A high energy piping (HEP) asset integrity management program is important for the safety of power plant personnel and reliability of the generating units. Hot reheat (HRH) longitudinal seam weld failures have resulted in serious injuries, fatalities, extensive damage of components, and significant lost generation. The HRH piping system is one of the most critical HEP systems. Since high temperature creep is a typical failure mechanism for longitudinal seam welds, the probability of failure increases with unit operating hours. This paper concludes that some seam welded spools in this specific HRH piping system are more likely to fail earlier than other spools, depending on their actual wall thicknesses and operating temperatures. In this case study, the HRH piping system has operated over 200,000 hours and experienced about 400 starts since commercial operation. There are two separate HRH lines, Lines A and B, for this piping system. The 36-inch OD pipe has a specified minimum wall thickness (MWT) of 1.984 inches. Pipe wall thicknesses were measured in 57 spools. The measured spool MWT values varied from 1.981 to 2.122 inches. On average, Line A operated about 8°F higher than Line B. A comparative risk assessment was performed using the estimated average temperatures and pressures throughout the life of this HRH piping system. Data associated with the reported failures or near failures of seam welded Grade 22 piping systems were plotted as log σHoop versus the Larson Miller Parameter (LMP). The range of log σHoop and LMP values for this unique piping system was also plotted, based on the average operating pressure and the range in the average operating temperatures and the measured spool MWT values. The Line A (with a higher average operating temperature) seamed spool having the lowest measured MWT fell slightly above the threshold line of reported seam weld pipe failures. The Line B (with a lower average operating temperature) seamed spool having the lowest MWT is about 10 operating years from reaching the threshold of reported seam weld pipe failures. The Line A seamed spool having the highest measured MWT is about 8 operating years from reaching the threshold of reported seam weld pipe failures. The Line B seamed spool having the highest measured MWT is more than 18 operating years from reaching the threshold of historical seam weld pipe failures.
Skip Nav Destination
ASME 2010 Pressure Vessels and Piping Division/K-PVP Conference
July 18–22, 2010
Bellevue, Washington, USA
Conference Sponsors:
- Pressure Vessels and Piping Division
ISBN:
978-0-7918-49255
PROCEEDINGS PAPER
Fitness-for-Service of Longitudinal Seam Welds
Dwight D. Agan,
Dwight D. Agan
Intertek APTECH, Sunnyvale, CA
Search for other works by this author on:
Marvin J. Cohn,
Marvin J. Cohn
Intertek APTECH, Sunnyvale, CA
Search for other works by this author on:
Henry D. Vaillancourt
Henry D. Vaillancourt
Intertek APTECH, Sunnyvale, CA
Search for other works by this author on:
Dwight D. Agan
Intertek APTECH, Sunnyvale, CA
Marvin J. Cohn
Intertek APTECH, Sunnyvale, CA
Henry D. Vaillancourt
Intertek APTECH, Sunnyvale, CA
Paper No:
PVP2010-25108, pp. 529-539; 11 pages
Published Online:
January 10, 2011
Citation
Agan, DD, Cohn, MJ, & Vaillancourt, HD. "Fitness-for-Service of Longitudinal Seam Welds." Proceedings of the ASME 2010 Pressure Vessels and Piping Division/K-PVP Conference. ASME 2010 Pressure Vessels and Piping Conference: Volume 6, Parts A and B. Bellevue, Washington, USA. July 18–22, 2010. pp. 529-539. ASME. https://doi.org/10.1115/PVP2010-25108
Download citation file:
16
Views
Related Proceedings Papers
Related Articles
Research and Application of Risk Assessment Methodology for Power Station Boiler Superheaters
J. Pressure Vessel Technol (August,2011)
Performance of Dissimilar Welds in Service
J. Pressure Vessel Technol (August,1985)
Deterministic and Probabilistic Fracture Mechanics Analysis for Structural Integrity Assessment of Pressurized Water Reactor Pressure Vessel
J. Pressure Vessel Technol (June,2016)
Related Chapters
Dynamic Behavior of Pumping Systems
Pipeline Pumping and Compression Systems: A Practical Approach
Defect Assessment
Pipeline Integrity Assurance: A Practical Approach
Integrity Management of Critical Systems Introduction
Asset Integrity Management of Critical Infrastructure