One major type of heat exchanger in geothermal power-plants acts to condense an organic vapor driving the generating turbines. Routine inspection carried out at such a plant in the spring of 2008 detected several leaking tubes in one of the condensers. The condenser consists of 11 banks, each with 284 tubes. The tubes in this condenser are 1″ in diameter and 18m in length. A sample of tubes was investigated by a metallurgical laboratory which determined that the failure mechanism was corrosion. This was eventually traced to a faulty maintenance procedure which left water traces after pressure hydro testing. Several NDT methods were considered in order to screen the tubes for leaks, so the unit could be brought up to standard performance levels. Eventually AcousticEye’s APR equipment was selected, based on the very short cycle time it offered, which could dramatically shorten plant downtime. After an initial feasibility test of one of the tube banks, the remaining 2840 tubes were inspected in 2 days. Four percent of the tubes were found either leaking or deteriorated above a predefined maximum acceptable damage level (pinholes and tube wall thickness reduction) and plugged. Benefits were prevention of a continued loss of 70 Kg/day of organic fluid (which is not only wasteful but also infringes on environmental legislation) and an increase of 1.5% in plant performance. Based on this experience, the operator decided to adopt APR based inspection as a standard procedure in its plants.
Skip Nav Destination
ASME 2010 Power Conference
July 13–15, 2010
Chicago, Illinois, USA
Conference Sponsors:
- Power Division
ISBN:
978-0-7918-4935-4
PROCEEDINGS PAPER
Applying Acoustic Pulse Reflectometry in a Geothermal Energy Plant: A Case Study Available to Purchase
Daniel Bobrow,
Daniel Bobrow
AcousticEye Ltd., Tel Aviv, Israel
Search for other works by this author on:
Tal Pechter
Tal Pechter
AcousticEye Ltd., Tel Aviv, Israel
Search for other works by this author on:
Noam Amir
AcousticEye Ltd., Tel Aviv, Israel
Daniel Bobrow
AcousticEye Ltd., Tel Aviv, Israel
Tal Pechter
AcousticEye Ltd., Tel Aviv, Israel
Paper No:
POWER2010-27207, pp. 431-434; 4 pages
Published Online:
December 24, 2010
Citation
Amir, N, Bobrow, D, & Pechter, T. "Applying Acoustic Pulse Reflectometry in a Geothermal Energy Plant: A Case Study." Proceedings of the ASME 2010 Power Conference. ASME 2010 Power Conference. Chicago, Illinois, USA. July 13–15, 2010. pp. 431-434. ASME. https://doi.org/10.1115/POWER2010-27207
Download citation file:
9
Views
Related Proceedings Papers
Related Articles
The Performance of the Kalina Cycle System 11(KCS-11) With Low-Temperature Heat Sources
J. Energy Resour. Technol (September,2007)
Pressure Testing Feedwater Heaters and Power Plant Auxiliary Heat Exchangers
J. Pressure Vessel Technol (October,2011)
Experimental Testing of Gerotor and Scroll Expanders Used in, and Energetic and Exergetic Modeling of, an Organic Rankine Cycle
J. Energy Resour. Technol (March,2009)
Related Chapters
Iwe and Iwl
Companion Guide to the ASME Boiler and Pressure Vessel Code, Volume 2, Third Edition
Threshold Functions
Closed-Cycle Gas Turbines: Operating Experience and Future Potential
Engineering and Physical Modeling of Power Plant Cooling Systems
Thermal Power Plant Cooling: Context and Engineering