At approximately 11:40 AM on May 9, 2007, Iatan Unit 1 experienced a catastrophic rupture of a 4 inch superheater (SH) attemperator spray line after nearly 27 years of commercial operations. At the time of the rupture, several plant personnel were in the immediate vicinity performing maintenance on a plugged coal feeder. Plant operators immediately initiated a plant shutdown. This incident resulted in two fatalities and one serious injury. Subsequent examination of the ruptured line indicated significant pipe wall thinning had occurred, leading to the sudden failure of the pipe pressure boundary and the pipe rupture event. The preliminary evaluation of the failed pipe determined that flow accelerated corrosion (FAC) was the likely failure mechanism. To prevent this and similar events, the PII team recommends the following actions be taken to identify other potential areas which may have similar characteristics to the failed pipe: 1. Employ the EPRI method CHECKWORKS (as has been implemented) to identify the susceptible areas. 2. Supplement the EPRI model with connected flow modeling techniques to identify additional inspection areas. 3. If the measured wall thickness is less than 30% of the minimum allowable wall thickness, replace or repair the pipe immediately. 4. If the measured wall thickness is less than the minimum allowable wall thickness (as specified by the B31.1 code), but no less than 30% of the minimum allowable, perform a safety risk assessment. If the risk is determined acceptable, replace or repair the pipe at the next planned plant outage with temporary compensatory actions (such as caution tags, leak flow blockage facilities, etc.). 5. Identify and replace all throttled gate valves and replace them as soon as practical. Until these valves are replaced, utilize NDE techniques to monitor the pipe wall thinning downstream of the valves and replace pipe based on the above criteria in 3 and 4.
Skip Nav Destination
ASME 2010 Pressure Vessels and Piping Division/K-PVP Conference
July 18–22, 2010
Bellevue, Washington, USA
Conference Sponsors:
- Pressure Vessels and Piping Division
ISBN:
978-0-7918-49255
PROCEEDINGS PAPER
Iatan Desuperheater Pipe Failure Caused by FAC: September 28, 2007
Chong Chiu,
Chong Chiu
Performance Improvement International, Oceanside, CA
Search for other works by this author on:
Lance B. Gockel
Lance B. Gockel
Kansas City Power & Light, Kansas City, MO
Search for other works by this author on:
Chong Chiu
Performance Improvement International, Oceanside, CA
Lance B. Gockel
Kansas City Power & Light, Kansas City, MO
Paper No:
PVP2010-26066, pp. 601-606; 6 pages
Published Online:
January 10, 2011
Citation
Chiu, C, & Gockel, LB. "Iatan Desuperheater Pipe Failure Caused by FAC: September 28, 2007." Proceedings of the ASME 2010 Pressure Vessels and Piping Division/K-PVP Conference. ASME 2010 Pressure Vessels and Piping Conference: Volume 6, Parts A and B. Bellevue, Washington, USA. July 18–22, 2010. pp. 601-606. ASME. https://doi.org/10.1115/PVP2010-26066
Download citation file:
21
Views
Related Proceedings Papers
Related Articles
Reliability of Steam Generator Tubes With Axial Cracks
J. Pressure Vessel Technol (November,1996)
The Impact of Probabilistic Modeling in Life-Cycle Management of Nuclear Piping Systems
J. Eng. Gas Turbines Power (January,2011)
Failure Investigation on Reheater Pendent Tubes Due to External Scale Exfoliation and Internal Scale Formation
J. Pressure Vessel Technol (December,2011)
Related Chapters
Section XI: Rules for Inservice Inspection and Tests of Nuclear Power Plant Components
Online Companion Guide to the ASME Boiler & Pressure Vessel Codes
Overview of Section XI Stipulations
Online Companion Guide to the ASME Boiler & Pressure Vessel Codes
Modeling of SAMG Operator Actions in Level 2 PSA (PSAM-0164)
Proceedings of the Eighth International Conference on Probabilistic Safety Assessment & Management (PSAM)