Skip to Main Content
Skip Nav Destination
ASME Press Select Proceedings
Geological Engineering: Proceedings of the 1st International Conference (ICGE 2007)
Editor
Baosong Ma
Baosong Ma
Search for other works by this author on:
ISBN:
9780791802922
No. of Pages:
1760
Publisher:
ASME Press
Publication date:
2009

Subway line deformation must be restricted to insure the safety during construction of heat pipe line over existing subway. Deformation analysis is an important content of monitoring the tunnel structure. The current understanding of the main tunnel deformation is Concentrated on the horizontal structure s, however, vertical deformation of the tunnel should be much more fragile. To study the affect of the construction of the heat pipe line on the tunnels of subway line 10, a large number of settlement points are placed on the tunnels surfaces. Through monitoring and analyzing the settlement and deformation of tunnels points following the construction and setting up monitoring and control network according to national standard, the affects of the heat pipe line construction is analyzed in details on the basis of rational design of deformation monitoring programs. The monitored results indicate that the construction of heat pipe line has a great influence on the tunnels deformation, settlement rate and cumulative settlement quantity. At last, modified grey model is proposed to predict the settlement quantity with credible results in this paper.

Abstract
Introduction
Monitoring Programs and Implementation
Analyses of Settlement and Deformation
Deformation Prediction
References
This content is only available via PDF.
You do not currently have access to this chapter.
Close Modal

or Create an Account

Close Modal
Close Modal