Consensus on Pre-Commissioning Stages for Cogeneration and Combined Cycle Power Plants
ISBN:
9780791861264
No. of Pages:
100
Publisher:
ASME Press
Publication date:
2017
eBook Chapter
3 Avoiding Premature Failure
Page Count:
6
-
Published:2017
Citation
ASME Committee. "Avoiding Premature Failure." Consensus on Pre-Commissioning Stages for Cogeneration and Combined Cycle Power Plants. Ed. ASME Committee. ASME Press, 2017.
Download citation file:
The potential for component failures may increase due to poor preplanning, improper selection and execution of design specifications, or inadequately performed pre-commissioning stages. The nature of these failures may be mechanical, operational, or chemical. Maintaining and monitoring cleanliness during fabrication, shipping, site storage, field construction, and pre-commissioning cleaning will avoid lengthy start-up delays and post-commissioning failures.
Topics:
Failure
This content is only available via PDF.
You do not currently have access to this chapter.
Email alerts
Related Chapters
USE OF A GEOHAZARD MANAGEMENT PROGRAM TO REDUCE PIPELINE FAILURE RATES
Pipeline Integrity Management Under Geohazard Conditions (PIMG)
Case Histories Illustrating Fractographic Analysis Techniques
Fractography in Failure Analysis
Failure Analysis of a Hydraulic Turbine Shaft
Fractography of Ceramic and Metal Failures
A Scientific Approach to Composite Laminate Strength Prediction
Composite Materials: Testing and Design (Tenth Volume)
Related Articles
Revisiting Failure of Brittle Materials
J. Pressure Vessel Technol (December,2021)
An Approach to Quantify Anisotropic Multiaxial Failure of the Annulus Fibrosus
J Biomech Eng (January,2024)