Skip to Main Content
ASME Press Select Proceedings

International Conference on Mechanical and Electrical Technology, 3rd, (ICMET-China 2011), Volumes 1–3

By
Yi Xie
Yi Xie
Search for other works by this author on:
ISBN:
9780791859810
No. of Pages:
906
Publisher:
ASME Press
Publication date:
2011

This paper aims at advancing a heuristic algorithm for the yard crane deploying problem under stochastic environment. In this study, a dynamic integer programming for the problem is initially developed. Taking account of the stochastic and complex characteristic of this model, it is then converted into an equivalent expression, and a heuristic algorithm is supposed to solve this model. Finally, some numerical experiments are taken to illustrate the efficiency of this algorithm, and a plan of yard crane scheduling is also shown for instance.

Abstract
Key Words
1. Introduction
2. Literature Review
3. The Mathematical Model
4. The Heuristic Algorithm
5. Numerical Experiments
6 Conclusion
Acknowledgement
References
This content is only available via PDF.
Close Modal
This Feature Is Available To Subscribers Only

Sign In or Create an Account

Close Modal
Close Modal