Power plants originally designed to be decommissioned at 20–30 years are extending their service life by removing/replacing major power plant components. This requirement is contrary to the original floor and workspace designs engineered for power plants. Feedwater heaters, casks, heat exchangers, and other very large (50′ ±) and heavy (20–100 Ton) components can overcome floor and space restrictions by using a combination of air casters and cranes. This proven methodology saves in excess of 75% of the cost of a standard crane-only operation and significantly reduces the possibility of permanent floor damage. Air caster transport systems are low profile and easily insert under industrial heaters, exchangers, transformers, etc. The casters raise components and carry them across the floor, spreading the multi-ton weight across the surface area without damage to the floor or component. Air casters are frictionless even with the heaviest loads, and significantly reduce ergonomic risk while also providing the benefit of requiring a reduced workforce to move the component across the floor. Controlled drive systems allow a single operator to easily move components omni-directionally without wheels or rails, and into position within .5″ (13mm) accuracy. The air caster methodology for moving heavy loads was referenced as proven effective in existing nuclear plants in the 2004 ICONE paper presented by Tokyo Power. Air casters, often coupled with cranes, significantly lower material handling costs associated with new installation and repair/refurbishment of components up to and over 5000 tons. Air casters operate on normal compressed air and have very few moving parts, resulting in low ongoing maintenance costs.
Skip Nav Destination
ASME 2009 Power Conference
July 21–23, 2009
Albuquerque, New Mexico, USA
Conference Sponsors:
- Power Division
ISBN:
978-0-7918-4350-5
PROCEEDINGS PAPER
Best Practices: Multi-Ton Component Removal/Replacement Utilizing Air Casters
John Massenburg,
John Massenburg
AeroGo, Inc., Seattle, WA
Search for other works by this author on:
Terry Pitsch
Terry Pitsch
AeroGo, Inc., Seattle, WA
Search for other works by this author on:
Jesse Farmer
AeroGo, Inc., Seattle, WA
John Massenburg
AeroGo, Inc., Seattle, WA
Terry Pitsch
AeroGo, Inc., Seattle, WA
Paper No:
POWER2009-81184, pp. 675-683; 9 pages
Published Online:
September 22, 2010
Citation
Farmer, J, Massenburg, J, & Pitsch, T. "Best Practices: Multi-Ton Component Removal/Replacement Utilizing Air Casters." Proceedings of the ASME 2009 Power Conference. ASME 2009 Power Conference. Albuquerque, New Mexico, USA. July 21–23, 2009. pp. 675-683. ASME. https://doi.org/10.1115/POWER2009-81184
Download citation file:
11
Views
Related Proceedings Papers
Related Articles
The Effects of Oblique Running and Ideal Motion on Stress Analysis of Bridge Crane Wheels
J. Mech. Des (November,2006)
Nonlinear Seismic Responses of Container Cranes Including the Contact Problem Between Wheels and Rails
J. Pressure Vessel Technol (February,2004)
The Application of System CFD to the Design and Optimization of High-Temperature Gas-Cooled Nuclear Power Plants
J. Eng. Gas Turbines Power (May,2008)
Related Chapters
Use of PSA in Lisencing of EPR 1600 in Finland (PSAM-0160)
Proceedings of the Eighth International Conference on Probabilistic Safety Assessment & Management (PSAM)
Introduction
Managing Risks in Design & Construction Projects
Reasons for Lay-Up
Consensus for the Lay-up of Boilers, Turbines, Turbine Condensors, and Auxiliary Equipment (CRTD-66)