In recent years, the oil industry has used various methodologies to solve numerical coupling of reservoirs and production systems to properly model complex projects needing an integrated solution of computational models that represent the fluid flow through the reservoir up to the surface. We present a study of explicit coupling methodology testing the production system on common operating conditions, verifying the benefits and quantifying limitations of explicit methodology, due to numerical stability errors reported in literature.

References

References
1.
Mamghaderi
,
A.
,
Bastami
,
A.
, and
Pourafshary
,
P.
,
2012
, “
Optimization of Waterflooding Performance in a Layered Reservoir Using a Combination of Capacitance-Resistive Model and Genetic Algorithm Method
,”
ASME, J. Energy Resour. Technol.
,
135
(
1
), p.
013102
.10.1115/1.4007767
2.
Cotrim
,
H. A.
,
Hohendorff Filho
,
J. C. V.
, and
Schiozer
,
D. J.
,
2011
, “
Production Optimization Considering Interaction Between Reservoirs and Constrained Surface Facilities
,”
Reservoir Characterization and Simulation Conference and Exhibition
, Abu Dhabi, UAE, Oct. 9–11, Paper No. SPE 148334
3.
Rotondi
,
M.
,
Cominelli
,
A.
,
Di Giorgio
,
C.
,
Rossi
,
R.
,
Vignati
,
E.
, and
Caraati
,
B.
,
2008
, “
The Benefits of Integrated Asset Modeling: Lesson Learned From Field Cases
,”
Europec/EAGE Annual Conference and Exhibition
, Rome, Italy, June 9–18, Paper No. SPE 113831.
4.
Camponogara
,
E.
, and
Nakashima
,
P. H. R.
,
2006
, “
Optimal Allocation of Lift-Gas Rates Under Multiple Facility Constraints: A Mixed Integer Linear Programming Approach
,”
ASME J. Energy Resour. Technol.
,
128
(
4
), pp.
280
289
.10.1115/1.2358143
5.
Romero
,
O. J.
, and
Hupp
,
A.
,
2013
, “
Subsea Electrical Submersible Pump Significance in Petroleum Offshore Production
,”
ASME J. Energy Resour. Technol.
,
136
(
1
), p.
012902
, Paper No. JERT-12-1245.10.1115/1.4025258
6.
Vera
,
R. A. R.
,
Solano
,
K.
,
Guevara
,
S.
,
Velezquez
,
M.
, and
Saputelli
,
L. A.
,
2007
, “
Integration of Subsurface, Surface, and Economics Under Uncertainty in Orocual Field
,”
Latin American & Caribbean Petroleum Engineering Conference
, Buenos Aires, Argentina, April 15–18, Paper No. SPE 107259.
7.
Al-Mutairi
,
S. M.
,
Hayder
,
E. M.
,
Al-Shammari
,
A. T.
,
Al-Jama
,
N. A.
, and
Munoz
,
A.
,
2010
, “
A Study of Coupling Surface Network to Reservoir Simulation Model in a Large Middle East Field
,”
North Africa Conference and Exhibition
, Cairo, Egypt, Feb. 14–17, Paper No. SPE 127976.
8.
Barroux
,
C. C.
,
Duchet-Suchaux
,
P.
,
Samier
,
P.
, and
Nabil
,
R.
,
2000
, “
Linking Reservoir and Surface Simulator: How to Improve the Coupled Solutions
,”
European Petroleum Conference
, Paris, France, Oct. 24–25, Paper No. SPE 65159.
9.
Bento
,
D. F.
,
2010
, “
Influência de Restrições de Produção na Definição da Estratégia de Explotação de Campos de Petróleo
,” M.Sc. dissertation, Universidade Estadual de Campinas, Campinas, Brazil.
10.
Coats
,
B. K.
,
Fleming
,
G. C.
,
Watts
,
J. W.
,
Rame
,
M.
, and
Shiralkar
,
G. S.
,
2003
, “
A Generalized Wellbore and Surface Facility Model, Fully Coupled to a Reservoir Simulator
,”
J. SPE Reservoir Symp. Simul.
,
7
(
2
), pp.
132
142
.
11.
Zapata
,
V. J.
,
Brummett
,
W. M.
,
Osborne
,
M. E.
, and
Nispenl
,
D. J. V.
,
2001
, “
Advances in Tightly Coupled Reservoir/Wellbore/Surface-Network Simulation
,”
J. SPE Reservoir Eval. Eng.
,
4
(
2
), pp.
114
120
, Paper No. SPE71120.10.2118/71120-PA
12.
Ghorayeb
,
K.
,
Holmes
,
J.
,
Torrens
,
R.
, and
Grewal
,
B.
,
2003
, “
A General Purpose Controller for Coupling Multiple Reservoir Simulations and Surface Facility Networks
,”
Reservoir Simulation Symposium
, Houston, TX, Feb. 3–5, Paper No. SPE 79702.
13.
Hayder
,
M. E.
,
Putra
,
S. A.
, and
Shammari
,
A. T.
,
2001
, “
Coupled Facility and Reservoir Simulations to Optimize Strategies for a Mature Field
,”
SPE Reservoir Characterization and Simulation Conference and Exhibition
, Abu Dhabi, UAE, Oct. 9–11, Paper No. SPE 147994.
14.
Hohendorff FILHO
,
J. C. V.
, and
Schiozer
,
D. J.
,
2012
, “
Evaluation on Explicit Coupling Between Reservoir Simulators and Production System
,”
ASME 2012 31st International Conference on Ocean, Offshore and Arctic Engineering, Petroleum Technology Symposium
, Rio de Janeiro, Brazil, July 1–6,
ASME
Paper No. OMAE 2012-84228. 10.1115/OMAE2012-84228
15.
Ayala
,
L. F.
, and
Alp
,
D.
,
2008
, “
Evaluation of “Marching Algorithms” in the Analysis of Multiphase Flow in Natural Gas Pipelines
,”
ASME J. Energy Resour. Technol.
,
130
(
4
), p.
043003
.10.1115/1.3000103
16.
Flores
,
J. G.
,
Sarica
,
C.
,
Chen
,
T. X.
, and
Brill
,
J. P.
,
1998
, “
Investigation of Holdup and Pressure Drop Behavior for Oil-Water Flow in Vertical and Deviated Wells
,”
ASME J. Energy Resour. Technol.
,
120
(
1
), pp.
8
14
.10.1115/1.2795016
17.
Furukawa
,
H.
,
Shoham
,
O.
, and
Brill
,
J. P.
,
1986
, “
Predicting Compositional Two-Phase Flow Behavior in Pipelines
,”
ASME J. Energy Resour. Technol.
,
108
(
3
), pp.
207
210
.10.1115/1.3231266
18.
Sukarno
,
P.
,
Saepudin
,
D.
,
Dewi
,
S.
,
Soewono
,
E.
,
Sidarto
,
K. A.
, and
Gunawan
,
A. Y.
,
2009
, “
Optimization of Gas Injection Allocation in a Dual Gas Lift Well System
,”
ASME J. Energy Resour. Technol.
,
131
(
3
), p.
033101
.10.1115/1.3185345
19.
Schiozer
,
D. J.
,
1994
, “
Simultaneous Simulation of Reservoir and Surface Facilities
,” Ph.D. dissertation, Stanford University, Stanford, CA.
20.
Güyagüler
,
B.
,
Zapata
,
V. J.
,
Cao
,
H.
,
Stamati
,
H. F.
, and
Holes
,
J. A.
,
2011
, “
Near-Well Subdomain Simulations for Accurate Inflow Performance Relationship Calculation to Improve Stability of Reservoir-Network Coupling
,”
J. SPE Reservoir Eval. Eng.
,
14
(
5
), Paper No. SPE 141207, pp.
634
643
.
21.
Middya
,
U.
, and
Dogru
,
A. H.
,
2008
, “
Computation of Average Well Drainage Pressure for a Parallel Reservoir Simulator
,”
SPE Saudia Arabia Section Technical Symposium
, Al-Khobar, Saudi Arabia, May 10–12, Paper No. SPE 120816.
22.
Denney
,
D.
,
2003
, “
Optimizing Production Operations
,”
J. Pet. Technol.
,
3
, pp.
59
60
.
23.
Hohendorff FILHO
,
J. C. V.
,
2012
, “
Avaliação do Acoplamento Explícito entre Simulação de Reservatório e Sistema de Produção
,” M.Sc. dissertation, Universidade Estadual de Campinas, Campinas, Brazil.
You do not currently have access to this content.