Skip to Main Content
Skip Nav Destination
ASME Press Select Proceedings

Intelligent Engineering Systems Through Artificial Neural Networks, Volume 17

Editor
C. H. Dagli
C. H. Dagli
Search for other works by this author on:
ISBN-10:
0791802655
No. of Pages:
650
Publisher:
ASME Press
Publication date:
2007

A deterministic multi objective single machine scheduling problem with non-zero ready times is solved in this paper. The objective is to obtain a sequence of jobs that will minimize total tardiness and number of tardy jobs. There is no preference made among objectives. A set of non-dominated solutions are provided at the end for the decision maker to make the final decision. A mixer approach, which is a new approach to deal with multi-objective genetic algorithms, is used to obtain high-quality solutions considering both objectives. The developed approach has two main components: 1) Individual Population Evolvers (IPEs), and 2) Population...

Abstract
1. Introduction
2. Literature Review
3. The Proposed Mixer Approach
4. Genetic Operators
5. Experimentation and Results
6. Conclusions
References
This content is only available via PDF.
You do not currently have access to this chapter.
Close Modal

or Create an Account

Close Modal
Close Modal