Skip Nav Destination
Consensus on Pre-Commissioning Stages for Cogeneration and Combined Cycle Power PlantsAvailable to Purchase
ISBN:
9780791861264
No. of Pages:
100
Publisher:
ASME Press
Publication date:
2017
eBook Chapter
6 Off-Site Fabrication and Assembly Available to Purchase
Page Count:
2
-
Published:2017
Citation
ASME Committee. "Off-Site Fabrication and Assembly." Consensus on Pre-Commissioning Stages for Cogeneration and Combined Cycle Power Plants. Ed. ASME Committee. ASME Press, 2017.
Download citation file:
Shop hydrostatic testing water should be pH adjusted and contain a liquid-based VPCI. After shop hydrostatic testing, components should be drained and air-blown dry. A vapor-phase corrosion inhibitor (VPCI) may be applied prior to capping and sealing for transportation and storage.
This content is only available via PDF.
You do not currently have access to this chapter.
Email alerts
Related Chapters
Containments for Transportation and Storage of Spent Nuclear Fuel and High-Level Radioactive Material and Waste
Online Companion Guide to the ASME Boiler & Pressure Vessel Codes
Containments for Transportation and Storage of Spent Nuclear Fuel and High-Level Radioactive Material and Waste 1
Companion Guide to the ASME Boiler and Pressure Vessel Codes, Volume 1, Fifth Edition
Introduction
Corrosion and Materials in Hydrocarbon Production: A Compendium of Operational and Engineering Aspects
Initial Hydrostatic Test (Hydro) and High-Velocity Flush (HVF)
Consensus on Pre-Commissioning Stages for Cogeneration and Combined Cycle Power Plants
Related Articles
A Review on Well Integrity Issues for Underground Hydrogen Storage
J. Energy Resour. Technol (April,2022)
Reliability of Postmolded IC Packages
J. Electron. Packag (December,1993)
Pressure Testing Feedwater Heaters and Power Plant Auxiliary Heat Exchangers
J. Pressure Vessel Technol (October,2011)