ASTM Selected Technical Papers
Masonry: Components to Assemblages
By
JH Matthys
JH Matthys
1
Professor Civil Engineering Director Construction Research Center
?
University of Texas
at
Arlington Symposium Chairman
Search for other works by this author on:
ISBN-10:
0-8031-1453-2
ISBN:
978-0-8031-1453-1
No. of Pages:
443
Publisher:
ASTM International
Publication date:
1990

ASTM C270 “Mortar For Unit Masonry” lists compressive strength requirements under the property specification based on 5.08 cm. cubes. ASTM C780 “Preconstruction and Construction Evaluation of Mortars For Plain and Reinforced Unit Masonry” allows the use of 5.08 cm. × 10.16 cm. cylinders, 7.62 cm. × 15.24 cm. cylinders or 5.08 cm. cubes in determination of mortar compressive strength. The cylinder compressive strength may be considered to be equal to 85% of the cube compressive strength. An experimental investigation of the compressive strength relationship between 5.08 cm. cubes and 7.62 cm. × 15.24 cm. cylinders for (1) laboratory mortars cured in a moist room, (2) job site mortars cured in laboratory air, and (3) job site mortars cured outside has been conducted. The data includes portland cement lime mortar, masonry cemment mortar, and ready mix mortar.

1.
Standard Specification For Mortars For Unit Masonry
,” ASTM C270-86a,
American Society For Testing and Materials
,
Philadelphia, PA 19103
.
2.
Standard Test Method For Compressive Strength of Hydraulic Cement Mortar (using 2″ or 50mm. cube specimens)
,” ASTM C109-86,
American Society For Testing and Materials
,
Philadelphia, PA 19103
.
3.
Method For Preconstruction and Construction Evaluation of Mortars For Plain and Reinforced Unit Masonry
,” ASTM C780-87,
American Society For Testing and Materials
,
Philadelphia, PA 19103
.
4.
Standard Specification for Aggregate For Masonry Mortar
.” ASTM C144-87,
American Society For Testing and Materials
,
Philadelphia, PA 19103
.
5.
Data from National Lime Association, Gifford-Hill & Company, Inc., Holmes Testing Laboratory and Construction Research center.