International Conference on Mechanical and Electrical Technology, 3rd, (ICMET-China 2011), Volumes 1–3

By
Yi Xie
Yi Xie
Search for other works by this author on:
ISBN:
9780791859810
No. of Pages:
906
Publisher:
ASME Press
Publication date:
2011

In this paper, the facility programming and the working process in steel industry is studied, the melioration and optimization of the work flow is proposed under the guidance of JIT, an emulating is made with Flexsim, and the weakness of the system is able to be set according to the analysis of the simulation, so as to improve the system.