo, Bosnia Hercegovina
Search for other works by this author on:
K. Hanjalic´
Lehrstuhl fu¨r Stro¨mungsmechanik, University of Erlangen-Nu¨rnberg, Erlangen, Federal Republic of Germany
I. Smajevic´
University of Sarajevo, Bosnia Hercegovina
J. Eng. Gas Turbines Power. Jan 1994, 116(1): 231-236 (6 pages)
Published Online: January 1, 1994
Article history
Received:
January 12, 1992
Online:
April 24, 2008
Citation
Hanjalic´, K., and Smajevic´, I. (January 1, 1994). "Detonation-Wave Technique for On-Load Deposit Removal From Surfaces Exposed to Fouling: Part II—Full-Scale Application." ASME. J. Eng. Gas Turbines Power. January 1994; 116(1): 231–236. https://doi.org/10.1115/1.2906798
Download citation file:
Get Email Alerts
Cited By
Inter-Stage Pressure Drop of Multi-Stage Brush Seal With Differentiated Structure
J. Eng. Gas Turbines Power (July 2023)
Estimation of Wiebe Function Parameters for Syngas and Anode Off-Gas Combustion in Spark-Ignition Engines
J. Eng. Gas Turbines Power (July 2023)
Mixture Distribution in Spark Ignited Port Fuel Injection Engines: A Review
J. Eng. Gas Turbines Power (July 2023)
Related Articles
Detonation-Wave Technique for On-Load Deposit Removal From Surfaces Exposed to Fouling: Part I—Experimental Investigation and Development of the Method
J. Eng. Gas Turbines Power (January,1994)
Advanced Coal-Fired Power Plants
J. Energy Resour. Technol (March,2001)
Design and Performance Verification of a 62-MWt CFB Boiler
J. Eng. Gas Turbines Power (January,2001)
Multifunctional Energy System (MES) With Multifossil Fuels and Multiproducts
J. Eng. Gas Turbines Power (April,2007)
Related Proceedings Papers
Related Chapters
Development of Nuclear Boiler and Pressure Vessels in Taiwan
Global Applications of the ASME Boiler & Pressure Vessel Code
Development of Nuclear Boiler and Pressure Vessels in Taiwan
Companion Guide to the ASME Boiler and Pressure Vessel Code, Volume 3, Third Edition
Combined Cycle Power Plant
Energy and Power Generation Handbook: Established and Emerging Technologies