During the startup of an early vintage steam turbine-generator unit (prior to engineered steam bypass systems), warming of the steam piping is commonly achieved through numerous small-bore steam line drains that “dump” into the main surface condenser. And in some cases, it is not unusual for these drains to be open till well beyond the point at which full throttle pressure and temperature are achieved at the turbine resulting in high-energy superheated steam flowing at sonic velocities. And most condensers built earlier than 1980 were ill equipped to handle these high-energy drains without damage. Midwest Generation’s Collins Station, like many others, was built before the EPRI guidelines for high-energy drains were written. Consequently, the initial condenser, provided by Southwestern Engineering, did not adequately address these drains. But unlike most other stations, Collins was operated from the beginning as a cycling station, i.e. 50–100 startups per year. Consequently, their condensers have had a significant portion of their operating lives devoted to startup situations with these drains in operation. As a result, the condensers began exhibiting wall distortion and thermal fatigue cracks less than a year into their service life. The station spent the next 25 years repairing, patching, and trying modifications, all without lasting success. In the Fall of 2002, they asked Raymond Professional Group to study the situation and formulate a cost-effective permanent repair.
Skip Nav Destination
ASME 2005 Power Conference
April 5–7, 2005
Chicago, Illinois, USA
Conference Sponsors:
- Power Division
ISBN:
0-7918-4182-0
PROCEEDINGS PAPER
Case Study of an Alternative Solution to a High-Energy Drain Problem in a Surface Condenser
Steven Kidwell
Steven Kidwell
Raymond Professional Group, Inc., Chicago, IL
Search for other works by this author on:
Steven Kidwell
Raymond Professional Group, Inc., Chicago, IL
Paper No:
PWR2005-50120, pp. 87-93; 7 pages
Published Online:
October 27, 2008
Citation
Kidwell, S. "Case Study of an Alternative Solution to a High-Energy Drain Problem in a Surface Condenser." Proceedings of the ASME 2005 Power Conference. ASME 2005 Power Conference. Chicago, Illinois, USA. April 5–7, 2005. pp. 87-93. ASME. https://doi.org/10.1115/PWR2005-50120
Download citation file:
8
Views
Related Proceedings Papers
Related Articles
Condenser Tube Examination Using Acoustic Pulse Reflectometry
J. Eng. Gas Turbines Power (January,2010)
Feasibility Study of an Innovative Dry-Cooling System With Phase-Change Material Storage for Concentrated Solar Power Multi-MW Size Power Plant
J. Sol. Energy Eng (August,2011)
Report Upon Efficiency Tests of a 30,000-Kw. Steam Turbine
Trans. ASME (January,1921)
Related Chapters
Combined Cycle Power Plant
Energy and Power Generation Handbook: Established and Emerging Technologies
Outlook
Closed-Cycle Gas Turbines: Operating Experience and Future Potential
Engineering and Physical Modeling of Power Plant Cooling Systems
Thermal Power Plant Cooling: Context and Engineering