Abstract

Eight Kaplan turbines recently installed in the Pickwick Landing, Guntersville, and Chickamauga plants of the Tennessee Valley Authority have a total capacity of 300,000 hp at rated head, and in physical size are among the largest constructed. The paper reviews the function of Kaplan turbine plants in the Tennessee River development as a whole, the determination of turbine requirements, the power-station arrangement, and noteworthy features of turbine design, construction, and erection.