A new test procedure is proposed for the field acceptance testing of large hydroelectric turbines. This procedure is an improvement over existing procedures in that it generates test data from which a statistical estimate of turbine efficiency as well as a confidence band on that estimate can be calculated.

This content is only available via PDF.
You do not currently have access to this content.