Skip to Main Content
Skip Nav Destination
Pipeline Design & Construction: A Practical Approach, Third Edition
By
M. Mohitpour
M. Mohitpour
Search for other works by this author on:
H. Golshan
H. Golshan
Search for other works by this author on:
A. Murray
A. Murray
Search for other works by this author on:
ISBN-10:
0791802574
No. of Pages:
752
Publisher:
ASME Press
Publication date:
2007

The material covered in this chapter highlights the activities involved in pipeline construction, testing and commissioning procedures. This discussion will focus on the necessary steps to ensure quality facilities are constructed and installed before handover to the operations group for daily operation. A typical pipeline spread is illustrated in Figure 9-1 and shows the various activities involved and their linear progression over the course of the project.

Introduction
Construction
Trenchless Crossings
Filling and Hydrostatic Testing
Dewatering
Evaluation of Squeeze Volumes
Hydrostatic Test Sections Containing Trapped Air
Hydrostatic Water Criteria
Hydrostatic Testing at Low Ambient Temperatures
Pneumatic Testing of Pipelines
Commissioning
References
This content is only available via PDF.
You do not currently have access to this chapter.
Close Modal

or Create an Account

Close Modal
Close Modal