The problem of purging closed-end side-branches in natural gas facilities is considered in this paper. Experimental results obtained in a scale model are presented, where air and carbon dioxide were used to simulate air and natural gas in the field. The time required to reduce the concentration in the side-branch below the lower explosive limit is determined as a function of purge velocity and side-branch length. Two different purging techniques, steady and intermittent purging, are evaluated in this paper. For steady purging it is shown that, contrary to intuition, more efficient purging occurs at low purge velocities rather than at high purging velocities. It is also shown that when cyclic purging techniques are employed, purge gas savings in excess of 90 percent can be achieved. Application of these methods to operations can provide financial savings and significantly reduce atmospheric pollution.
Skip Nav Destination
Article navigation
June 1994
Research Papers
Steady and Cyclic Purging of Closed-End Side-Branches in Natural Gas Facilities
D. E. Kiel
D. E. Kiel
Novacor Research and Technology Corporation, 2928 16th Street, N.E., Calgary, Alberta, Canada T2E 7K7
Search for other works by this author on:
D. E. Kiel
Novacor Research and Technology Corporation, 2928 16th Street, N.E., Calgary, Alberta, Canada T2E 7K7
J. Energy Resour. Technol. Jun 1994, 116(2): 161-167 (7 pages)
Published Online: June 1, 1994
Article history
Received:
April 4, 1992
Revised:
February 8, 1994
Online:
April 16, 2008
Citation
Kiel, D. E. (June 1, 1994). "Steady and Cyclic Purging of Closed-End Side-Branches in Natural Gas Facilities." ASME. J. Energy Resour. Technol. June 1994; 116(2): 161–167. https://doi.org/10.1115/1.2906022
Download citation file:
Get Email Alerts
Cited By
Related Articles
Benefits of MS 6001B Gas Turbine in Cogeneration: The UEM Power Plant Case
J. Eng. Gas Turbines Power (April,1996)
Power and Hydrogen Co-Production in Flexible “Powdrogen” Plants
J. Eng. Gas Turbines Power (June,2023)
The Potential of FOX-7 Explosive in Insensitive Munition Design
J. Appl. Mech (September,2011)
Explosive Decompression Resistance of Centrifugal Compressor O-Ring Seals: A Comparative Test Summary and Procedure
J. Eng. Gas Turbines Power (April,1988)
Related Proceedings Papers
Related Chapters
Pipeline Integrity and Security
Continuing and Changing Priorities of the ASME Boiler & Pressure Vessel Codes and Standards
Studies Performed
Closed-Cycle Gas Turbines: Operating Experience and Future Potential
Conclusions
Clean and Efficient Coal-Fired Power Plants: Development Toward Advanced Technologies