A station uprate provides an economical opportunity to improve the generation capacity of a power plant if all the major system components are able to handle the effects of increased generation. The magnitude of uprate from increased steam generation will be limited by the maximum capacity of the weakest link in the cycle, which for many plants is the condenser. The condensers on many units are already pushed to their limit. This is especially true if a cooling tower is employed, where the condenser inlet cooling water temperatures are high on high wet-bulb temperature days. This condition forces many units to throttle down load to prevent excursions above the backpressure limits on their turbines. For condensers limited by the present duty, however, the options have been historically limited to rebundling the whole condenser with a larger surface area design and perhaps changing the tube material to a material with a higher heat transfer coefficient. Recently, a very low cost option has been demonstrated that should be considered by any plant looking to increase condenser duty or prevent station power reductions. Advances in the proper management of steam, condensate and noncondensable flows have permitted an upgrade for almost all vintage condensers, unlocking inactive surface area without a bundle replacement or complete redesign. This paper reports the results of a condenser retrofit effort, with emphasis on an upgrade applied to a load limited condenser concurrent with a major reduction in its operating backpressure. The performance of the condenser is presented before and after the upgrade showing significant backpressure reduction and heat transfer improvement accompanied by exceptional condensate chemistry results. It will be shown that 30% of the effective condenser surface area (or similarly, an additional 30% average heat transfer coefficient) was unlocked by activating the previously idle surface area.
Skip Nav Destination
ASME 2010 Power Conference
July 13–15, 2010
Chicago, Illinois, USA
Conference Sponsors:
- Power Division
ISBN:
978-0-7918-4935-4
PROCEEDINGS PAPER
Increasing Condenser Capacity Without Adding Tubes to Support a Station Uprate
Warren C. Welch, III,
Warren C. Welch, III
Intek, Inc., Westerville, OH
Search for other works by this author on:
Timothy J. Harpster,
Timothy J. Harpster
Intek, Inc., Westerville, OH
Search for other works by this author on:
Joseph W. Harpster
Joseph W. Harpster
Intek, Inc., Westerville, OH
Search for other works by this author on:
Warren C. Welch, III
Intek, Inc., Westerville, OH
Timothy J. Harpster
Intek, Inc., Westerville, OH
Joseph W. Harpster
Intek, Inc., Westerville, OH
Paper No:
POWER2010-27234, pp. 181-191; 11 pages
Published Online:
December 24, 2010
Citation
Welch, WC, III, Harpster, TJ, & Harpster, JW. "Increasing Condenser Capacity Without Adding Tubes to Support a Station Uprate." Proceedings of the ASME 2010 Power Conference. ASME 2010 Power Conference. Chicago, Illinois, USA. July 13–15, 2010. pp. 181-191. ASME. https://doi.org/10.1115/POWER2010-27234
Download citation file:
11
Views
Related Proceedings Papers
Related Articles
Feasibility Study of an Innovative Dry-Cooling System With Phase-Change Material Storage for Concentrated Solar Power Multi-MW Size Power Plant
J. Sol. Energy Eng (August,2011)
Last Stage Performance Considerations in Low-Pressure Turbines of Power Plants: A Case Study
J. Eng. Gas Turbines Power (March,2008)
Evaporation-Cooling for Pure-Water Systems for Turbine-Generator Gas and Oil Coolers
Trans. ASME (October,1947)
Related Chapters
Combined Cycle Power Plant
Energy and Power Generation Handbook: Established and Emerging Technologies
Lay-Up and Start-Up Practices
Consensus on Operating Practices for Control of Water and Steam Chemistry in Combined Cycle and Cogeneration
Outlook
Closed-Cycle Gas Turbines: Operating Experience and Future Potential