Well testing is routinely performed to evaluate the performance of a well, which establishes the allocation factor for the lease, which in turn establishes tax and royalty basis. Most well testing is done with conventional gravity separators, which separates the produced stream into oil, water, and gas components and measures these individual components as individual streams. New multiphase measurement technology improves well test results through improved accuracy, consistency, and more frequent well testing. This paper examines the implication of these improved capabilities to recognize well problems and optimize production. A simple economic model is provided that an operator can use to assess the balance between the cost of performing periodic well tests and the benefits of more quickly discovering well problems that can result in less than expected production. The model relates the cost of decreased production, as the result of unforeseen changes in the well, to the frequency and accuracy of the well tests. The model derives an optimum test interval that minimizes the total cost of well testing and deferred production on the basis of the probability that a higher than normal decline in production rate can be detected by well testing. The model is then used in several field examples to assess the optimum period between well tests and how the optimum period can lead to reduced cost of operation and improved production.
Skip Nav Destination
Article navigation
September 2004
Technical Papers
The Role of Well Testing in Recognizing Deferred Production Revenue
D. T. Perry
D. T. Perry
Mustang Engineering, Inc.
Search for other works by this author on:
P. Mehdizadeh
Production Technology Inc.
D. T. Perry
Mustang Engineering, Inc.
Contributed by the Petroleum Division of THE AMERICAN SOCIETY OF MECHANICAL ENGINEERS, and presented at the ETCE 2002 Houston, Texas, February 4–6, 2002. Manuscript received by the Petroleum Division February 20, 2002; revised manuscript received January 6, 2004. Associate Editor: E. Ozkan.
J. Energy Resour. Technol. Sep 2004, 126(3): 177-183 (7 pages)
Published Online: October 19, 2004
Article history
Received:
February 20, 2002
Revised:
January 6, 2004
Online:
October 19, 2004
Citation
Mehdizadeh, P., and Perry, D. T. (October 19, 2004). "The Role of Well Testing in Recognizing Deferred Production Revenue ." ASME. J. Energy Resour. Technol. September 2004; 126(3): 177–183. https://doi.org/10.1115/1.1789521
Download citation file:
Get Email Alerts
Cited By
Related Articles
Global Optimization of Gas Allocation to a Group of Wells in Artificial Lift Using Nonlinear Constrained Programming
J. Energy Resour. Technol (December,2002)
Editorial
J. Energy Resour. Technol (June,2001)
Two-Phase Flow Correlations as Applied to Pumping Well Testing
J. Energy Resour. Technol (June,1994)
Introduction to Special Issue: Reassessment and Requalification of
Offshore Platforms
J. Offshore Mech. Arct. Eng (February,2000)
Related Chapters
Introduction
Corrosion and Materials in Hydrocarbon Production: A Compendium of Operational and Engineering Aspects
Pulsation and Vibration Analysis of Compression and Pumping Systems
Pipeline Pumping and Compression Systems: A Practical Approach, Second Edition
Pulsation and Vibration Analysis of Compression and Pumping Systems
Pipeline Pumping and Compression System: A Practical Approach, Third Edition