Hydrogen cooled generators need to undergo carbon dioxide (CO2) purging before being placed into service and when taken offline. This process typically takes 4 to 12 hours, and can take as long as 36 hours in extreme cases, to fully and safely purge a generator. Reducing the volume of hydrogen gas in these generators is essential for reducing the risks of explosions. If these purge times could be shortened, improvements in safety, shorter outages, and increased production could be realized. This paper describes plant testing of a CO2 Fast Degas purging system for hydrogen cooled generators. Results from eight test runs at two different plants are presented in tabular and graphical form. Mean reduction from pure hydrogen to less than 4% hydrogen was 39.8 minutes, while maintaining CO2 temperatures above 80°F (27°C). This eliminates the possibility of CO2 freeze up, and reduces the stress on the piping and the detrimental effects on the generator from extreme temperature swings that occur when CO2 is de-pressurized. These rapid purge rates were accomplished while maintaining the generator pressure within a set range. In order to achieve the minimum purge time, it is critical that mixing of the two gases be minimized during the purge operation. By utilizing the slope of the graphs provided, the system was optimized to minimize purge times to reach safe levels. Tests were performed on both purging operations, replacing hydrogen with CO2 and replacing air with CO2. Samples to analyze the generator gas purity were taken from the vent line using multiple thermal conductivity purity instruments to assure accurate results. The system was tested in both automatic and semi-automatic modes of operation. The fast degas system was found to significantly reduce generator purge times, reducing down time, and improve operator efficiency, positively affecting the overall safety profile of the plant.
Skip Nav Destination
ASME 2016 Power Conference collocated with the ASME 2016 10th International Conference on Energy Sustainability and the ASME 2016 14th International Conference on Fuel Cell Science, Engineering and Technology
June 26–30, 2016
Charlotte, North Carolina, USA
Conference Sponsors:
- Power Division
- Advanced Energy Systems Division
- Solar Energy Division
- Nuclear Engineering Division
ISBN:
978-0-7918-5021-3
PROCEEDINGS PAPER
Rapid H2 Purge With CO2 for Safer Plant Operations: Test Run Results
Larry Morris,
Larry Morris
East Kentucky Power Cooperative, Maysville, KY
Search for other works by this author on:
John McPhearson
John McPhearson
Lectrodryer, LLC, Richmond, KY
Search for other works by this author on:
Ted Warren
Lectrodryer, LLC, Richmond, KY
Larry Morris
East Kentucky Power Cooperative, Maysville, KY
John McPhearson
Lectrodryer, LLC, Richmond, KY
Paper No:
POWER2016-59257, V001T09A005; 5 pages
Published Online:
November 1, 2016
Citation
Warren, T, Morris, L, & McPhearson, J. "Rapid H2 Purge With CO2 for Safer Plant Operations: Test Run Results." Proceedings of the ASME 2016 Power Conference collocated with the ASME 2016 10th International Conference on Energy Sustainability and the ASME 2016 14th International Conference on Fuel Cell Science, Engineering and Technology. ASME 2016 Power Conference. Charlotte, North Carolina, USA. June 26–30, 2016. V001T09A005. ASME. https://doi.org/10.1115/POWER2016-59257
Download citation file:
26
Views
Related Proceedings Papers
Related Articles
Computational Fluid Dynamics Analysis and Structural Safety Assessment of a Mitigation Device to Minimize Consequence of a Containment Bypass Nuclear Accident
J. Pressure Vessel Technol (April,2021)
Characterization of Crankcase Ventilation Gas on Stationary Natural Gas Engines
J. Eng. Gas Turbines Power (January,0001)
Measurements of the Heat Conductivity of Nitrogen–Carbon Dioxide Mixtures
Trans. ASME (July,1951)
Related Chapters
Thermodynamic Performance
Closed-Cycle Gas Turbines: Operating Experience and Future Potential
Combined Cycle Power Plant
Energy and Power Generation Handbook: Established and Emerging Technologies
Pressure Testing
Power Piping