Skip to Main Content
Skip Nav Destination
ASME Press Select Proceedings
Geological Engineering: Proceedings of the 1st International Conference (ICGE 2007)Available to Purchase
Editor
Baosong Ma
Baosong Ma
Search for other works by this author on:
ISBN:
9780791802922
No. of Pages:
1760
Publisher:
ASME Press
Publication date:
2009

According to the grey system theory, which was pioneered by Chinese professor Deng Julong in 1982, the main theory and the building process of the GM (1, 1) model were introduced in this paper. Based on the long-term monitoring data of the 2nd Guangzhou western ring motorway project, the GM (1, 1) model was build for the forecasting of the subgrade settlements with the help of the computer program MATLAB. By comparing the forecasting results of the GM (1, 1) model with the ones gotten by the hyperbola method, it could be found that the forecasting accuracy of the GM (1, 1) model could be kept in a high level and its applicability is much wider than the hyperbola method. It could be considered that the GM (1, 1) model is an effective settlement forecasting method.

Abstract
Introduction
Settlement Forecasting Example
Conclusion
References
This content is only available via PDF.
You do not currently have access to this chapter.

or Create an Account

Close Modal
Close Modal