Skip to Main Content
Skip Nav Destination
ASME Press Select Proceedings
International Conference on Advanced Computer Theory and Engineering, 4th (ICACTE 2011)
By
Yi Xie
Yi Xie
Search for other works by this author on:
ISBN:
9780791859933
No. of Pages:
840
Publisher:
ASME Press
Publication date:
2011

The production in steel plant is complex and special, there are many constraints and objectives to be considered in the problem of mid-term production planning, this paper developed a multi-objective and nonlinear model for this problem based on goal programming (GP) and constraint programming (CP), aiming at advancing the profit and productivity of the plant. For give a feasible optimized solution, it relaxed some hard constraints by GP, and did a piecewise linear approximation to the non-linear model with generate algorithm (GA) and linear programming (LP). To test the affectivity and flexibility, this paper did three groups experiments and showed that the method indeed could find the satisfactory solution in acceptable time.

Abstract
Keywords
1 Introduction
2. Problem Description
3. Model and Solving Method
4. Solution Strategy
5. Computation Results
6. Conclusion
7. Acknowledgment
8. References
This content is only available via PDF.
You do not currently have access to this chapter.
Close Modal

or Create an Account

Close Modal
Close Modal