Closure head forging (SA508, Gr.3 Cl.1) integrated with flange for PWR reactor pressure vessel has been developed. This is intended to enhance structural integrity of closure head resulted in elimination of ISI, by eliminating weld joint between closure head and flange in the conventional design. Manufacturing procedures have been established so that homogeneity and isotropy of the material properties can be assured in the closure head forging integrated with flange. Acceptance tensile and impact test specimens are taken and tested regarding the closure head forging integrated with flange as very thick and complex forgings. This paper describes the manufacturing technologies and material properties of the closure head forging integrated with flange.
Skip Nav Destination
ASME/JSME 2004 Pressure Vessels and Piping Conference
July 25–29, 2004
San Diego, California, USA
Conference Sponsors:
- Pressure Vessels and Piping Division
ISBN:
0-7918-4685-7
PROCEEDINGS PAPER
Manufacturing and Properties of Closure Head Forging Integrated With Flange for PWR Reactor Pressure Vessel
Yoichi Koyama
Yoichi Koyama
Japan Steel Works, Ltd.
Search for other works by this author on:
Komei Suzuki
Japan Steel Works, Ltd.
Etsuo Murai
Japan Steel Work, Ltd.
Yasuhiko Tanaka
Japan Steel Works, Ltd.
Iku Kurihara
Japan Steel Works, Ltd.
Tomoharu Sasaki
Japan Steel Works, Ltd.
Yoichi Koyama
Japan Steel Works, Ltd.
Paper No:
PVP2004-3056, pp. 43-50; 8 pages
Published Online:
August 12, 2008
Citation
Suzuki, K, Murai, E, Tanaka, Y, Kurihara, I, Sasaki, T, & Koyama, Y. "Manufacturing and Properties of Closure Head Forging Integrated With Flange for PWR Reactor Pressure Vessel." Proceedings of the ASME/JSME 2004 Pressure Vessels and Piping Conference. Storage Tank Integrity and Materials Evaluation. San Diego, California, USA. July 25–29, 2004. pp. 43-50. ASME. https://doi.org/10.1115/PVP2004-3056
Download citation file:
11
Views
Related Proceedings Papers
Related Articles
Ring Forming: An Upper Bound Approach. Part 3: Constrained Forging and Deep Drawing Applications
J. Eng. Ind (August,1982)
Heavy Duty
Mechanical Engineering (April,2012)
Large-Forging-Press Operations and Production Problems
Trans. ASME (November,1953)
Related Chapters
Subsection NG—Core Support Structures
Companion Guide to the ASME Boiler & Pressure Vessel Codes, Volume 1 Sixth Edition
Subsection NG — Core Support Structures
Companion Guide to the ASME Boiler and Pressure Vessel Code, Volume 1, Third Edition
Subsection NG—Core Support Structures
Companion Guide to the ASME Boiler & Pressure Vessel Code, Volume 1, Second Edition