There are many community needs. Refuse is an abundant byproduct of our civilization. The disposal of this byproduct has become a major problem for our cities. This paper describes one community’s efforts to turn a community problem, refuse disposal, into a community asset. The paper describes the many aspects of effort and technology required to develop the Indianapolis Resource Recovery Facility. This facility required the cooperation of the public and private sectors to blend technology into a successful project. Special efforts were required to match appropriate technology to specific community needs and produce a successful and economically sound project. Five basic activities are presented. The first four activities are essential steps for any community to assure the right project fit to community needs. The areas presented are: (1) defining community needs, (2) technology evaluation (approaches evaluated), (3) feasibility studies (economic studies), (4) project implementation (bids and contracts), and (5) a description of the Indianapolis Resource Recovery facility. A review of these five areas places a real world perspective on refuse as an alternative fuel and source of resource recovery.
Skip Nav Destination
Article navigation
January 1990
Research Papers
Indianapolis Resource Recovery Facility: Community Efforts and Techology Required for a Successful Project
P. L. Stevens,
P. L. Stevens
Indianapolis Department of Public Works, Indianapolis, IN 46204
Search for other works by this author on:
J. S. Henderson,
J. S. Henderson
CRS Sirrine, Inc., Research Triangle Park, NC 27709
Search for other works by this author on:
R. Tulli
R. Tulli
Ogden Martin Systems of Indianapolis, Fairfield, NJ 07607
Search for other works by this author on:
P. L. Stevens
Indianapolis Department of Public Works, Indianapolis, IN 46204
J. S. Henderson
CRS Sirrine, Inc., Research Triangle Park, NC 27709
R. Tulli
Ogden Martin Systems of Indianapolis, Fairfield, NJ 07607
J. Eng. Gas Turbines Power. Jan 1990, 112(1): 31-37 (7 pages)
Published Online: January 1, 1990
Article history
Received:
June 30, 1987
Online:
April 24, 2008
Citation
Stevens, P. L., Henderson, J. S., and Tulli, R. (January 1, 1990). "Indianapolis Resource Recovery Facility: Community Efforts and Techology Required for a Successful Project." ASME. J. Eng. Gas Turbines Power. January 1990; 112(1): 31–37. https://doi.org/10.1115/1.2906474
Download citation file:
14
Views
Get Email Alerts
Cited By
An Adjustable Elastic Support Structure for Vibration Suppression of Rotating Machinery
J. Eng. Gas Turbines Power
Operation of a Compression Ignition Engine at Idling Load under Simulated Cold Weather Conditions
J. Eng. Gas Turbines Power
In-Cylinder Imaging and Emissions Measurements of Cold-Start Split Injection Strategies
J. Eng. Gas Turbines Power
Related Articles
Energy Recovery From Refuse in the Kiel District Heating Station
J. Energy Resour. Technol (June,1983)
An Approach to Determining the Economic Feasibility of Refuse-Derived Fuel and Materials Recovery Processing
J. Energy Resour. Technol (June,1980)
Oxides of Nitrogen: Formation and Control in Resource Recovery Facilities
J. Energy Resour. Technol (June,1985)
Design of the First Large United Kingdom Power Producing Refuse Disposal Plant
J. Eng. Power (July,1970)
Related Proceedings Papers
Related Chapters
Dismantling
Decommissioning Handbook
Decision Tool for Selecting the Most Appropriate Technology for Underground Conduit Construction
Geological Engineering: Proceedings of the 1 st International Conference (ICGE 2007)
Utilizing Waste Materials as a Source of Alternative Energy: Benefits and Challenges
Energy and Power Generation Handbook: Established and Emerging Technologies