In the paper, an overview of large-scale experiments performed on components of WWER primary circuits within several LBB projects conducted in the Czech Republic in years 1992 – 1994 is presented. The tested components were replicas of the real ones; they contained a through-wall crack and were loaded by pressure and bending moment in two stages, as appropriate according to the LBB methodology. All tested components exhibited stable behaviour under normal operating loading superposed with safe shutdown earthquake loading (NOC + SSE) applied during 1st stage of experiment. During 2nd stage of experiment, under loading by bending moment only, the models usually exhibited stable tearing of the crack, in some cases limit load (maximum force at loading controlled by displacement) was reached. In the paper, the experiments are briefly described, with presenting the main experimental and (in some cases) FE computational results.
Skip Nav Destination
ASME 2009 Pressure Vessels and Piping Conference
July 26–30, 2009
Prague, Czech Republic
Conference Sponsors:
- Pressure Vessels and Piping
ISBN:
978-0-7918-4366-6
PROCEEDINGS PAPER
Large-Scale Tests Performed in Support of LBB Projects Applied to WWER Type NPPs in the Czech Republic in Years 1992–1994
Dana Lauerova,
Dana Lauerova
Nuclear Research Institute Rez, plc., Rez, Czech Republic
Search for other works by this author on:
Jiri Palyza,
Jiri Palyza
Nuclear Research Institute Rez, plc., Rez, Czech Republic
Search for other works by this author on:
Jiri Zdarek
Jiri Zdarek
Nuclear Research Institute Rez, plc., Rez, Czech Republic
Search for other works by this author on:
Dana Lauerova
Nuclear Research Institute Rez, plc., Rez, Czech Republic
Jiri Palyza
Nuclear Research Institute Rez, plc., Rez, Czech Republic
Jiri Zdarek
Nuclear Research Institute Rez, plc., Rez, Czech Republic
Paper No:
PVP2009-77290, pp. 321-329; 9 pages
Published Online:
July 9, 2010
Citation
Lauerova, D, Palyza, J, & Zdarek, J. "Large-Scale Tests Performed in Support of LBB Projects Applied to WWER Type NPPs in the Czech Republic in Years 1992–1994." Proceedings of the ASME 2009 Pressure Vessels and Piping Conference. Volume 3: Design and Analysis. Prague, Czech Republic. July 26–30, 2009. pp. 321-329. ASME. https://doi.org/10.1115/PVP2009-77290
Download citation file:
8
Views
Related Proceedings Papers
Related Articles
Insights Gleaned From NRC-BNL Benchmark Evaluation of Seismic Analysis Methods for Non-Classically Damped Coupled Systems
J. Pressure Vessel Technol (February,2004)
Analysis of the Thermal Hydraulic Consequences Following Common Mode Pump Seizure in a Nuclear Power Plant
J. Pressure Vessel Technol (November,2002)
Modeling of Earthquake Motions for Seismic Design of Critical Facilities: Revision of Licensing Criteria of NPP
J. Pressure Vessel Technol (November,2006)
Related Chapters
Development of Nuclear Boiler and Pressure Vessels in Taiwan
Companion Guide to the ASME Boiler and Pressure Vessel Code, Volume 3, Third Edition
Use of PSA in Lisencing of EPR 1600 in Finland (PSAM-0160)
Proceedings of the Eighth International Conference on Probabilistic Safety Assessment & Management (PSAM)
Seismic Protection for Pressure Piping Systems
Continuing and Changing Priorities of the ASME Boiler & Pressure Vessel Codes and Standards