Skip to Main Content
Skip Nav Destination
Consensus for the Lay-up of Boilers, Turbines, Turbine Condensors, and Auxiliary Equipment (CRTD-66)
By
The Turbine/Turbine Condenser Lay-up Task Group and the Boiler Lay-up Task group for the Water Technology Subcommittee of the ASME Research and Technology Committee on Water and Steam in Thermal Power Systems
The Turbine/Turbine Condenser Lay-up Task Group and the Boiler Lay-up Task group for the Water Technology Subcommittee of the ASME Research and Technology Committee on Water and Steam in Thermal Power Systems
Search for other works by this author on:
ISBN:
9780791836187
No. of Pages:
68
Publisher:
ASME Press
Publication date:
2002

This procedure is not applicable to air-cooled condensers. Consult the condenser manufacturer for specific procedures for lay-up of this equipment.

10.1
Steam Side
10.2
Waterside of Turbine Condenser
This content is only available via PDF.
You do not currently have access to this chapter.
Close Modal

or Create an Account

Close Modal
Close Modal