Rapid development in computers has led to significant advancement in simulation technology. The analysis tools such as CFD and FEA are now household tools used for improving plant operations, building reliable equipment with enhanced safety features with an eye on improving and optimizing performance. In this paper a few case studies are selectively presented to demonstrate the value of these tools to the customer — improved efficiency, reduced schedule times and cost. These examples are chosen to show how these technologies are used to identify and mitigate any safety and operational risks associated with plant design and improve the design over the projects life cycle. The first example considers a design and operation improvement in a Heat recovery Steam generator (HRSG). To reduce material and equipment costs, it is very easy to design the HRSG with sharp corners and steep angles from one module to another and keep them closer to each other. This essentially reduces the overall efficiency of the plant due to gas turbine exhaust flow non-uniformity and re-circulation zones. The existing flow correction device consisting of 32 large tubes running across the sides produces a very large pressure drop. Using CFD, a flow distribution grid is designed, providing at least a 20% improvement in velocity distribution. The second example considers a coal burning boiler performance optimization. In this boiler upgrade project, CFD is used to confirm the feasibility of increasing the capacity and reducing the particulate emissions of the coal fired furnace and steam boiler units. Some of these factors were difficult to evaluate reliably using physical scale modeling techniques that were performed mainly only for cold flow pressure drop analysis. However the experimental results were used for benchmarking the CFD results. A third example shows how fluid dynamic analysis combined with thermal and structural analysis may be used to obtain the thermal fatigue life of various components of a molecular sieve dehydrator unit, where the design life is governed by the thermal loads generated during the regeneration cycle. Based on the fatigue analysis a more effective support is designed to withstand a higher flow capacity thus increasing production.
Skip Nav Destination
ASME 2009 Power Conference
July 21–23, 2009
Albuquerque, New Mexico, USA
Conference Sponsors:
- Power Division
ISBN:
978-0-7918-4350-5
PROCEEDINGS PAPER
Operation Improvement, Reliability and Performance Optimization With Analysis and Simulation
Philip Diwakar,
Philip Diwakar
Bechtel Corporation, Houston, TX
Search for other works by this author on:
Jonathan Berkoe
Jonathan Berkoe
Bechtel National Inc., San Francisco, CA
Search for other works by this author on:
Philip Diwakar
Bechtel Corporation, Houston, TX
Jonathan Berkoe
Bechtel National Inc., San Francisco, CA
Paper No:
POWER2009-81223, pp. 385-392; 8 pages
Published Online:
September 22, 2010
Citation
Diwakar, P, & Berkoe, J. "Operation Improvement, Reliability and Performance Optimization With Analysis and Simulation." Proceedings of the ASME 2009 Power Conference. ASME 2009 Power Conference. Albuquerque, New Mexico, USA. July 21–23, 2009. pp. 385-392. ASME. https://doi.org/10.1115/POWER2009-81223
Download citation file:
10
Views
Related Proceedings Papers
Related Articles
The Combusting Properties of Anthracite in a 410 t/h CFB Boiler
J. Energy Resour. Technol (September,2004)
Fouling Formation in 575 MV Tangential-Fired Pulverized-Coal Boiler
J. Eng. Gas Turbines Power (December,2010)
Test of an Experimental Coal-Burning Turbine
Trans. ASME (November,1956)
Related Chapters
Lay-Up and Start-Up Practices
Consensus on Operating Practices for Control of Water and Steam Chemistry in Combined Cycle and Cogeneration
Numerical Simulation Research on a Fixed Bed Gasifier
International Conference on Information Technology and Management Engineering (ITME 2011)
Scope of Section I, Organization, and Service Limits
Power Boilers: A Guide to the Section I of the ASME Boiler and Pressure Vessel Code, Second Edition