The development of a subsea field implies a complex design procedure with very high costs involved. The combination of low oil price, harsh environment, very deep waters and high drilling costs has emphasized the need for new ideas to reduce both CAPEX and OPEX.

The paper considers different subsea layout scenarios of a typical deep water field. Each scenario is optimized considering pipeline length, equipment cost and flow assurance. The software QUE$TOR is then applied to estimate the cost of each optimized scenario. Two of them are selected for further studies, FPSO connected to six slots subsea manifolds, and subsea separator connected to eight slots cluster manifolds with tie-back to an existing platform. The latter representing a hybrid solution based on the subsea-to-shore concept. Cost and technical feasibility are considered in order to evaluate the two scenarios.

This content is only available via PDF.