The commercial nuclear power industry has proposed several mitigation techniques to address safety concerns due to primary water stress corrosion cracking (PWSCC) in nickel-based dissimilar metal (DM) welds (specifically Alloy 82/182 welds) in pressurized water reactors (PWRs). Since many of these welds reside in primary piping systems that have been approved for Leak-Before-Break (LBB), the mitigation strategies chosen must ensure that these systems still satisfy the LBB criteria. Mechanical Stress Improvement Process (MSIP), Full and Optimized Structural Weld Overlay (FSWOL, OWOL), and Inlay and Onlay cladding are examples of the currently proposed mitigation methods. This paper focuses on an evaluation of the inlay process for the mitigation of PWSCC since it may be the technique of choice for the large-diameter reactor coolant nozzles. Currently the ASME Section XI code is developing Code Case N-766 ‘Nickel Alloy Reactor Coolant Inlay and Cladding for Repair or Mitigation of PWR Full Penetration Circumferential Nickel Alloy Welds in Class 1 Items.’ This code case is documenting the procedures for applying inlay welds. The residual stresses caused by the inlay process were used to model the natural crack growth through the inlay in this paper. The inlay residual stresses and modeling methods are presented in a companion paper. Since the PWSCC crack growth rate is much slower in the inlay material (Alloy 52) compared with the Alloy 82/182 weld metal, the crack growth shape retains a ‘bubble’ appearance. This shape is a challenge to model within the framework of advanced finite element based natural crack growth methods. This paper focuses on the crack growth modeling challenges, the actual growth shapes for different weld repair and inlays processes, and finally compares crack growth rates to those made using a simple crack growth shape.
Skip Nav Destination
ASME 2010 Pressure Vessels and Piping Division/K-PVP Conference
July 18–22, 2010
Bellevue, Washington, USA
Conference Sponsors:
- Pressure Vessels and Piping Division
ISBN:
978-0-7918-49255
PROCEEDINGS PAPER
Natural PWSCC Crack Growth in Dissimilar Metal Welds With Inlay
F. W. Brust,
F. W. Brust
Engineering Mechanics Corporation of Columbus, Columbus, OH
Search for other works by this author on:
D.-J. Shim,
D.-J. Shim
Engineering Mechanics Corporation of Columbus, Columbus, OH
Search for other works by this author on:
E. Punch,
E. Punch
Engineering Mechanics Corporation of Columbus, Columbus, OH
Search for other works by this author on:
S. Kalyanam,
S. Kalyanam
Engineering Mechanics Corporation of Columbus, Columbus, OH
Search for other works by this author on:
D. Rudland
D. Rudland
U.S. Nuclear Regulatory Commission, Washington, DC
Search for other works by this author on:
F. W. Brust
Engineering Mechanics Corporation of Columbus, Columbus, OH
D.-J. Shim
Engineering Mechanics Corporation of Columbus, Columbus, OH
E. Punch
Engineering Mechanics Corporation of Columbus, Columbus, OH
S. Kalyanam
Engineering Mechanics Corporation of Columbus, Columbus, OH
D. Rudland
U.S. Nuclear Regulatory Commission, Washington, DC
Paper No:
PVP2010-26108, pp. 1531-1540; 10 pages
Published Online:
January 10, 2011
Citation
Brust, FW, Shim, D, Punch, E, Kalyanam, S, & Rudland, D. "Natural PWSCC Crack Growth in Dissimilar Metal Welds With Inlay." Proceedings of the ASME 2010 Pressure Vessels and Piping Division/K-PVP Conference. ASME 2010 Pressure Vessels and Piping Conference: Volume 6, Parts A and B. Bellevue, Washington, USA. July 18–22, 2010. pp. 1531-1540. ASME. https://doi.org/10.1115/PVP2010-26108
Download citation file:
8
Views
Related Proceedings Papers
Related Articles
Residual Stress Measurement in 304 Stainless Steel Weld Overlay Pipes
J. Eng. Mater. Technol (January,1996)
Improvement of Probabilistic Fracture Mechanics Analysis Code PASCAL-SP Regarding Stress Corrosion Cracking in Nickel Based Alloy Weld Joint of Piping System in Boiling Water Reactor
J. Pressure Vessel Technol (February,2022)
Residual Stresses and Distortion in Boiler Tube Panels With Welded Overlay Cladding
J. Pressure Vessel Technol (November,2004)
Related Chapters
Development of Nuclear Boiler and Pressure Vessels in Taiwan
Companion Guide to the ASME Boiler and Pressure Vessel Code, Volume 3, Third Edition
Section XI Flaw Acceptance Criteria and Evaluation Using Code Procedures
Companion Guide to the ASME Boiler & Pressure Vessel Codes, Volume 2, Sixth Edition
Iwe and Iwl
Companion Guide to the ASME Boiler and Pressure Vessel Code, Volume 2, Third Edition