This paper discusses the evaluation, design, and operation of a combined-cycle plant for Bahamas Electricity Corporation in Nassau, Bahamas. The plant was designed to provide maximum fuel efficiency, satisfactorily operate to 40 percent load, and includes provisions for heavy oil firing in the gas turbine. The system was started up July, 1982 and has been in successful operation since then.

This content is only available via PDF.
You do not currently have access to this content.