This paper presents an analysis of the problem of reorientation of a riser pipe from an initially horizontal configuration during subsurface tow to the vertical position for installation. Front and rear barges support the pipe through cables. The orientation into a vertical configuration is accomplished by paying out the front cable. The pipe is treated as a Bernoulli-Euler beam with significant tension undergoing large angle deflections. A finite element procedure used state transfer matrices and successive linearization and the results show that the stress critical phase occurs when the pipe is going through the 60-deg angle to the horizontal direction.