Skip to Main Content
Skip Nav Destination

Risk Importance Measures in the Design and Operation of Nuclear Power Plants

By
Ivan Vrbanic
Ivan Vrbanic
Search for other works by this author on:
Pranab Samanta
Pranab Samanta
Search for other works by this author on:
Ivica Basic
Ivica Basic
Search for other works by this author on:
ISBN:
9780791861394
No. of Pages:
152
Publisher:
ASME Press
Publication date:
2017

It can be said that the idea for risk importance measures originates from the concept of traditional sensitivity analysis, which might not necessarily be related to the risk (reliability) studies. One type of sensitivity analysis is to change one of the parameters and see how much effect it makes on the result. A systematic approach would be to calculate the fractional change in result for a fractional change in a variable or parameter.

4.1
Background on Importance Measures in Risk Assessment
4.2
Importance Measures Broadly Used in PRAs for NPPs
4.3
Examples of Use of Risk Importance Measures in Risk-Informed Applications
4.4
Risk Importance Measures: Focus of Discussion in this Monograph
This content is only available via PDF.
You do not currently have access to this chapter.
Close Modal

or Create an Account

Close Modal
Close Modal