Skip to Main Content
Skip Nav Destination
ASME Press Select Proceedings
International Conference on Advanced Computer Theory and Engineering (ICACTE 2009)
By
Xie Yi
Xie Yi
Search for other works by this author on:
ISBN:
9780791802977
No. of Pages:
2012
Publisher:
ASME Press
Publication date:
2009

The effective measures to predict scouring of river bed and water lever lowing downstream of the reservoir are needed in channel engineering. In this paper, the SMS version 8.1 model was evaluated to predict the process of the riverbed longitudinal erosion and water level lowing downstream of Changzhou Reservoir. According to the model calculation results, the consequence is that the water level descends about 59cm in the near-dam reach downstream and the maximum erosion depth of cross section is about 2.08m.

Abstract
Key Words
1. Introduction
2. General Situation of Changzhou Project
3. Mathematical Model Calculation of River Bed Erosion
4. Result Analysis
5. Summaries
References
This content is only available via PDF.
You do not currently have access to this chapter.
Close Modal

or Create an Account

Close Modal
Close Modal