Skip to Main Content
Skip Nav Destination
ASME Press Select Proceedings
Proceedings of the Eighth International Conference on Probabilistic Safety Assessment & Management (PSAM)
Editor
Michael G. Stamatelatos
Michael G. Stamatelatos
Search for other works by this author on:
Harold S. Blackman
Harold S. Blackman
Search for other works by this author on:
ISBN-10:
0791802442
No. of Pages:
2576
Publisher:
ASME Press
Publication date:
2006

The biggest fear of the hazard analyst is the loss of data in the middle of the design jungle. When project schedules are demanding and design is changing rapidly it is essential that the hazard analysis data be tracked and kept current in order to provide the required project design, development, and regulatory support. Being able to identify the current information, as well as the past archived information, as the design progresses and to be able to show how the project is designing in safety through modifications based on hazard analysis results is imperative.

At the DOE Hanford site in Washington State, Flour Hanford Inc is in the process of the removal and disposition of sludge from the 100 Area K Basins. The K Basins were used to store spent fuel from the operating reactors at the Hanford Site. The sludge is a by-product from the corrosion of the fuel and fuel storage canisters. The sludge removal project has been very dynamic involving the design, procurement and, more recently, the operation of processes at two basins, K East and K West. The project has an ambitious schedule with a large number of changes to design concepts.

In order to support the complex K Basins project a technique to track the status of the hazard analysis data was developed. This paper will identify the most important elements of the tracking system and how it was used to assist the project in ensuring that current design data was reflected in a specific version of the hazard analysis and to show how the project was keeping up with the design and ensuring compliance with the requirements to design in safety.

While the specifics of the data tracking strategy for the K Basins sludge removal project will be described in the paper, the general concepts of the strategy are applicable to similar projects requiring iteration of hazard analysis and design.

Summary/Abstract
Introduction
Example Analysis
Tricks for Tracking
Acknowledgments
References
This content is only available via PDF.
You do not currently have access to this chapter.
Close Modal

or Create an Account

Close Modal
Close Modal