Based on the present revival of coal as the fossil fuel of choice for power generation, there is a high probability that several IGCC projects will materialize in the near future. One of the challenges facing the Owners, EPC Contractors and OEM’s will be to define the performance commercial guarantees and the practical means to determine them. In addition following the current huge upturn in conventional supercritical coal fired power plants, a large number of facilities will conduct thermal performance tests. The proper conductance of the test, data collection and correction to reference conditions, have many technical implications and could affect drastically the commercial outcome of a project both for the Contractor and the Owner. For IGCC plants, in anticipation of this probability, ASME Performance Test Committee had developed a Performance Test Code for such type of plant — PTC 47, which was published in January 2007. In the first part, the paper will provide details about the specific challenges facing the implementation of the Code, in particular the proposed use of the input/output method (mass and energy balance). The presentation will cover other highlights of the code recommendations. The methodology is fully applicable to conventional power plants, since they use same type of fuel. The determination of the heat input based on actual continuous measurement of the mass flow and composition of the coal will be discussed in details. The practicality and the measurement uncertainty associated with fuel composition will also be analyzed. A comparison with the indirect method for determination of the heat input will also be presented. The article will evaluate how the code requirements are reflected in the definition of the power plant design, configuration and instrumentation. The implications of test tolerance as a commercial issue and measurement uncertainty as a technical issue will also be presented and evaluated Other unique aspects of the entire IGCC plant performance testing will be discussed: (1) stability criteria related to the gasification and integration processes, (2) corrections from test to guarantees conditions due to complex chemical, mechanical processes. Finally, the article will indicate the progress on the development of performance evaluation methodologies for other main IGCC components: gasifier, air separation unit, gas cleaning systems and Power Island.
Skip Nav Destination
ASME 2007 Power Conference
July 17–19, 2007
San Antonio, Texas, USA
Conference Sponsors:
- Power Division
ISBN:
0-7918-4273-8
PROCEEDINGS PAPER
Challenges Facing Performance Evaluations of IGCC Power Plants
Justin Zachary,
Justin Zachary
Bechtel Power Corporation, Frederick, MD
Search for other works by this author on:
Alex Khochafian
Alex Khochafian
Bechtel Power Corporation, Frederick, MD
Search for other works by this author on:
Justin Zachary
Bechtel Power Corporation, Frederick, MD
Alex Khochafian
Bechtel Power Corporation, Frederick, MD
Paper No:
POWER2007-22120, pp. 739-748; 10 pages
Published Online:
April 21, 2009
Citation
Zachary, J, & Khochafian, A. "Challenges Facing Performance Evaluations of IGCC Power Plants." Proceedings of the ASME 2007 Power Conference. ASME 2007 Power Conference. San Antonio, Texas, USA. July 17–19, 2007. pp. 739-748. ASME. https://doi.org/10.1115/POWER2007-22120
Download citation file:
10
Views
Related Proceedings Papers
Related Articles
New Technology Trends for Improved IGCC System Performance
J. Eng. Gas Turbines Power (October,1996)
A New Kind of Multifunctional Energy System Based on Moderate Conversion of Chemical Energy of Fossil Fuels
J. Eng. Gas Turbines Power (May,2010)
Next-Generation Integration Concepts for Air Separation Units and Gas Turbines
J. Eng. Gas Turbines Power (April,1997)
Related Chapters
Conclusions
Clean and Efficient Coal-Fired Power Plants: Development Toward Advanced Technologies
Energy Options and Terms: An Introduction
Energy Supply and Pipeline Transportation: Challenges & Opportunities
Alternative Coal-Fired Power Plant Concepts (FBC and IGCC)
Clean and Efficient Coal-Fired Power Plants: Development Toward Advanced Technologies