Appendix J of 10 CFR 50, “Primary Reactor Containment Leakage Testing for Water-Cooled Power Reactors,” sets the testing requirements for preoperational and periodic verification of the leak-tight integrity of the primary reactor containment, including systems and components which penetrate containment of light water-cooled power reactors, and establishes the acceptance criteria for such tests. The purposes of the tests are to assure that leakage through the primary reactor containment and systems and components penetrating primary containment would not exceed allowable leakage rate values as specified in the plants’ technical specifications. The current Appendix J requirements provide two options for performing the tests. Option A (fully deterministic) requires that after the preoperational leakage rate tests, a set of three integrated leak rate tests (ILRT — termed as Type A tests) shall be performed, at approximately equal intervals during each 10-year service period. Option B does not provide a quantitative requirement for scheduling the periodic Type A tests. However, NEI 94-01, “Industry Guideline for Implementing Performance-Based Option of 10 CFR Part 50, Appendix J,” and NRC Regulatory Guide (RG). The containment is a vital engineering safety feature of a nuclear power plant. It encloses the entire reactor and reactor coolant system and serves as a final barrier against the release of radioactive fission products to the environment under various accident conditions. Containment design is based on pressure and temperature loadings associated with a loss-of-coolant-accident resulting from a double-ended rupture of the largest pipe in the reactor coolant system. Recently, it has been reported that in certain 1.163, “Performance-Based Containment Leak Test Program,” provide guidelines for determining the frequencies of preoperational and periodic leak rate tests using a performance based approach. The Option B requirements and NEI 94-01 guidance are based on NUREG-1493, “Performance Based Containment Leak-Test Program.” Based on the information provided by the operating data and their risk significance, the study calculated the change in risk (in person-rem) to public for the 15 alternatives considered in the study. However, recognizing the non-sensitivity of risk to change in Type A leak rate testing frequencies, as depicted in NUREG-1493, a number of licensees are proposing changes to their Type A test frequencies using NRC risk-informed guidance in RG 1.174, “An Approach for Using Probabilistic Risk Assessment in Risk-Informed Decisions on Plant-Specific Changes to the Licensing Basis.” The paper discusses certain key deterministic aspects of the risk-informed decision for the plant-specific changes in the ILRT frequencies.
Skip Nav Destination
ASME 2002 Pressure Vessels and Piping Conference
August 5–9, 2002
Vancouver, BC, Canada
Conference Sponsors:
- Pressure Vessels and Piping Division
ISBN:
0-7918-4658-X
PROCEEDINGS PAPER
Integrated Leak Rate Testing of Containments: A Regulatory Perspective
Hans Ashar,
Hans Ashar
U.S. Nuclear Regulatory Commission, Washington, DC
Search for other works by this author on:
Eugene Imbro,
Eugene Imbro
U.S. Nuclear Regulatory Commission, Washington, DC
Search for other works by this author on:
David Terao
David Terao
U.S. Nuclear Regulatory Commission, Washington, DC
Search for other works by this author on:
Hans Ashar
U.S. Nuclear Regulatory Commission, Washington, DC
Eugene Imbro
U.S. Nuclear Regulatory Commission, Washington, DC
David Terao
U.S. Nuclear Regulatory Commission, Washington, DC
Paper No:
PVP2002-1520, pp. 83-87; 5 pages
Published Online:
August 14, 2008
Citation
Ashar, H, Imbro, E, & Terao, D. "Integrated Leak Rate Testing of Containments: A Regulatory Perspective." Proceedings of the ASME 2002 Pressure Vessels and Piping Conference. Piping and Component Analysis and Diagnosis. Vancouver, BC, Canada. August 5–9, 2002. pp. 83-87. ASME. https://doi.org/10.1115/PVP2002-1520
Download citation file:
16
Views
Related Proceedings Papers
The Benefits of Using a Risk-Informed Approach to Resolving GSI-191
ICONE20-POWER2012
Related Articles
VVER 1000 Severe Accident Analyses Using MELCOR Code
ASME J of Nuclear Rad Sci (July,2019)
Analyses of Feedwater Trip With SBO Sequence of VVER1000 Reactor
ASME J of Nuclear Rad Sci (October,2016)
Experimental Demonstration of Safety of AHWR during Stagnation Channel Break Condition in an Integral Test Loop
ASME J of Nuclear Rad Sci (April,2018)
Related Chapters
PSA Level 2 — NPP Ringhals 2 (PSAM-0156)
Proceedings of the Eighth International Conference on Probabilistic Safety Assessment & Management (PSAM)
Insights and Results of the Shutdown PSA for a German SWR 69 Type Reactor (PSAM-0028)
Proceedings of the Eighth International Conference on Probabilistic Safety Assessment & Management (PSAM)
Use of PSA in Lisencing of EPR 1600 in Finland (PSAM-0160)
Proceedings of the Eighth International Conference on Probabilistic Safety Assessment & Management (PSAM)