When a turbine has combined High Pressure (HP) and Intermediate Pressure (IP) sections, there is a steam flow path between the sections. In Combined Cycle steam turbines this internal leakage flow rate needs to be determined for the steam turbine performance calculations. However, since the leakage is internal to the turbine, it cannot be measured directly. One method which has been employed in determining the Mid-packing leakage flow rate is the Variation of Initial and/or Reheat Temperature method. This method is described in the paper “Estimating The Leakage From HP To IP Turbine Sections” presented by J.A. Booth and D.E. Kautzmann. It involves using the convergence of IP efficiency plots from multiple test runs to estimate the HP-IP leakage flow rate. Although this method has been employed successfully in large steam applications, it has generally not produced consistent results for Combined Cycle steam turbines. The lack of convergence for Combined Cycles may be due to the fact that some of the assumptions made in applying the method to large steam applications are not valid for Combined Cycle applications. Some of the assumptions which need to be reviewed and modified for Combined Cycle application are as follows: • Constant IP efficiency for all test runs; • Constant throttle flow during all test runs; • Constant section pressure ratios for all test runs; • No influence of external cooling or admission flows. This paper reviews the modifications to the traditional Initial and/or Reheat temperature variation method to make the Mid-Packing leakage calculations more consistent for Combined Cycle applications. Some data has shown that incorporating these additional changes improves the convergence of Mid-packing leakage determination.
Skip Nav Destination
ASME 2006 Power Conference
May 2–4, 2006
Atlanta, Georgia, USA
Conference Sponsors:
- Power Division
ISBN:
0-7918-4205-3
PROCEEDINGS PAPER
Estimating HP-IP Mid-Span Packing Leakage in Combined Cycles
Tsatsu Fiadjoe
Tsatsu Fiadjoe
GE Energy, Schenectady, NY
Search for other works by this author on:
Tsatsu Fiadjoe
GE Energy, Schenectady, NY
Paper No:
POWER2006-88229, pp. 807-811; 5 pages
Published Online:
October 7, 2008
Citation
Fiadjoe, T. "Estimating HP-IP Mid-Span Packing Leakage in Combined Cycles." Proceedings of the ASME 2006 Power Conference. ASME 2006 Power Conference. Atlanta, Georgia, USA. May 2–4, 2006. pp. 807-811. ASME. https://doi.org/10.1115/POWER2006-88229
Download citation file:
5
Views
Related Proceedings Papers
Related Articles
Estimating HP-IP Midspan Packing Leakage in Combined Cycles
J. Eng. Gas Turbines Power (March,2008)
Simulation of Producer Gas Fired Power Plants with Inlet Fog Cooling and Steam Injection
J. Eng. Gas Turbines Power (July,2007)
Related Chapters
Introduction
Consensus on Operating Practices for Control of Water and Steam Chemistry in Combined Cycle and Cogeneration
Combined Cycle Power Plant
Energy and Power Generation Handbook: Established and Emerging Technologies
Performance Testing of Combined Cycle Power Plant
Handbook for Cogeneration and Combined Cycle Power Plants, Second Edition