Skip to Main Content
Skip Nav Destination
ASME Press Select Proceedings

International Conference on Mechanical Engineering and Technology (ICMET-London 2011)

Editor
Garry Lee
Garry Lee
Information Engineering Research Institute
Search for other works by this author on:
ISBN:
9780791859896
No. of Pages:
906
Publisher:
ASME Press
Publication date:
2011

The rod pump oil extraction is applied the most commonly machinery extraction method in the horizontal well. However, there is a big degree of tilt and the dog-leg, underground sucker rod string off-center wear accidents often occur, causes the sucker rod string to break away or the drill tubing breakage finally. This article based on the actual bore hole path establishment horizontal well sucker-rod string's three-dimensional model, carries on the transient state dynamics simulation analysis by using the ANSYS finite element software, and predict offcenter wear position of bar tube, through exerts the centralizer in the off-center wear region to optimize the pole combination, achieves the goal which reduce off-center wear of pole tube, Simultaneously established a set of numerical simulation method which is used for forecasting off-center wear position of the sucker rod and bar tube in horizontal well.

This content is only available via PDF.
You do not currently have access to this chapter.
Close Modal

or Create an Account

Close Modal
Close Modal