A 14-MW, high-temperature gas turbine firing extremely low-BTU, blast-furnace gas was developed and installed in a steel works of Japan as a repowering unit. Field tests proved the stable combustion up to 590 Kcal/Nm3 calorific value and plant efficiency improvement of up to 60 percent on existing steam plant. Design features and two years operational experiences are presented.

This content is only available via PDF.
You do not currently have access to this content.